§ 50.09. - Electric service in industrial and commercial developments.
(a) All electric service within industrial and commercial developments of more than one lot or more than one building on a single lot shall be installed underground. The utility shall provide a single phase or three phase underground electric distribution system, at its discretion, to all new industrial and commercial developments. A street lighting system shall be installed by the utility for streets that are dedicated to the city. At the discretion of the utility, an overhead distribution system may be installed around the perimeter of the development when required. (b) The developer shall provide, free of charge, all necessary easements for all CWLP electrical and communication systems. If a customer denies the utility an easement required to provide service, then the customer shall become responsible for all additional costs incurred to provide service. (c) For single and three phase systems the utility shall install an underground distribution system to a primary service point on or adjacent to the developer's property. From this primary service point the developer shall pay the utility the estimated costs to provide and install primary conduits (excluding transformer primary conduits), manholes, street lighting, sectionalizing cabinet equipment pads and pad mount switchgear equipment pads within the commercial or industrial development. The developer shall be responsible to provide and install the transformer primary conduits and transformer equipment pads per CWLP specifications. After the installation to be performed by the developer is complete, the utility shall install all primary cables and transformers. The developer or individual customer is responsible for installing and maintaining the underground secondary electric service cable from the utility secondary service point, typically a distribution pedestal or transformer to the customer metering point.
(Ord. No. 543-10-00, § 1(Exh. A), 10-3-00; Ord. No. 226-7-12, Exh. A, 7-3-12)