30.20 - INSTALLATION REQUIREMENTS FOR GAS CONVERSION BURNERS.

(1) Preparation of Existing Heating Appliance. Thoroughly clean the ash pit, flue passage and combustion chamber of the furnace or boiler, removing all adhering tars, scale or dirt. (2) Reconditioning the Existing Heating Appliance. (a) If cracks or fractures, especially above the grate level are found in any of the castings after they have been cleaned, the casting shall be replaced. Cracks or fractures in other materials shall be repaired or the parts replaced and the appliance made gas tight as shown by smoke bomb test or equivalent. (b) All joints between sections shall be properly cemented and the ash pit tightly grouted to the floor. Openings for grate shaker bars, cracks around door frames, and cracks such as under clinker doors, shall be tightly sealed with furnace cement. (c) Firing door catches shall be filed or otherwise altered so that the firing door will open easily to relieve pressure. Positive latches shall be removed from the appliance and replaced by either light sheet metal catches, a spring placed on the hinge pin to keep the door closed or an equivalent arrangement which will permit the door to open and relieve any excessive pressure which may occur in the furnace. Latches on firing doors shall hold such firing doors close to the frame without exposing or forming any cracks. (d) Where revertible or diving flue type furnaces or boilers are converted to gas firing, it is required that small opening or passage, not less than one (1) inch pipe, be provided between the top of the highest point in the flue passage of the appliance and its vertical flue pipe. If there is a bypass, open the bypass slightly and lock it in position. (e) Where the burner is installed at approximately grate level and the furnace is lined with a refractory material, this material shall be removed down to the level of the burner except where the refractory material forms the only wall between the combustion chamber and the furnace front shield. (f) When inshot type conversion burners are installed in dry base boilers or gravity warm air furnaces, the ash pit shall be lined for protection in accordance with the manufacturer's installation instructions, or as follows: 1. With at least two (2) inches of insulating fire brick which covers the ash pit bottom. 2. With at least two (2) inches of insulating fire brick along the sidewalls of the ash pit up to the level of the water back surface of a boiler or sufficiently high to protect the grate lugs of a furnace. (g) Where inshot type conversion burners are installed, the floor area of a combustion chamber shall be in accordance with the burner manufacturer's instructions or recommendations; however, in the absence of such instructions, it shall be at least one and one-half (1½) square inches per one thousand (1,000) BTU per hour input of the burner. (h) The water column and gauge glass on a steam boiler shall be clean, with the water level plainly visible. The connections from gauge glass to boiler shall be free and unobstructed. (i) The chimney shall be examined and thoroughly cleaned, if necessary, before installation is made. (j) Every conversion burner, upon completion of its installation, shall not be left in operation unless the burner has been properly adjusted so that the products of combustion shall contain not more than (.04%) of carbon monoxide. Samples of the gas shall be taken from breeching at a point as near to the furnace or boiler as possible. In no case shall the samples be taken from a point between the draft hood or barometric draft control and the chimney, or through the relief openings of the draft hood or barometric draft control. (3) Installation of Burner and Controls. (a) The installation of gas conversion burners having inputs not exceeding four hundred thousand (400,000) BTU per hour shall be installed in accordance with the following provisions: Every conversion gas burner installed in the City of Madison shall bear the symbol of a recognized testing agency certifying compliance with the American Standard Listing Requirements for Domestic Gas Conversion Burners. It shall consist of a factory assembled and factory inspected unit supplied with an automatic pilot, automatic gas control valve, including, when necessary, proper transformer to operate the gas valve, gas pressure regulator, (except on burners certified for use on liquefied petroleum gases), manual mainline shutoff calve, pilot shutoff valve, tubing or piping for pilot gas supply tubing for bleedline from diaphragm valves when employed. Installation of burner shall be so planned that it and all its controls will be readily accessible for inspection, cleaning, adjustment and repairs. (b) Installing the Burner. 1. The burner shall be solidly supported on fireproof material, both front and rear, and shall be level in both directions. No portion of the combustion air door opening of the burner shall be closed off by the seal covering the ash pit opening. Care shall be exercised when installing the burner to avoid undue strain on, or distortion of, duct or other components which would impair the fit, alignment or mechanical functioning of parts, such as pilots, positions of orifices with respect to venturi, combustion air door, etc. 2. For drilled port of multi-jet upshot type conversion burners installed in boilers, the burner ports shall be at least one (1) inch above grate level. For single port upshot burners, the above dimension shall apply to the bottom of the flame spreader. 