12.16.090 - Performance of work.
All work performed pursuant to the issuance of an excavation permit shall be done as follows: A. Where trench structure excavation requires the removal of curb gutter, concrete sidewalks, or asphaltic or concrete pavement by means of backhoes, graders or loaders, the asphalt or concrete shall be cut before any excavating in a straight line parallel to the edge of the excavation by the use of a spade bitted air hammer, concrete saw, or similar approved equipment, to obtain a straight vertical edge. B. When trench excavation is performed by a trencher, asphalt pavement need not be cut prior to excavating operations. However, should trenching operations begin to pull, lift and/or tear existing asphalt pavement, the trenching operation shall be discontinued until the asphalt is cut parallel to the edge of the excavation. The city engineer or his/her designee shall retain sole authority to determine whether the asphalt shall be cut prior to any excavating. The minimum width of pavement removal for utilities greater than six feet in depth shall not be less than eight feet, unless otherwise approved by the city engineer. All necessary corners shall be cut at not more than a forty-five degree angle to the trench excavation. C. Upon completion of trenching and backfilling, applicant shall cut and remove both edges of the asphalt or concrete pavement, one foot wider than the edge of the excavation. The cutting method shall be similar to that previously described. D. Rotomilling may be substituted instead of trimming asphalt or concrete pavement as outlined in subsection B above. This work shall include rotomilling both trench edges twelve inches wide to a depth no less than one and one-half inches. Rotomilling of trench edges shall not be considered an approved option if the trench excavation material is of a noncohesive property and undermines any edge of the existing asphalt pavement. E. All applicable asphaltic materials, equipment, paving plant requirements, construction methods, and testing and sampling shall meet those technical specifications in Article 8 of the standards. F. A bituminous tack coat shall be applied to all curbs, gutter, sidewalk and existing pavement edges prior to any pavement replacement. All materials and procedures shall be in accordance with the technical specifications in Article 7, Bituminous Tack Coat, of the standards. G. All applicable portland cement materials, equipment, batching plant equipment, construction requirements, execution of work, conditioning of subgrade, placing concrete, and finish work shall meet those technical specifications set forth in the standard specifications for public works construction and infrastructure improvements. H. All trench backfilling shall be performed in accordance with standards set forth in the standard specifications for public works construction and infrastructure improvements. I. Upon completion of the work, all surplus construction materials and debris shall be removed, leaving the entire site free, clean, and in a neat condition. J. The applicant or his agent shall be responsible for the removal and replacement of the concrete curb, gutter, and sidewalk, and pavement, and such shall be made within seven working days after backfill completed, weather permitting. K. All excavation, backfilling and resurfacing work shall be performed by the applicant or his agent. Upon completion of the work, the applicant or his agent shall give immediate notice to the city engineer that such work has been completed. L. The applicant shall assume the responsibility for any damage to underground facilities caused by the trenching, backfilling, resurfacing, or any other activities of the work. M. Where excavations occur in unpaved surfaces, the area shall be restored by placing a minimum of two inches of stabilized gravel on the surface of the excavation. Stabilized gravel shall be equal to material meeting Wyoming coarse concrete aggregate (minus three-fourths inch) as specified in the standards. N. 1. The minimum thickness for asphaltic concrete pavement shall be: Street Classification | Pavement Replacement Residential/alley | 4 inches asphaltic concrete surface over 6 inches of grading "w" base course Collector/arterial | 6 inches asphaltic concrete surface course over 8 inches of grading "w" base course 2. The city engineer's office will provide to the applicant, the functional classification of the street. Exemptions to the above pavement replacement guideline may only be granted by the city engineer. O. All topsoil and sod removed by the contractor shall be replaced. P. When making excavations, the various materials excavated shall be piled separately. All concrete and bituminous materials, any soils which cannot be properly compacted, and all other deleterious materials shall be removed from the construction site and properly disposed of in accordance with applicable laws. Q. All materials used for backfilling shall be compactible so as to meet the minimum density and moisture requirements spelled out in the city's construction standards. Backfill material may contain coarse materials up to six inches in diameter, but shall be free from large pieces of rock, frozen material, concrete, roots, stumps, tin cans, rubbish, and other similar articles whose presence in the backfill would, in the opinion of the city engineer or his/her designee, cause settlement of the trench or damage to the installed improvement. Material shall have a maximum plasticity index of six and not exhibit pumping characteristics when proof rolled. R. All backfill shall be placed to be thoroughly compacted utilizing compaction methods suitable for the type of backfill being placed and to meet the city specifications for minimum density. S. As a condition of the permit, the applicant shall guarantee his work for a period of two years from the date of final completion of the work. If settlement equal to or greater than one-half inch or pavement separation equal to or greater than one-quarter inch occurs at the site of the excavation, or immediately adjacent thereto, at any time within two years from the date of final completion of the original restoration, the applicant shall be responsible for repairing such settled or separated areas in accordance with the directions of the city engineer. In addition, the applicant shall be responsible for reimbursing the city for any expenses incurred in the placement of warning devices and barricades for the protection of traffic because of such settlement.
(Ord. 5-02 § 1, 2002; Ord. 5-93 § 1(part), 1993: Ord. 7-88 (part), 1988; Ord. 28-83 § 1(part), 1983: prior code § 34-24)
Ask a question about Casper law
Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.