§ 98-409 — Stormwater management plan
Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 98-409
Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/3d357128-6d42-4e05-abee-b8331c69fad6
Sec. 98-409. - Stormwater management plan.
(a) Plan requirements. The stormwater management plan required under subsection 98-407(b) shall contain at a minimum the following information: (1) Name, address, and telephone number for the following or their designees: landowner; developer; project engineer for practice design and certification; person(s) responsible for installation of stormwater management practices; and person(s) responsible for maintenance of stormwater management practices prior to the transfer, if any, of maintenance responsibility to another party. (2) A location map and legal description of the property proposed to be developed, referenced to the U.S. Public Land Survey system or to block and lot numbers within a recorded land subdivision plat. (3) Predevelopment site conditions, including: a. One or more site maps at a scale of not less than one inch equals 50 feet. The site maps shall show the following: site location and legal description of the property; predominant soil types and hydrologic soil groups; existing cover type and condition; topographic contours of the site at a scale not to exceed two feet; topography and drainage network including enough of the contiguous properties to show runoff patterns onto, through, and from the site; watercourses that may affect or be affected by runoff from the site; flow path and direction for all stormwater conveyance sections; watershed boundaries used in hydrology determinations to show compliance with performance standards; lakes, streams, wetlands, channels, ditches, and other watercourses on and immediately adjacent to the site; limits of the 100-year floodplain; location of wells and wellhead protection areas covering the project area and delineated pursuant to Wisconsin Administrative Code § NR 811.16. b. Hydrology and pollutant loading computations as needed to show compliance with performance standards. All major assumptions used in developing input parameters shall be clearly stated. The geographic areas used in making the calculations shall be clearly cross-referenced to the required map(s). (4) Postdevelopment site conditions, including: a. Explanation of the provisions to preserve and use natural topography and land cover features to minimize changes in peak flow runoff rates and volumes to surface waters and wetlands. b. Explanation of any restrictions on stormwater management measures in the development area imposed by wellhead protection plans and ordinances. c. One or more site maps at a scale of not less than one inch equals 50 feet showing the following: postconstruction pervious areas including vegetative cover type and condition; impervious surfaces including all buildings, structures, and pavement; postconstruction topographic contours of the site at a scale not to exceed two feet; postconstruction drainage network including enough of the contiguous properties to show runoff patterns onto, through, and from the site; locations and dimensions of drainage easements; locations of maintenance easements specified in the maintenance agreement; flow path and direction for all stormwater conveyance sections; location and type of all stormwater management conveyance and treatment practices, including the on-site and off-site tributary drainage area; location and type of conveyance system that will carry runoff from the drainage and treatment practices to the nearest adequate outlet such as a curbed street, storm drain, or natural drainage way; watershed boundaries used in hydrology and pollutant loading calculations and any changes to lakes, streams, wetlands, channels, ditches, and other watercourses on and immediately adjacent to the site. d. Hydrology and pollutant loading computations as needed to show compliance with performance standards. The computations shall be made for each discharge point in the development, and the geographic areas used in making the calculations shall be clearly cross-referenced to the required map(s). e. Results of investigations of soils and groundwater required for the placement and design of stormwater management measures. Detailed drawings including cross-sections and profiles of all permanent stormwater conveyance and treatment practices. (5) A description and installation schedule for the stormwater management practices needed to meet the performance standards in section 98-407. (6) A maintenance plan developed for the life of each stormwater management practice including the required maintenance activities and maintenance activity schedule. (7) Cost estimates for the construction, operation, and maintenance of each stormwater management practice. (8) Other information requested in writing by the commissioner to determine compliance of the proposed stormwater management measures with the provisions of this article. (9) All site investigations, plans, designs, computations, and drawings shall be certified by a registered professional engineer licensed in the State of Wisconsin to be prepared in accordance with accepted engineering practice and requirements of this article. (b) Alternate requirements. The commissioner may prescribe alternative submittal requirements for applicants seeking an exemption to on-site stormwater management performance standards under section 98-407(e).
(Ord. No. 21-04, pt. 1, 8-2-04)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
