For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.52.040 — Permit application—Fees

Cheyenne Municipal Code, Cheyenne, Wyoming (Supp. No. 73: covering ordinances through No. 4662, passed March 23, 2026) · Cheyenne Municipal Code § 15.52.040

Corpus is an independent public-information project, not the official City of Cheyenne website. Stable reference: corpuslaw.us/code/645ef5e6-3b7b-43f9-8101-3a15e61396a5

15.52.040 - Permit application—Fees.

A. Any person desiring to obtain a solar right must first make application to the city engineer for a solar access permit. A permit application for a solar right will consist of the following materials: 1. The original and two copies of a completed solar access permit application on forms provided by the city engineer; 2. A review fee of thirty-five dollars ($35.00) made payable to the city of Cheyenne; 3. The names and mailing addresses of all potentially affected owners; 4. The original and two copies of a site plan drawn to a scale showing at least the following detail: a. Title block containing owner's name, street address of the site and use of the structure(s), b. North arrow, scale and date of preparation of the plan, c. Names of all adjacent streets, d. Dimensions of property, e. Legal description of the parcel of property to be benefitted by the solar access permit, f. Dimensions, heights and location of all fences, walls and other structures on the site and on the real property of all potentially affected owners, g. Location, height and type (common name) of all trees, bushes and shrubs on the site, and on the real property of all potentially affected owners, h. Legal description of the parcels of real property belonging to potentially affected owners which would be burdened by the solar access permit, i. Design, construction and orientation of solar collector, j. For existing solar collectors, the first date the solar collector was beneficially used, k. Such topographical information and engineering calculations as may be necessary in the city engineer's discretion to document the solar right, l. Degree line from base of collector, as measured above the horizon, m. Signature block for city engineer's approval. B. Any person desiring to obtain a solar right will, in addition to making application to the city engineer for a solar access permit, publish, at his or her own expense, a copy of the notice of the application in a newspaper of general circulation in the city once a week for three consecutive weeks, and furnish proof of said publication to the city engineer. The notice shall state that a named applicant has applied for a solar access permit; the street address of the proposed solar collector; the type of solar collector to be constructed; the date, not sooner than ten (10) days after the last date of publication, which a person or persons may file written comments with the city engineer with respect to the issuance of the solar access permit.

(2001 In-house code § 39-4)

Ask a question about Cheyenne law

Corpus searches the Cheyenne sections it holds and shows the ones that match, with their citations. Free, no sign-in.