Sec. 98-407. - Performance standards.
(a) Responsible party. The responsible party shall implement a post-construction stormwater management plan that incorporates the requirements of this section. (b) Plan. A written stormwater management plan in accordance with section 98-409 shall be developed and implemented for each post-construction site. (c) Requirements. The plan required under subsection (2) shall include the following: (1) Total suspended solids. BMPs shall be designed, installed and maintained to control total suspended solids carried in runoff from the post-construction site as follows: a. For new development, by design, reduce to the maximum extent practicable, the total suspended solids load by 80 percent, based on the average annual rainfall, as compared to no runoff management controls. No person shall be required to exceed an 80 percent total suspended solids reduction to meet the requirements of this subdivision. b. For redevelopment, by design, reduce to the maximum extent practicable, the total suspended solids load by 40 percent, based on the average annual rainfall, as compared to no runoff management controls. No person shall be required to exceed a 40 percent total suspended solids reduction to meet the requirements of this subdivision. c. For in-fill development under five acres that occurs within ten years after October 1, 2002, by design, reduce to the maximum extent practicable, the total suspended solids load by 40 percent, based on an average annual rainfall, as compared to no runoff management controls. No person shall be required to exceed a 40 percent total suspended solids reduction to meet the requirements of this subdivision. d. For in-fill development that occurs ten or more years after October 1, 2002, by design, reduce to the maximum extent practicable, the total suspended solids load by 80 percent, based on an average annual rainfall, as compared to no runoff management controls. No person shall be required to exceed an 80 percent total suspended solids reduction to meet the requirements of this subdivision. e. Notwithstanding subsections a. to d., if the design cannot achieve the applicable total suspended solids reduction specified, the stormwater management plan shall include a written and site-specific explanation why that level of reduction is not attained and the total suspended solids load shall be reduced to the maximum extent practicable. (2) Peak discharge. a. By design, BMPs shall be employed to maintain or reduce the peak runoff discharge rates, to the maximum extent practicable, as compared to predevelopment conditionally the two-year, 24-hour design storm applicable to the postconstruction site. Predevelopment conditions shall assume "good hydrologic conditions" for appropriate land covers as identified in TR-55 or an equivalent methodology. The meaning of "hydrologic soil group" and "runoff curve number" are as determined in TR-55. However, when predevelopment land cover is cropland, rather than using TR-55 values for cropland, the runoff curve numbers in Table 1 shall be used. Table 1. Maximum Predevelopment Runoff Curve Numbers for Cropland Areas Hydrologic soil group | A | B | C | D Runoff curve number | 56 | 70 | 79 | 83 b. This subsection of the article does not apply to any of the following: 1. A postconstruction site where the change in hydrology due to development does not increase the existing surface water elevation at any point within the downstream receiving water by more than 0.01 of a foot for the two-year, 24-hour storm event. 2. A redevelopment postconstruction site. 3. An in-fill development area less than five acres. (3) Infiltration. BMPs shall be designed, installed, and maintained to infiltrate runoff to the maximum extent practicable in accordance with the following, except as provided in subsections e. through g. a. For residential developments one of the following shall be met: 1. Infiltrate sufficient runoff volume so that the postdevelopment infiltration volume shall be at least 90 percent of the predevelopment infiltration volume, based on an average annual rainfall. However, when designing appropriate infiltration systems to meet this requirement, no more than one percent of the project site is required as an effective infiltration area. 2. Infiltrate 25 percent of the post-development runoff from the two-year 24-hour design storm with a type II distribution. Separate curve numbers for pervious and impervious surfaces shall be used to calculate runoff volumes and not composite curve numbers as defined in TR-55. However, when designing appropriate infiltration systems to meet this requirement, no more than one percent of the project site is required as an effective infiltration area. b. For nonresidential development, including commercial, industrial and institutional development, one of