For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23.04.217 — Meter boxes and valve boxes

Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 23.04.217

Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/874ce34d-1c27-4caa-8ac8-5a2c77af439e

23.04.217 - Meter boxes and valve boxes.

All meter boxes and valve boxes shall be constructed as shown on the drawings furnished by the Water Commissioner. Meter couplings or flanges shall be furnished by the Water Commissioner on all meter installations, up to two (2) inch, at no cost. Connections over two (2) inch shall have flanged connections as called for by ANSI A21.10-77 and AWWA C110-77. No water shall be turned on to any connection until the Water Commissioner has inspected and approved the installation. The Water Commissioner will install all meters after approval of installation. The Water Commissioner will furnish all valve box and meter box frame and covers at no cost exclusive of those for automatic sprinkler or combined fire meter use.

(1948 C., Ch. 55, § 55; 1960 C., § 547.220(part)); 1994 C., § 23.04.217; Ord. No. 57997, § 1(part), 1980.)

Ask a question about St. Louis law

Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.