For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.20.380 — Bypass

Cheyenne Municipal Code, Cheyenne, Wyoming (Supp. No. 73: covering ordinances through No. 4662, passed March 23, 2026) · Cheyenne Municipal Code § 13.20.380

Corpus is an independent public-information project, not the official City of Cheyenne website. Stable reference: corpuslaw.us/code/1a368ce5-15fa-455d-821f-da82ddb3e24c

13.20.380 - Bypass.

A. Bypass not Violating Applicable Pretreatment Standards or Requirements. 1. An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if the bypass is necessary for essential maintenance to assure efficient operation. These bypasses are not subject to subsections B and C of this section. B. Notice. 1. If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the BOPU, if possible at least ten (10) days before the date of the bypass. 2. An industrial user shall give written and verbal notification to the BOPU of an unanticipated bypass that exceeds applicable pretreatment standards or requirements within twenty-four (24) hours of becoming aware of the bypass. A written report shall also be provided within five days of becoming aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact times and dates, and if the bypass has not been corrected, the time it is expected to continue; and steps taken or planned to reduce, eliminate and prevent recurrence of the bypass. The BOPU may waive the written report on a case-by-case basis if the verbal report has been received within twenty-four (24) hours. C. Prohibition of Bypass. 1. Bypass is prohibited and the BOPU may take enforcement action against an industrial user for a bypass, unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; b. There are no feasible alternatives to bypass, such as use of auxiliary treatment facilities, retention of wastes or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent bypass which occurred during normal periods of equipment downtime or preventative maintenance; and c. The industrial user submitted notices as required by subsection B of this section. 2. The BOPU may approve an anticipated bypass, after considering its adverse effects, if the BOPU determines that it will meet the three conditions listed in subsection C.1 of this section.

(Ord. No. 4416, § 1, 2-28-22; Ord. No. 4002, § 1, 10-28-13)

Ask a question about Cheyenne law

Corpus searches the Cheyenne sections it holds and shows the ones that match, with their citations. Free, no sign-in.