33.440.345 Supplemental Application Requirements
In addition to the application requirements of Section 33.730.060, Application Requirements, the
information below is required for Greenway review applications.
A.
Supplemental site plans. One copy of each plan must be at a scale of at least one inch to
100 feet.
1.
An existing conditions site plan, showing the following:
a.
Topography shown by contour lines at two foot vertical contours in areas of
slope less than 10 percent and at five foot vertical contours in areas of slope ten
percent or greater;
b.
The top of bank and the setback area and the structures and topographic
contours referenced to determine the top of bank. The site plan depicting the
top of bank must be drawn accurately to scale, and be suitable for reproduction
on paper no smaller than 8.5 x 11 inches and no larger than 36 x 48 inches. The
scale of the drawing must be between 1 inch = 50 feet, and 1 inch = 10 feet.
Ground elevations must be shown by contour lines at 2-foot vertical intervals.
See the definition of top of bank in 33.910.030;
c.
Distribution outline of shrubs and ground covers with a list of most abundant
species;
d.
Trees identified by species, including the location of the drip line;
e.
Streams, wetlands, other water bodies, and drainage patterns, using arrows to
indicate the direction of major drainage flow;
f.
Existing improvements such as structures, buildings, utility lines, fences, paved
areas, roads, culverts, and bridges;
g.
Areas of known soil or groundwater contamination, areas of uncontained
hazardous materials, and underground storage tanks; and
h.
Stormwater management facilities.
2.
A development proposal site plan including:
a.
A grading plan showing proposed alteration of the ground at two foot vertical
contours in areas of slopes less than 10 percent and at five foot vertical contours
in areas of slopes ten percent or greater;
b.
Proposed improvements such as structures, buildings, utility lines, fences, paved
areas, roads, culverts, bridges; stormwater facilities; and
c.
Areas where existing topography and vegetation will be left undisturbed.
3.
A construction management site plan including:
a.
Areas that will be disturbed, including equipment maneuvering areas;
b.
Location of site access and egress;
c.
Equipment and material staging and stockpile areas;
d.
Erosion control measures; and
e.
Tree protection measures for trees to be preserved that meet the requirements
of Title 11, Chapter 11.60, Technical Specifications.
B.
River Quality overlay zone. The following information is required for Greenway review
applications for development, exterior alterations, excavations, and fills in the River Water
Quality overlay zone setback:
1.
A mitigation or remediation plan including:
a.
Detailed plans or drawings describing any proposed mitigation or remediation
activities;
b.
Distribution outline, species composition, and percent of ground covered with
ground cover plants, shrubs, and trees to be seeded or planted;
c.
Stormwater management features, including retention, infiltration, detention,
discharges, and outfalls;
d.
Water bodies to be created, including depth; and
e.
Planting specifications consistent with Section 33.248.090, Mitigation and
Restoration Plantings.
2.
Narrative. The following written narratives are required:
a.
Impact evaluation. An impact evaluation is required to determine compliance
with the approval criteria and to evaluate development alternatives for a
particular development. The alternatives must be evaluated on the basis of their
impact on the functional values of the water quality resource area. The impact
evaluation is based on the functional values identified in the Purpose Statement,
Section 33.440.010. An impact evaluation includes:
(1) Identification, by characteristics and quantity, of the functional values found
on the site;
(2) Evaluation of alternative locations including outside the River Water Quality
overlay zone setback, design modification, or alternative methods of
development to determine which options reduce the significant detrimental
impacts on the functional values of the site; and
(3) Determination of the alternative that best meets the applicable approval
criteria and identification of significant detrimental impacts that are
unavoidable.
b.
Construction management plan. Identify measures that will be taken during
construction or remediation to protect the remaining functional values at and
near the construction site and a description of how undisturbed areas will be
protected. For example, describe the timing of construction, how construction
equipment will be controlled, and describe how trees will be protected in
conformance with Chapter 11.60, Technical Specifications, and erosion
controlled in conformance with Title 10, Erosion and Sediment Control
Regulations.
c.
Mitigation or remediation plan. The purpose of a mitigation or remediation plan
is to counteract unavoidable significant detrimental impacts that result from the
chosen development alternative as identified in the impact evaluation. A
mitigation or remediation plan includes:
(1) A description and analysis of how significant detrimental impacts will be
avoided, minimized, or mitigated, as follows:
•
Significant detrimental impacts must be avoided where practicable;
•
Where avoiding significant detrimental impacts is not practicable, the
impact must be minimized, and the impacts mitigated. The mitigation
must meet the following:
−
The mitigation must be on the construction site, and must enhance
the same kind of resource.
−
If it is not practicable to mitigate impacts using the same kind of
resource, a different kind of resource may be used.
(2) Functional values to be restored, created, or enhanced on the mitigation or
remediation site;
(3) Documentation of coordination with appropriate local, regional, special
district, state, and federal regulatory agencies;
(4) Construction timetables;
(5) Operations and maintenance practices;
(6) Information showing compliance with Section 33.248.090, Mitigation and
Restoration Plantings.