§ 44-183 — Installation guidelines and requirements for backflow prevention assemblies
Code of Ordinances, City of Round Rock, Texas (Supp. 27: codified through Ordinance of August 13, 2026 (online updated November 5, 2026)) · Round Rock Code of Ordinances § 44-183
Corpus is an independent public-information project, not the official City of Round Rock website. Stable reference: corpuslaw.us/code/69ba3281-f761-457e-9e48-249edf9e1027
Sec. 44-183. - Installation guidelines and requirements for backflow prevention assemblies.
(a) The following requirements shall apply to the installation of all assemblies: (1) Approved backflow prevention assemblies shall be installed in accordance with state law, commission rules, this article, and any other applicable law or regulation. The assembly installer must obtain the required plumbing permits and have the installation inspected by the director. (2) With respect to facilities where the director requires an assembly to be installed at the point of delivery of the water supply, the installation of the assembly must be made at a point prior to any branch in the line. Such installation must be made on private property within two feet of the water meter. If deemed necessary, the director may specify other areas for installation of the assembly. Assemblies that must be installed, or are located on, city rights-of-way are the responsibility of the business or entity that the water line is serving. (3) All assemblies must be protected from damage caused by freezing or other severe weather conditions. (4) All assemblies shall be of a type and model approved in writing by the director prior to installation. (5) All vertical installations of assemblies must have prior written approval by the director. (6) Approved backflow prevention assemblies that are larger than four inches and installed more than five feet above floor level must have a suitable platform for use by testing, inspection or maintenance personnel. (7) Bypass lines are prohibited. Pipe fittings which could be used for connecting a bypass line must not be installed on the premises. (8) Lines should be thoroughly flushed prior to installation of an assembly. A strainer with blowout tapping may be required ahead of the assembly. (9) All facilities that require continuous, uninterrupted water service and are required to have an assembly must make provisions for the parallel installation of assemblies of the same type so that testing, repair and maintenance can be performed without interrupting the water service to the premises. The assemblies should be sized in such a manner that either assembly, operating independently, will provide the maximum flow required. (10) The property owner assumes all responsibility for any damages resulting from installation of an assembly. (11) The water customer assumes all responsibility for any damages resulting from operation and/or maintenance of an assembly and shall be responsible for keeping all assembly vaults reasonably free of silt and debris. (12) Upon completion of installation, the director shall be notified by the property owner, and all assemblies must be inspected and tested. All assemblies must be approved in writing by and registered with the director, and the property owner shall provide to the director the date of installation, manufacturer, model, type, size and serial number of the assembly, and initial test report. (13) Requests for variances from the specifications and requirements of this article will be evaluated on a case-by-case basis. Any deviations from this article must have prior written approval of the director. (b) Upon written approval by the director, reduced pressure principle backflow prevention assemblies (RPs) may be utilized on-premises where a substance is handled that would be hazardous to health if introduced into the potable water system. The RP is normally used in locations where an air gap is impractical. The RP must be effective against both backsiphonage and backpressure. (1) RPs must be sized to provide an adequate supply of water and pressure for the premises being served. Flow characteristics are not standard. The manufacturer's specifications must be consulted for specific performance data. (2) Each RP assembly must be readily accessible for testing and maintenance and must be located in an area where water damage to building or furnishings would not occur in the event of a relief valve discharge. The property owner assumes all responsibility for any damage caused by water discharge from a RP assembly. (3) An approved air gap shall be located at the relief valve orifice of RP assemblies. This air gap shall be at least twice the inside diameter of the incoming supply line as measured vertically above the top rim of the drain and in no case less than one inch. An approved air gap funnel assembly may be used to direct minor discharges away from the assembly; however, this assembly may not be used to control flow in a continuous relief situation. Drain lines to accommodate full relief valve discharge flow should be installed. (4) No part of an RP assembly shall be submerged in water or installed in a location subject to flooding. RPs must be installed above grade in well-drained areas. (5) RP assembly enclosures shall be designed for ready access and sized to allow for the minimum clearances established below. Removable protective enclosures should be installed on smaller RP assemblies. Daylight drain ports must be provided to accommodate full pressure discharge from the RP assembly. (6) RP assemblies two inches and