Care of area during construction.
Southaven Code of Ordinances § 12-108
in effectSec. 12-108. - Care of area during construction.
(a) Builders and contractors shall be responsible for cleaning up all loose paper and material subject to be scattered by the wind each day and prevent such material from scattering through a subdivision or to adjoining property. The premises will be kept in a reasonable, clear, unlittered manner. Building permits may be withheld from builders and contractors who fail to maintain premises free of litter and loose paper after being warned by the building department.
(b) Builders and contractors shall not permit waste materials, dirt and debris to be placed or allowed to remain in a public street or road. Surplus dirt shall not be graded or pushed into a street. If a builder or contractor shall not immediately remove such material placed by him or his subcontractors in a street after being warned, no building permit shall be issued to him for a period of six (6) months thereafter, and the violator may be prosecuted for unlawfully placing an obstruction in a public road. At the discretion of the building official, he may cause such material to be removed and the contractor shall be required to pay the cost of such removal.
(Ord. No. 29, art. VI(E)(8), 4-5-83)
Source: City of Southaven, Mississippi, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/ms/southaven/codes/code_of_ordinances?nodeId=CO_TITXIISURE_CH4REMIIM_S12-108CAARDUCOFetched: 11/1/2026
