§ 9-3-7 — Variances
Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 9-3-7
Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/4525a990-3be9-43b4-ba3a-239d355b1df2
9-3-7. - Variances.
(a) The city manager may grant a variance from the requirements of Subsection 9-3-2(i) and Sections 9-3-3, 9-3-4, and 9-3-5, B.R.C. 1981, except that no variance shall be granted for expansion or enlargement of any structure constructed after July 12, 1978, unless such expansion or enlargement conforms to the flood protection elevation requirement in effect at the time of the original construction. (b) The city manager shall not grant a variance under this section unless the manager determines that: (1) Considering the flood hazard, the variance is the minimum necessary to afford relief; (2) To do so would not result in additional threats to public safety, extraordinary public expense, nuisance, fraud, victimization of the public, or for variances in the conveyance zone a rise in the elevation of the water surface of a one hundred-year flood, or be in conflict with existing provisions of this code, any ordinance of the city, or any other applicable laws; and (3) Failure to grant the variance would result in exceptional hardship to the applicant, except that a hardship need not be shown for a variance sought to the requirements of Paragraph (i)(4) of Section 9-3-2, "Floodplains," B.R.C. 1981, for a public essential services facility in the five hundred-year floodplain if the applicant demonstrates to the satisfaction of the city manager that the facility is an element of a redundant system for which services will not be interrupted during a flood. At a minimum, the applicant shall demonstrate that one or more redundant facilities are available, either owned by the same public entity or available through an intergovernmental agreement or other contract, and are connected; that the alternative facilities are either located outside of the five hundred-year floodplain or are compliant with the requirements of this chapter; and that an operations plan is in effect that states how redundant systems will provide service to the affected area in the event of a flood. Evidence of ongoing redundancy shall be provided to the city manager by the owner or operator of the facility upon request by the city manager. (c) The manager shall examine the following factors in determining whether or not to grant a variance under this section: (1) The danger to life and property due to flooding or erosion damage; (2) The likelihood that the proposed development, in conjunction with existing and anticipated development, may increase flood hazards; (3) The relationship of the proposed development to the Boulder Valley Comprehensive Plan and any applicable floodplain management programs; and (4) The cost and ability of providing essential services, such as maintaining and protecting public utility systems, roads, and bridges, and of restoring normal operations for the community during and after floods. (d) The city manager shall not grant a cumulative total of variances that increases a structure's floor area by more than ten percent of the structure throughout the life of the structure. (e) An applicant for a variance shall apply on forms provided by the city manager and pay the fee prescribed by Section 4-20-44, "Floodplain Development Permits and Flood Control Variance Fees," B.R.C. 1981, unless a floodplain development permit is required as well, in which case no fee is required for the variance. (f) Any decision by the city manager to approve a variance may be appealed by any aggrieved party to the planning board as described by Section 9-4-4, "Appeals, Call-Ups, and Public Hearings," B.R.C. 1981. (g) When granting any variance that allows for construction below FEMA's one hundred-year flood protection elevation, the city manager shall provide to the recipient of the variance written notice that the proposed construction does not conform with FEMA guidelines and that the proposed construction and the original structure may be subject to increased flood insurance premiums. Ordinance Nos. 7926 (2013); 8622 (2024)
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.