3. For drilled port of multi-jet upshot type conversion burners installed in warm air furnaces, the burner ports shall be set above the grate level but not more than one-third (⅓) the distance between the grate and the bottom level of the firing door. For single port upshot burners, the above dimension shall apply to the bottom of the flame spreader. If the level of the burner port is below the highest point of the return air connection to the furnace casing, provisions shall be made to assure against counter circulation. 4. Burners shall be so placed with respect to the firebox dimensions as to uniformly distribute the heat over as much of the available heating surface as possible. Where the burner is appreciably shorter than the firebox, it shall be placed at the end of the firebox which will insure the longest flue travel. In some instances, it may be necessary to install air directing baffles to insure proper distribution of combustion air within the flame zone and to thereby prevent floating flame conditions on one side of the burner. 5. Firing door (fuel door) type burners shall be installed in accordance with the burner manufacturer's instructions. The burner ports shall be located with respect to the side walls of the combustion chamber so as to provide the longest travel for the products of combustion and to avoid direct flame impingement. 6. After the supply line has been connected to the burner, close the space between the ash pit opening and the air duct (and/or air door shield) in a permanent manner which will preclude entrance of combustion air except through the air duct. The use of sheet metal or hard asbestos board, neatly fitted, will facilitate servicing at a later date. 7. All gas burners installed in the revertible flue type of equipment, exceeding a twelve (12) inch down draft, shall be provided with a complete shutoff type automatic pilot unless equipped with adequate bleeder connections. (c) Union for Connecting Burner to House Piping. A union shall be installed in the gas line downstream from the manual main shutoff valve. (d) Controls. (Refer to Section 30.25) (4) Installation Requirements for Conversion Burners Having Inputs Exceeding 400,000 BTU Per Hour. (a) Approval of Gas Burner. 1. It shall be unlawful for any person, firm, corporation or their agents, to install any gas burner which has not been approved by the National Board of Fire Underwriters' Laboratory, or any other nationally recognized inspection board or laboratory. Any burner which does not meet the above requirements shall not be installed until a certificate of approval has been issued. 2. Application for approval shall give the following information: a. Name of burner. b. Name and address of manufacturer. c. Past history of company and burner. d. Furnish detailed drawings and specification sheets. 3. Every gas burner fired in excess of four hundred thousand (400,000) BTU per hour input shall be equipped with electronic combustion safeguard. (b) Main Burner. 1. A burner shall be installed so that fuel and air will be completely mixed to assure efficient combustion within the combustion chamber, without injurious flame impingement on heating surfaces or refractories, vibration or pulsation, formation of soot, and without flame leaving any part of the burner throughout the entire range of operation. Burners shall be installed firmly in place to maintain correct alignment and shall be readily accessible for cleaning and inspection. All burner intake air louvers for manual operation shall be equipped with a mechanical locking device to prevent accidental closure, or if louvers are to be operated automatically, they shall be weighted to open in the event of linkage failure. 2. Load requirements of every job shall be satisfied by equipment within proper range of manufacturers' ratings. 3. The burner or burners and their component parts shall be installed according to the manufacturer's instructions and shall be properly and firmly secured in place to maintain correct alignment in normal use. 4. The burner or burners shall be so installed and adjusted that there will be no injurious flame impingement on walls or heating surfaces in a manner that will cause incomplete combustion or damage to boiler or furnace parts. 5. Means shall be provided to permit ready observation of the pilot, safety device and main burner while firing. (c) Manual Shutoff Valves. 1. Pilots shall be independently controlled by means of a manually operated pilot shutoff valve. In multiple installations, a manually operated pilot firing valve shall be provided for each pilot. 2. On burners with inputs exceeding five million (5,000,000) BTU per hour, each burner unit, except those utilizing a zero governor inspirator mixer, shall be equipped with a manual firing valve downstream of all other valves and as close as practicable to the burner so that the flame can be observed during manipulation of this valve. 3. On multiple burner installations, a manual shutoff valve shall be installed ahead of all other valves and controls for each burner. 4. A manually operated shutoff valve of an approved type shall be installed in the main line to each burner. It shall be readily accessible and shall clearly indicate the "ON" and "OFF" positions with stops at the open and closed positions. 5. On installations requiring inputs exceeding one million (1,000,000) BTU per hour, the main shutoff valve shall be of a pressure rating no less than the gas pressure in the street main. (d) Control Valves, Pressure Rating. 