For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19-12 — Reimbursements for part of water and sewer improvements

Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 19-12

Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/665cbc8f-6e90-4c1a-9c13-b818bfeaa7f7

Sec. 19-12. Reimbursements for part of water and sewer improvements.

a. Any subdivision or development on land existing in the City for a minimum of one (1) year in which the owner or developer is required to advance the cost of water or sewer improvements under Section 19-10 c. will be covered by contract. The contract will provide that the owner or developer shall deposit with City the cost of construction of said water or sewer improvements as determined by competitive bid or as estimated by the Director plus five percent (5%). The contract shall provide that City shall reimburse the developer for part of the money advanced (exclusive of lift station, force mains and water or sewer services) for eligible cost of water or sewer main extensions when service connections are made to the lines (during the period of five (5) years following the date of the contract). b. The developer is eligible for the maximum reimbursement when the number of connections made to the extended lines during the five-year period equals or exceeds the number of feet of constructed lines divided by one hundred (100). For example, if one thousand (1,000) feet of line were constructed in accordance with the refund contract, at least ten (10) lots must be connected in order to entitle the developer to a maximum refund. If there is less than one lot for each unit of one hundred (100) feet of line, then the total eligible refund shall be reduced proportionately. In the example above, if only nine (9) lots had been connected, the eligible reimbursement would be nine-tenths (9/10) of maximum. In calculating the number of lots connected to the extended lines, credit is given for lots connected to the extended lines which are owned by persons who are not parties to the reimbursement contract as well as those owned by the developer. c. The total amount advanced, the total length of line, and number and description of lots to be developed and the eligible refund per lot shall be made a part of the contract. City will, three (3) years from date of contract, determine the number of lots that have been developed through the first three (3) years of contract. This number multiplied by the amount to be reimbursed for each lot will determine the amount of the earned refund to be returned as a result of the first three (3) years development. d. City shall refund to the developer the fixed amount for each lot developed and connected to City water and sewer lines. The refund payments will become due and payable at the end of each year beginning three (3) years from date of contract. The payment will be over a period of five (5) years. The first payment will be for one-fifth (1/5) of the earned refund, and shall be due and payable three (3) years from date of contract. The second, third, fourth, and fifth payments shall become due four (4), five (5), six (6), and seven (7) years, respectively, from the date of contract. One-fifth (1/5) of the refund earned during the fourth and fifth years of the contract, shall become due at the end of the contract year in which it was developed, and at the end of each of the next four (4) years. e. The maximum eligible refund shall be twenty-five (25) percent of eligible costs. Eligible costs include all costs advanced by the developer of materials, labor and testing for extending water and sewer mains and do not include costs of service connections. f. The contract shall state that City shall not refund to the developer any part of the cost advanced for any lot(s) which have not been developed and connected to the water and sewer lines of the Utility on the last day of the fifth year from date of contract. (Ord. No. O-96-54, 6-26-96) (Ord. No. 0-99-80, 10/20/99) (Ord. No. 2009-7, 2/11/09)

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.