square feet with an overall length not to exceed 16 feet
Jackson Zoning Ordinance § 130
in effect10. In accordance with s 83-2, 83-3 and 83-5) of the Jackson MS Code of Ordinances,
portable storage containers may be utilized for a period not to exceed 30 days except
for purposes of reconstruction and/or remodeling of said residence. Any extension
of time must coincide with a valid building permit.
11. The monopole shall be located a minimum of one hundred sixty (160) feet from any
adjacent structure on all adjacent lots.
b) The WCF shall be in the rear of the lot and encompass a minimum area of two–
hundred fifty (250) square feet. The setback from the rear lot line shall be a
minimum of five (5) feet.
c) A Site Plan for the WCF must be submitted with the Use Permit application and
mailed with the Zoning Action Notification Form and shall include:
the legal description for the WCF site;
the building footprint of the structures located on the lot and the structures
located to the north, south, east and west of the proposed WCF site;
the Fall zone (The area in which a wireless support structure may be
expected to fall in the event of a structural failure, as measured by
engineering standards.); and
a rendering of the enclosure to include the landscaping
The WCF enclosures shall be a minimum height of six (6) ft. and
constructed of walls or fences of wood or plastic lumber, (finished)
masonry units, (finished) concrete, or any combination of these
elements. The materials used shall be compatible with those of
adjacent or surrounding buildings or structures and may be used in any
combination of the enclosure materials listed above. The enclosure
shall be constructed in such a manner that all structural members,
including braces, posts, poles and other projections, shall be on the
interior side. The enclosures shall be of a material and color the same
or similar to the existing principal structure
Existing on-site vegetation shall be preserved to the maximum extent
practicable and shall be supplemented as required.
d) The WCF Permit shall be renewed annually by the recipient company.
e) Upon the ceasing of operations, the WCF facility shall be removed within one-
hundred eighty (180) days and the property restored to its prior condition or
better.
Source: City of Jackson Zoning Ordinance (jacksonms.gov PDF)URL: https://jacksonms.gov/government/city-departments/planning-and-development/office-of-city-planning/zoning/zoning-ordinances-and-code/Fetched: 7/25/2026
