Sec. 19-11. City participation in certain projects.

a. It is the policy of the City to plan water and sewer extensions for efficient future use. In some cases the most efficient way to provide service to an area involves the use of oversized lines or sewage lift stations. If a development is proposed in a location in which the master plan for utilities provides that oversized lines or sewage lift stations should be used, the Director may require installation of such lines or lift stations. When oversized lines are required, the developer shall pay the costs of providing service to the development and, subject to availability of funds, the City will pay the cost of increasing the line size to the size required. In the case of lift stations, the City may also pay the cost of capacity in excess of that required to serve the development, subject to the availability of funds. b. The construction of sanitary sewage lift stations and pressure lines will generally not be permitted unless it is impossible to connect to a gravity system. If a lift station and pressure line is required, complete design, including site work, all weather access, etc., shall be included in the plans and specifications. Lift stations shall be designed in accordance with current state and federal requirements and shall have either dual electrical power supply or stand-by generator. The minimum lift station capacity shall be one hundred (100) gallons per minute and shall have at least two (2) pumps, each of which shall be capable of pumping the design capacity of the lift station. The minimum pressure line size is four (4) inch diameter. The cost of lift station, force main and appurtenances shall be borne by the developer. The only portion of lift station, force mains and appurtenances eligible for refund by the City are associated oversizing costs approved by the Director. c. When the development is to be served by an existing lift station in which the City has contributed the cost to provide excess capacity, the developer shall pay a pro rata cost of that station. The pro rata cost of the station includes land, pumps, motors, building or structure, force main, engineering, inspection, and any other applicable costs. This cost shall be divided by the number of gross acres served to arrive at a cost per acre. The developer shall pay this charge based on the number of gross acres in the subdivision served by that lift station. d. Any agreement on behalf of the City to pay part of the cost of oversized lines or lift stations shall: 1. be in writing; 2. incorporate the policies of this section; 3. be approved by the Director; and 4. be subject to the availability of funds. (Ord. No. O-96-54, 6-26-96) (Ord. No. 0-99-80, 10/20/99) (Ord. No. 2009-7, 2/11/09)

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.