1. All safety and input control valves (automatic recycling or manual reset) shall be capable of withstanding the gas main pressure and shall be installed upstream of all other control valves. 2. The gas supply pressure to the pilot or group of pilots shall be controlled independently of the burner supply. (e) Combustion Control. Uptake dampers shall be counterbalanced to open in the event of breakage or failure of their operating means. Counter-balancing arms, weights, etc. shall be so located or shielded as to prevent personal injury to the operator or damage to equipment in case of breakage. 1. For automatically lighted burners, automatically operated dampers, where used, shall be interlocked to prevent lighting of the main burner unless sufficient draft is available. 2. All combustion control systems shall be so installed as to assure stable, safe and approved proper standards of combustion and efficiency with a minimum of seventy percent (70%) for the required range of operation. 3. When air louvers, dampers or other air controls are automatically operated, such operation shall be in conjunction with gas input control valves, either by mechanical linkage or changes in furnace pressure and/or change in fuel flow to maintain proper fuel/air ratio over the entire required range of operation. The operating medium may be electrical, pneumatic or hydraulic. Arrangements shall be provided for shutting off the fuel supply in the event of failure of the control medium. 4. An approved draft regulator having a minimum free area of three-fourths (¾) of the area of the boiler or furnace breeching outlet may be used in lieu of a draft hood. Where barometric dampers are used they shall furnish positive and effective protection against back drafts. Barometric dampers shall be installed in accordance with the manufacturer's instructions. (f) Limiting Devices. 1. Automatically operated gas burners in connection with vapor, hot water, steam or warm air heating systems shall be equipped with approved devices to shut down the burner in the event of undue pressure in a steam boiler or overheating within a hot water boiler or warm air furnace. Each steam boiler shall be equipped with a low water cutoff. 2. On all installations, where operation of the burner is controlled by an aquastat or furnace stat, another aquastat or furnace stat shall be installed in the one hundred ten (110) volt line ahead of all other controls, as a high limit or safety control. The high limit on hot water heating systems shall be of the immersion type installed in the boiler. On all installations, where the operation of the burner is controlled by a pressure stat, this control shall be installed in the one hundred ten (110) volt line ahead of all other controls. 3. Limiting devices shall not depend upon the closing of an electrical circuit to shut off the fuel supply. 4. All limiting devices shall shut off fuel to all main burners. 5. Shutoff valves shall not be installed in the piping between the boiler and pressure and/or water temperature limiting devices. (g) Flues and Flue Connections. The chimney or stack shall be preinspected and tested, if necessary, to determine whether or not it is in suitable condition. If not in suitable condition, as determined by the Building Inspection Division of the Department of Planning and Community and Economic Development, any defects shall be corrected subject to the approval of the Building Inspection Division of the Department of Planning and Community and Economic Development. (Am. by Ord. 8081, 7-29-83; ORD-08-00109, 10-7-08) (h) Combustion Chamber. Refractory combustion chambers to be used for inshot or horizontal type burners shall be constructed and sized to burner manufacturer's recommendations. (i) Installation Requirements for Dual Fuel Burning. 1. In addition to the requirements set forth in Sections 30.18, 30.19, and 30.20, inclusive, of this code, together with their subsections, gas burners installed in conjunction with other combustion equipment shall conform to the following requirements. 2. Gas burners shall be of the inshot type and shall be installed to fire directly into the combustion chamber. Angle or corner installations will not be permitted without special permission of the Building Inspection Division of the Department of Planning and Community and Economic Development. (Am. by Ord. 8081, 7-29-83) 3. The installer shall be responsible for the proper functioning of both the gas equipment and the existing combustion equipment. 4. Proper protection of the gas and other combustion equipment shall be provided from the effects of each other. Such protection to be approved by the Building Inspection Division of the Department of Planning and Community and Economic Development. (Am. by Ord. 8081, 7-29-83) 5. Controls may be common to both fuels or may be independent. Transfer from one fuel to the other shall be by a manual interlock system to prevent the gas and other fuel being used simultaneously. 6. Where it is necessary that both fuels are to be used simultaneously, special approval must be obtained from the Building Inspection Division of the Department of Planning and Community and Economic Development. (Am. by Ord. 8081, 7-29-83) 7. The installer shall file with the Building Inspection Division of the Department of Planning and Community and Economic Development, drawings showing electric wiring, gas piping of the gas burner and controls, method of mounting burner and operating instructions. (Am. by Ord. 8081, 7-29-83)

(Am. by ORD-08-00109, 10-7-08)