Tyler City Code § 19-10 Regulations for extension of water and sewer mains inside City limits.
Sec. 19-10. Regulations for extension of water and sewer mains inside City limits.
a. The City will, at its expense, construct or extend water or sewer mains to serve individual residential lots which are developed in the City when such construction or extension will require one hundred (100) feet or less of water or sewer line.
b. The City will, at its expense, construct or extend water or sewer mains to serve a group of individually owned residential lots which have been developed at least one year or more in the City, when such construction or extension will require an average of one hundred (100) feet or less of water or sewer lines for each connection.
c. The developer of a platted subdivision shall advance the cost of construction or extension under the following terms:
1. The developer shall present to the Director a minimum of six (6) complete sets of detailed water and sanitary sewer construction plans, specifications, and contract documents; prepared, signed and sealed by a registered professional engineer. The subdivision and platting of the property to be served must be in full compliance with City ordinances governing and regulating the platting, subdivision and development of land (City Code Chapter 10). The developer shall provide a one-inch water and a four-inch sewer service connection to each platted lot. Such service connections shall be shown on the plans for water and sewer service of the subdivision and such connections shall be installed at the time that water and sewer service is extended to the subdivision. The plans, specifications and contract documents shall comply with the City design guidelines for water and sewer lines and City specifications.
2. The Director shall verify plat approval by the Planning and Zoning Commission and shall verify that said plat has been recorded in the Plat Records of Smith County, Texas. (Ord. 0-2003-38, 7/23/03)
3. Plans and specifications shall be presented to the Director for final approval and authorization to advertise for bids in accordance with State law.
4. Upon receipt of an approved set of construction plans, specifications and contract documents, the Director shall set a date for receiving construction bids from qualified contractors in accordance with state laws and the City purchasing procedure. The cost to the developer shall be the total amount bid by the lowest qualified bidder plus a five percent (5%) contingency.
5. Bids shall be referred to the Director for tabulation and award.
6. Bid tabulation of the successful bidder shall be presented to the owner or developer, who shall advance the total construction cost to the City.
7. The Director shall certify to the City Manager that the funds necessary to construct the water and sewer connections were received from the developer and were properly deposited prior to the execution of the construction contract.
d. The City Manager or his designee is hereby authorized to employ the procedures to be described herein when deemed necessary to the efficient operation of the City and in the best interest and welfare of the public. (Ord. No. O-96-54, 6-26-96) (Ord. No. 0-99-80, 10/20/99) (Ord. No. 2009-7, 2/11/09)