Erosion and sediment control.
Southaven Code of Ordinances § 12-109
in effectSec. 12-109. - Erosion and sediment control.
Installation of the improvements required by this chapter shall be done in such a manner as to provide for the most effective control of erosion and sediment. The construction plan shall be accompanied by an erosion and sediment control plan (which shall be submitted to the Desoto County soil and water conservation district for review and recommendations). Practical combination of the following technical principles shall be used:
(1) The smallest practical area of land shall be exposed at any one (1) time during development.
(2) When land is exposed during development, the exposure shall be kept to the shortest practical period of time.
(3) Temporary vegetation or mulching shall be used to protect critical areas exposed during development.
(4) Sediment basins (debris basins, desilting basins or silt traps) shall be installed and maintained to remove sediment from runoff waters of land undergoing development.
(5) Provisions shall be made to effectively accommodate the runoff caused by changed soil conditions during and after development.
(6) Permanent final vegetation and structures shall be installed as soon as practical in the development.
(7) The development plan shall be fitted to the topography and soils so as to create the least possible erosion.
(8) Whenever feasible, natural vegetation shall be retained and protected.
(Ord. No. 29, art. VI(E)(9), 4-5-83)
Source: City of Southaven, Mississippi, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/ms/southaven/codes/code_of_ordinances?nodeId=CO_TITXIISURE_CH4REMIIM_S12-109ERSECOFetched: 11/1/2026
