25.09.080 - Landslide-prone areas

A. This Section 25.09.080 applies to all parcels in or containing a landslide-prone area. B. Site 1. Complete stabilization of all portions of a site that are disturbed or affected by the proposed development, including all developmental coverage and construction activity areas, is required. Complete stabilization of all portions of a site refers to the process and actions necessary to stabilize proposed site improvements, as well as all on-site areas and adjacent properties, including adjacent public and private rights-of-way, that are disturbed or affected. 2. The proposed development shall be limited and controlled to avoid adverse impacts to the landslide-prone area, prevent potential harm, and provide safe and stable development appropriate to site conditions. The Director may require other reasonable and appropriate solutions to provide site stability, including imposing conditions on the type and method of construction that reflect the specific constraints of the site. 3. Removal of, clearing of, or any action detrimental to trees or vegetation in landslide-prone areas is prohibited, except as necessary to provide complete stabilization or achieve the purposes of subsection 25.09.080.B. or as allowed under Section 25.09.070. C. Third-party review. In addition to the information provided pursuant to Section 25.09.330 and to Director's Rules, the Director may require third-party review if the professional opinions of the applicant's representative and the Department's reviewers cannot be reconciled. Third-party review requires the applicant's geotechnical and/or additional technical studies to be reviewed by an independent third party, selected by the Director and paid for by the applicant. The third-party review shall be conducted by a qualified engineering consultant. D. Bonds and insurance. The Director may require adequate bonds and/or insurance to cover potential claims for property damage that may arise from or be related to excavation or fill within a landslide-prone area if the depth of the proposed excavation exceeds 4 feet and the bottom of the proposed excavation is below the 100 percent slope line 45 degrees from a horizontal line from the property line. The Director may require such bonds and insurance in other circumstances where the Director determines that there is a potential for significant harm to an environmentally critical area or buffer during the construction process. E. Permit renewals. In addition to complying with the permit renewal standards in Chapter 23.76, applications for permit renewal shall comply with the following standards: 1. The Director may renew a permit for development that is in conformance with applicable regulations in effect at the time the renewal is sought. 2. An applicant seeking to renew a permit for new development in a landslide-prone area must submit a letter of certification from the current project geotechnical engineer of record as described in subsection 25.09.080.G.2. If the applicant does not submit a letter of certification, the permit shall not be renewed. 3. The Director may renew a permit for development in a landslide-prone area if, after considering the information submitted in conformance with subsection 25.09.080.G, the Director determines that there is no increased risk of damage to the proposed development, to neighboring properties, or to the drainage basin. The Director may impose new conditions or require the submittal of revised plans as part of the determination. 4. An applicant for renewal must demonstrate that any required bond or insurance will be in effect during the renewal period and that the amount of the bond or insurance still is appropriate. The Director may require a bond or insurance as a condition of renewal even if a bond or insurance was not required previously. F. Issued permits in landslide-prone areas. If the Director has reasonable grounds to believe that an emergency exists because significant changes in conditions at a project site or in the surrounding area may have occurred since a permit was issued, increasing the risk of damage to the proposed development, to neighboring properties, or to the drainage basin, the Director may suspend the permit by letter or other reasonable means of notification until the applicant has submitted a letter of certification as described in subsection 25.09.080.G.2 and satisfied the standards of subsection 25.09.080.G.2. G. Letter of certification 1. The Director may require a letter of certification based on such factors as the presence of known slides, indications of changed conditions at the site or in the surrounding area, or other indications of unstable soils. 2. The letter of certification shall be from the current project geotechnical engineer of record stating that a geotechnical engineer has inspected the site and area surrounding the proposed development within the 60 days preceding submittal of the letter. The letter of certification shall state that: a. In the project geotechnical engineer's professional opinion no significant changes in conditions at the site or surrounding area have occurred that render invalid or out-of-date the analysis and recommendations contained in the technical reports and other application materials previously submitted to the Department as part of the application for the permit; or that b. In the project geotechnical engineer's professional opinion changes in conditions at the site or surrounding area have occurred that require revision to project criteria, and that in the project geotechnical engineer's professional opinion all technical reports and any necessary revised drawings that account for the changed conditions have been prepared and submitted.

(Ord. 125292, § 1, 2017; Ord. 125248, § 15, 2017; Ord. 122050, § 1, 2006; Ord. 118672, § 36, 1997; Ord. 116976, § 4, 1993; Ord. 116253, § 1(part), 1992)