smaller shall have at least six inches of clearance on both sides and on top of the assembly, and 12 inches of clearance below and behind the assembly. All RP assemblies larger than two inches shall have a minimum of 12 inches of clearance on the back side, 24 inches of clearance on the test cock side. The relief valve opening shall be at least 12 inches (plus nominal size of assembly) above the floor or highest possible water level. Headroom of 60 inches is required in vaults without a fully removable top. A minimum access opening of 36 inches in diameter is required on all vault lids. (7) Vertical installation of RP assemblies is prohibited. (8) All RP assemblies must be tested in accordance with this article. The initial testing is the responsibility of the property owner. The property owner must notify the director upon the installation of any assembly. (c) Reduced pressure principle detector backflow prevention assemblies (RPDAs) may be utilized in all installations requiring a reduced pressure principle backflow prevention assembly and detector metering. (1) RPDAs shall comply with the installation requirements applicable for reduced pressure principle backflow assemblies (RPs). (2) Each line-size RP assembly and the bypass RP assembly must each be tested for proper functioning. A separate test report for each assembly must be completed by the licensed tester. (d) Double check valve backflow prevention assemblies (DCs) may be utilized on premises where a substance is handled that would be objectionable but not hazardous to health if introduced into the potable water system. (1) DCs must be sized to provide an adequate supply of water and pressure for the premises being served. The manufacturer's specifications must be consulted for specific performance data. (2) Premises where an uninterrupted water supply is critical must be provided with two DC assemblies installed in parallel. DC assemblies should be sized in such a manner that either assembly, operating independently, will provide the maximum flow required. (3) Each DC assembly shall be readily accessible with adequate room for testing and maintenance. DCs may be installed below grade, provided that all test cocks are fitted with brass pipe plugs. All vaults shall be well drained, constructed of suitable materials, and sized to allow for the minimum clearances established below. (4) DC assemblies two inches and smaller shall have at least six inches of clearance below and on both sides of the assembly, and if located in a vault, the bottom of the assembly shall be not more than 24 inches below grade. All DC assemblies larger than two inches shall have a minimum clearance of 12 inches on the back side, 24 inches of clearance on the test cock side, and 12 inches of clearance below the assembly. Headroom of 60 inches is required in vaults without a fully removable top. A minimum access opening of 36 inches in diameter is required on all vault lids. "Y" pattern DCs shall be installed so that the checks are horizontal and the test cocks face upward. These clearance standards apply to all DC assemblies installed in vaults, enclosures or meter boxes. (5) Vertical installations of DCs are allowed only on sizes up to and including four inches and which also meet the following requirements: a. Equipped with internally spring-loaded check valves; b. Flow is upward through assembly; c. Manufacturer states their assembly can be used in a vertical position; d. Approved by director. (6) All DCs must be tested in accordance with this article. The initial testing is the responsibility of the assembly and property owner. The property owner must notify the director upon the installation of any assembly. (e) Double check detector backflow prevention assemblies (DCDA) may be utilized in all installations requiring a DC and detector metering. (1) DCDAs shall comply with the installation requirements applicable for DCs. (2) Each line-size DC assembly and the bypass DC assembly must be tested for proper functioning. A separate test report for each assembly must be completed by the licensed tester. (f) Pressure vacuum breaker backflow prevention assemblies (PVBs) may be utilized at point-of-use protection only and where a substance is handled that would be objectionable but not hazardous to health if introduced into the potable water system. PVBs protect against backsiphonage only and shall not be installed where there is potential for backpressure contamination. (1) Each PVB assembly shall be installed a minimum of 12 inches above the highest downstream piping. (2) PVBs shall not be installed in any area subject to flooding or where damage may occur from water discharge. (3) Each PVB assembly shall be readily accessible for testing and maintenance, with a minimum clearance of 12 inches in all areas immediately adjacent to the assembly. (4) All PVBs must be tested in accordance with this article. The initial testing is the responsibility of the assembly and property owner. The property owner must notify the director upon the installation of any assembly. (g) Spill-resistant pressure vacuum breaker backflow prevention assemblies (SVBs) may be utilized in all installations requiring a pressure vacuum breaker. SVBs shall comply with the installation requirements applicable for pressure vacuum breaker backflow prevention assemblies (PVBs).
(Code 1995, § 10.711; Ord. No. O-2015-2423, § I, 5-14-2015; Ord. No. O-2016-3846, § I, 10-27-2016)
Ask a question about Round Rock law
Corpus searches the Round Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.
