13.20.390 - Upset provisions.
A. Definition. 1. For the purposes of this section, "upset" means an exceptional incident in which there is unintentional and temporary noncompliance with pretreatment standards because of factors beyond the reasonable control of the industrial user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. B. Effect of an Upset. 1. An upset shall constitute an affirmative defense to an action brought for noncompliance with pretreatment standards if the requirements of subsection C of this section are met. C. Conditions Necessary for a Demonstration of Upset. 1. An industrial user who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence, that: a. An upset occurred and the industrial user can identify the cause(s) of the upset; b. The facility was at the time being operated in a prudent and workmanlike manner and in compliance with applicable industrial user O&M procedures; and c. The industrial user has submitted the following information to the BOPU within twenty-four (24) hours of becoming aware of the upset (if this information is provided verbally, a written submission must be provided within five days): i. A description of the discharge and cause of noncompliance; ii. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and iii. Steps being taken and/or planned to reduce, eliminate and prevent recurrence of the noncompliance. D. Burden of Proof. 1. In an enforcement proceeding the industrial user seeking to establish the occurrence of an upset shall have the burden of proof to prove that the conditions from subsection C.1.c above have been met. E. Reviewability of Agency Consideration of Claims of Upset. 1. In the usual exercise of prosecutorial discretion, agency enforcement personnel should review any claims that non-compliance was caused by an upset. No determinations made in the course of the review constitute final agency action subject to judicial review. Industrial users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action as defined in the BOPU enforcement response plan brought for noncompliance with categorical pretreatment standards. F. User Responsibility in Case of Upset. 1. The industrial user shall control production of all discharges to the extent necessary to maintain compliance with pretreatment standards upon reduction, loss or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost or fails.
(Ord. No. 4416, § 1, 2-28-22; Ord. No. 4002, § 1, 10-28-13)
Ask a question about Cheyenne law
Corpus searches the Cheyenne sections it holds and shows the ones that match, with their citations. Free, no sign-in.