the following shall be met: 1. Infiltrate sufficient runoff volume so that the postdevelopment infiltration volume shall be at least 60 percent of the predevelopment infiltration volume, based on an average annual rainfall. However, when designing appropriate infiltration systems to meet this requirement, no more than two percent of the project site is required as an effective infiltration area. 2. Infiltrate ten percent of the runoff from the two-year 24-hour design storm with a type II distribution. Separate curve numbers for pervious and impervious surfaces shall be used to calculate runoff volumes, and not composite curve numbers as defined in TR-55. However, when designing appropriate infiltration systems to meet this requirement, no more than two percent of the project site is required as an effective infiltration area. c. Predevelopment condition shall be the same as in subsection (c)(2). d. Before infiltrating runoff, pretreatment shall be required for parking lot runoff and for runoff from new road construction in commercial, industrial and institutional areas that will enter an infiltration system. The pretreatment shall be designed to protect the infiltration system from clogging prior to scheduled maintenance and to protect groundwater quality in accordance with subsection (c)(3)g. Pretreatment options may include, but are not limited to, oil/grease separation, sedimentation, biofiltration, filtration, swales or filter strips. e. Exclusions. The runoff from the following areas are prohibited from meeting the requirements of section 98-407: 1. Areas associated with tier 1 industrial facilities identified in Wisconsin Administrative Code § 216.21(2)(a), including storage, loading, rooftop and parking. 2. Storage and loading areas of tier 2 industrial facilities identified in Wisconsin Administrative Code § NR 216.21(2)(b). 3. Fueling and vehicle maintenance areas. 4. Areas within 1,000 feet upgradient or within 100 feet downgradient of karst features. 5. Areas with less than three feet separation distance from the bottom of the infiltration system to the elevation of seasonal high groundwater or the top of bedrock, except this subsection e.5. does not prohibit infiltration of roof runoff. 6. Areas with runoff from industrial, commercial and institutional parking lots and roads and residential arterial roads with less than five feet separation distance from the bottom of the infiltration system to the elevation of seasonal high groundwater or the top of bedrock. 7. Areas within 400 feet of a community water system well as specified in Wisconsin Administrative Code § NR 811.16(4), or within 100 feet of a private well as specified in Wisconsin Administrative Code § NR 812.08(4), for runoff infiltrated from commercial, industrial and institutional land uses or regional devices for residential development. 8. Areas where contaminants of concern, as defined in Wisconsin Administrative Code § NR 720.03(2) are present in the soil through which infiltration will occur. 9. Any area where the soil does not exhibit one of the following soil characteristics between the bottom of the infiltration system and the seasonal high groundwater and top of bedrock: at least a three-foot soil layer with 20 percent fines or greater; or at least a five-foot soil layer with ten percent fines or greater. This does not apply where the soil medium within the infiltration system provides an equivalent level of protection. This subsection e.9. does not prohibit infiltration of roof runoff. f. Exemptions. The following are not required to meet the requirements of section 98-407: 1. Areas where the infiltration rate of the soil is less than 0.6 inches/hour measured at the site. 2. Parking areas and access roads less than 5,000 square feet for commercial and industrial development. 3. Redevelopment postconstruction sites. 4. In-fill development areas less than five acres. 5. Infiltration areas during periods when the soil on the site is frozen. 6. Roads in commercial, industrial and institutional land uses, and arterial residential roads. g. Additional provisions. 1. Infiltration systems designed in accordance with this paragraph shall, to the extent technically and economically feasible, minimize the level of pollutants infiltrating to groundwater and shall maintain compliance with the preventive action limit at a point of standards application in accordance with Wisconsin Administrative Code ch. NR 140. However, if site specific information indicates that compliance with a preventive action limit is not achievable, the infiltration BMP may not be installed or shall be modified to prevent infiltration to the maximum extent practicable. 