For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 170.11.06 — Fill material; excavations

Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 170.11.06

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/62dd9e78-1722-4d39-a14f-9d01c4892347

§ 170.11.06. - Fill material; excavations.

(a) Whenever an excavation below grade is backfilled, the following procedure shall be implemented prior to a cavity inspection: (1) Remove and cap all utilities and piping. (2) Remove foundation walls and any other portions of structures above ground to a minimum of two feet below the ground level. (3) Break up all concrete floor slabs occurring below grade into sections no larger than 16 square feet to allow proper drainage of water. (4) After approval of the cavity inspection by a city inspector, fill the excavation with suitable, clean, free of deleterious matter, dry compactable compatible material, such as clean sand, soil, or concrete by-product. There shall be no petroleum containing material or by-product, reinforcing steel, wood, paper or similar materials in this fill. The final grade of the excavation area shall match as closely as possible the existing grade surrounding the excavation area to ensure no ponding or drainage problems are created as a result of the backfill process.

(Ord. No. 826-12-06, § 1(Exh. A), 12-19-06; Ord. No. 409-11-13, § 1(Exh. A), 11-19-13)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.