Sec. 12-101. - Street improvements.
All existing and new roads, regardless of lot size, must comply with these regulations before dedication is accepted and before the roads will be maintained by the city:
(1) Width and depth of compacted gravel:
a. Residential subdivisions shall have minimum of eight (8) inches of compacted gravel or if measured before compaction, twelve (12) inches of load measurement.
b. Commercial and industrial subdivisions shall a minimum of eight (8) inches of compacted gravel over the entire width of the proposed gravel area or shall use a black base treatment in accordance with Mississippi State Aid Road Specifications.
c. Width of compacted gravel:
1. Fifty (50) feet right-of-way roads shall have thirty (30) feet of compacted gravel.
2. Sixty (60) feet right-of-way roads shall have forty (40) feet of compacted gravel.
3. All sixty-eight (68) and eighty (80) feet right-of-way roads shall have forty-eight (48) feet of compacted gravel.
4. Where needed as an urban arterial road, the gravel thickness and width may be increased by the city engineer.
(2) Width of pavement:
a. Fifty (50) feet right-of-way roads shall have thirty (30) feet of pavement, unless specifically waived or altered by the governing body. Forty (40) feet right-of-way roads shall have twenty-six (26) feet of pavement.
b. All other roads shall have pavement widths as specified in the cross-sections shown in Figure 1 at the end of this section.
(3) a.
All new roads must be paved by the developer before being accepted by the governing authority for maintenance. Upon completion of the gravel base and/or soil cement installation process, an inspection will be made and, if approved, a two-stage asphalt pavement will be installed. The first stage will be a one-and-one-half inch asphalt course or a chip seal application approved by the city engineer. The developer will maintain the streets and post a maintenance bond for one (1) year prior to the second stage of asphalt. The city has the option to accept cash payment in lieu of the second stage of asphalt should all the lots in the subdivision not be built upon prior to the one-year bond expiration date. A minimum total of two and one-half (2½) inches of plant-mix surface using the latest Mississippi State Highway Specifications will be required on all new roads in subdivisions or chip seal plus one and one-half (1½) inches of plant mix. Commercial and industrial subdivisions shall require three (3) inches of plant-mix surface.
b. When combustibles are brought on site in such quantities as deemed hazardous by the fire official, the developer must have and maintain a compacted all-weather surface, road(s) not less than twenty (20) feet wide capable of supporting the imposed loads of fire apparatus. A forty-five-foot turning radius and a vertical clearance of thirteen and one-half (13½) feet shall also be provided. For the purpose of this section an "all weather roadway" is described as a roadway constructed of approval base materials and graded to provide traction and a stable driving surface during all weather conditions (rain, sleet, snow, freeze-thaw cycles and drought). The roadway must be compacted and able to support a five-thousand-pound vehicle load without noticeable rutting. Positive drainage must be provided from the roadway during all phases of construction.
c. All streets and lots under construction shall be marked with signs or markers legible to emergency responders. Temporary signs and markers may be used until replaced by permanent signs. A suitable supply of water, adequate for fire suppression operations, acceptable by the fire department shall be supplied and maintained. All water mains and fire hydrants shall be installed and tested to city standards and shall be fully operational prior to building permits being issued.
d. If upon inspection it is determined that any provisions contained in this section are not being complied with, the building official is empowered to issue stop work orders on construction within the development or any portion thereof until such time as the conditions are corrected. In addition, fourteen (14) calendar days after stop work orders have been issued by the building official the fire official may issue a summons to the developer or his/her agent acting in behalf of the developer with each day and each condition(s) maintained contrary to the requirements of this section being deemed a separate offense and any person, firm, corporation or agent upon conviction shall be guilty of a misdemeanor and shall be punished within the limits of a fine of not less than five hundred dollars ($500.00) nor more than one thousand dollars ($1,000.00) for each offense.
e. The developer when requested by the city shall provide an engineer's letter of certification stating workmanship and material in a specific development complies with the requirements of this section and meets all city specifications. The letter may be considered ample evidence of compliance with the provisions of this section.
f. Occupancy permits for buildings shall not be issued prior to the initial stage of asphalt surface or cup seal application approved by the city engineer.
(4) All bridges shall be constructed according to the Mississippi Standard Specifications for State Aid Road and Bridge Construction in effect at the time the subdivision is approved.
(5) The subdivider shall dedicate and construct all local and collector streets for full width of right-of-way as defined in subsection 12-71(e). Where the developer is developing a subdivision that runs to the center of an urban arterial street, he will be required to dedicate and develop only one-half of such road. However, in no case shall less than twenty (20) feet of wearing surface be required when one-half of the right-of-way is dedicated.
(6) Curb and gutter will be installed in all residential, commercial, and industrial zoned subdivisions using the Mississippi State Highway specifications. 6-24 type curb and gutter shall be utilized unless otherwise specified in accordance with city engineer recommendation. The developer shall have material and compression tests of the concrete performed and the results submitted to the engineer.
(7) The developer's engineer must notify the engineer in writing when the subgrade is ready for gravel, stating all culverts, subgrade width, and firmness of subgrade are up to approved engineering standards, before gravel is placed on the road. The owner shall notify the engineer when he plans to place gravel on the road. The engineer may have a representative present if load measurement is to be used. After the gravel is placed, the engineer will again certify that the gravel is of proper material thickness and width. When the road is to be paved, the engineer again will certify as to road bed being in proper condition for surfacing and that the materials used meet standards. The engineer or his representative will inspect the road one (1) time after being notified at completion of each phase of this work at no cost to the owner. If another trip is made, there will be a per-hour charge for time involved on all other trips.
(8) If these standards are not carried out, the city will not accept the roads for maintenance.
(9) The developer shall construct barricades at the end of all dead-end streets. Such barricades shall be painted with a reflective paint.
FIGURE 1
[image omitted; see the official code]
(Ord. No. 29, art. VI(E)(1), 4-5-83: Ord. No. 5-2-95; Ord. of. 12-8-95(2), § X; Ord. of 8-6-96)