2. Notwithstanding subsection (c)(3)g.1, the discharge from BMPs shall remain below the enforcement standard at the point of standards application. (4) Protective areas. a. "Protective area" means an area of land that commences at the top of the channel of lakes, streams and rivers, or at the delineated boundary of wetlands, and that is the greatest of the following widths, as measured horizontally from the top of the channel or delineated wetland boundary to the closest impervious surface. However, in this paragraph, "protective area" excludes any area of land adjacent to any stream enclosed within a pipe or culvert, such that runoff cannot enter the enclosure at this location. 1. For outstanding resource waters and exceptional resource waters, and for wetlands in areas of special natural resource interest as specified in § NR 103.04, 75 feet. 2. For perennial and intermittent streams identified on a United States geological survey 7.5-minute series topographic map, or a county soil survey map, whichever is more current, 50 feet. 3. For lakes, 50 feet. 4. For highly susceptible wetlands, 50 feet. Highly susceptible wetlands include the following types: fens, sedge meadows, bogs, low prairies, conifer swamps, shrub swamps, other forested wetlands, fresh wet meadows, shallow marshes, deep marshes and seasonally flooded basins. Wetland boundary delineations shall be made in accordance with § NR 103.08(1m). This subparagraph does not apply to wetlands that have been completely filled in accordance with all applicable state and federal regulations. The protective area for wetlands that have been partially filled in accordance with all applicable state and federal regulations shall be measured from the wetland boundary delineation after fill has been placed. 5. For less susceptible wetlands, ten percent of the average wetland width, but no less than ten feet nor more than 30 feet. Less susceptible wetlands include degraded wetlands dominated by invasive species such as reed canary grass. 6. In subsections (c)(4)a.1., 4. and 5., determinations of the extent of the protective area adjacent to wetlands shall be made on the basis of the sensitivity and runoff susceptibility of the wetland in accordance with the standards and criteria in § NR 103.03. 7. For concentrated flow channels with drainage areas greater than 130 acres, ten feet. b. This paragraph applies to postconstruction sites located within a protective area, except those areas exempted pursuant to subsection (c)(4)d. c. The following requirements shall be met: 1. Impervious surfaces shall be kept out of the protective area to the maximum extent practicable. The stormwater management plan shall contain a written site-specific explanation for any parts of the protective area that are disturbed during construction. 2. Where land disturbing construction activity occurs within a protective area, and where no impervious surface is present, adequate sod or self-sustaining vegetative cover of 70 percent or greater shall be established and maintained. The adequate sod or self-sustaining vegetative cover shall be sufficient to provide for bank stability, maintenance of fish habitat and filtering of pollutants from upslope overland flow areas under sheet flow conditions. Non-vegetative materials, such as rock riprap, may be employed on the bank as necessary to prevent erosion, such as on steep slopes or where high velocity flows occur. 3. Best management practices such as filter strips, swales, or wet detention basins that are designed to control pollutants from nonpoint sources may be located in the protective area. d. This subsection (c)(4) does not apply to: 1. Redevelopment postconstruction sites. 2. In-fill development areas less than five acres. 3. Structures that cross or access surface waters such as boat landings, bridges and culverts. 4. Structures constructed in accordance with Wis. Stats. § 59.692(1v). 5. Post-construction sites from which runoff does not enter the surface water, except to the extent that vegetative ground cover is necessary to maintain bank stability. (5) Fueling and vehicle maintenance areas. Fueling and vehicle maintenance areas shall, to the maximum extent practicable, have BMPs designed, installed and maintained to reduce petroleum within runoff, such that the runoff that enters waters of the state contains no visible petroleum sheen. (6) Swale treatment for transportation facilities. a. Applicability. Except as provided in subsection 2., transportation facilities that use swales for runoff conveyance and pollutant removal meet all of the requirements of this section, if the swales are designed to the maximum extent practicable to do all of the following: 1. Be vegetated. However, where appropriate, non-vegetative measures may be employed to prevent erosion or provide for runoff treatment, such as rock riprap stabilization or check dams. 2. Carry runoff through a swale for 200 feet or more in length that is designed with a flow velocity no greater than 1.5 feet per second for the peak flow generated using either a two-year, 24-hour design storm or a two-year storm with a duration equal to the time of concentration as appropriate. If a swale of 200 feet in length cannot be designed with a flow velocity of 1.5 feet per second or less, then the flow velocity shall be reduced to the maximum extent practicable. b. Exemptions. The commissioner may, consistent with water quality standards, require other provisions of this section be met on a transportation facility with an average daily travel of vehicles greater than 2500 and where the initial surface water of the state that the runoff directly enters is any of the following: 1. An outstanding resource water. 2. An exceptional resource water. 3. Waters listed in § 303(d) of the federal clean water act that are identified as impaired in whole or in part, due to nonpoint source impacts. 4. Waters where targeted performance standards are developed under Wisconsin Administrative Code § NR 151.004, to meet water quality standards. (d) General considerations for on-site and off-site stormwater management measures. The following considerations shall be observed in managing runoff: (1) Natural topography and land cover features such as natural swales, natural depressions, native soil infiltrating capacity, and natural groundwater recharge areas shall be preserved and used, to the extent possible, to meet the requirements of this section. (2) Emergency overland flow for all storm water facilities shall be provided to prevent exceeding the safe capacity of downstream drainage facilities and prevent endangerment of downstream property or public safety. (e) Location and regional treatment option. (1) The BMPs may be located on-site or off-site as part of a regional stormwater device, practice or system. (2) Post-construction runoff within a nonnavigable surface water that flows into a BMP, such as a wet detention pond, is not required to meet the performance standards of this article. Postconstruction BMPs may be located in nonnavigable surface waters. (3) Except as allowed under subsection (c)(4), postconstruction runoff from new development shall meet the postconstruction performance standards prior to entering a navigable surface water. (4) Postconstruction runoff from any development within a navigable surface water that flows into a BMP is not required to meet the performance standards of this article if: a. The BMP was constructed prior to the effective date of this article and the BMP either received a permit issued under Wis. Stats. ch. 30, or the BMP did not require a Wis. Stats. ch. 30 permit; and b. The BMP is designed to provide runoff treatment from future upland development. (5) Runoff from existing development, redevelopment and in-fill areas shall meet the postconstruction performance standards in accordance with this paragraph. a. To the maximum extent practicable, BMPs shall be located to treat runoff prior to discharge to navigable surface waters. b. Postconstruction BMPs for such runoff may be located in a navigable surface water if allowable under all other applicable federal, state and local regulations such as Wisconsin Administrative Code ch. NR 103, and Wis. Stats. ch. 30. (6) The discharge of runoff from a BMP, such as a wet detention pond, or after a series of such BMPs is subject to this article. (7) The commissioner may approve off-site management measures provided that all of the following conditions are met: a. The postconstruction runoff is covered by a stormwater management system plan that is approved by the city and that contains management requirements consistent with the purpose and intent of this article. b. The off-site facility meets all of the following conditions: 1. The facility is in place. 2. The facility is designed and adequately sized to provide a level of stormwater control equal to or greater than that which would be afforded by on-site practices meeting the performance standards of this article. 3. The facility has a legally obligated entity responsible for its long-term operation and maintenance. (8) Where a regional treatment option exists such that the commissioner exempts the applicant from all or part of the minimum on-site stormwater management requirements, the applicant shall be required to pay a one-time fee in an amount calculated by multiplying the total cost of the regional treatment facility by the percentage of the total flow to the regional treatment facility contributed by the applicant's property. (f) Alternate requirements. The commissioner may establish stormwater management requirements more stringent than those set forth in this section if he determines that an added level of protection is needed to protect sensitive resources.
(Ord. No. 21-04, pt. 1, 8-2-04)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.