§ 50.08. - Electric service in multi-family developments.

(a) Individual residential duplex dwellings will be provided electric service according to the terms and conditions of permanent residential service. Individual multi-family dwellings of more than two units will be provided electric service according to the terms and conditions of general service facilities. This section shall apply to multi-family developments of more than one building on any given lot. (b) All electric facilities within multi-family developments such as apartments or condominium complexes consisting of two or more buildings must be installed underground. The utility shall provide a single phase or three phase underground electric distribution system to all new multi-family developments. A street lighting system shall be installed by the utility for multi-family development streets that are dedicated to the city. At the discretion of the utility, an overhead distribution system may be installed around the perimeter of the development where required. (c) The developer shall provide, free of charge, all necessary easements for all CWLP electrical and communication systems. If a customer denies the utility an easement required to provide service, then the customer shall become responsible for all additional costs incurred to provide service. (d) For single phase systems, the utility shall install an electric distribution system to provide service to each building including all required transformers, distribution pedestals, manholes, sectionalizing cabinets, equipment pads, primary conduits and primary cable. The utility shall install secondary service cables and conduits only from the utility transformers to distribution pedestals. The developer or individual customer is responsible for installing and maintaining the underground electric service cable from the utility service point, typically a distribution pedestal or transformer, to the customer metering point. (e) For single phase systems, payment shall be made prior to construction of the electric system. Construction shall begin within a reasonable amount of time after payment. In the event there are changes in the construction plans, any resulting increased costs shall be paid for by the developer, and any decrease in costs shall be reimbursed by CWLP. All payments shall be at the applicable rate at the time payment is made. In the event that construction is delayed by the developer for a period of six months or longer from the time of initial payment, the cost shall be adjusted to the then current rate. CWLP shall not begin installation of electric distribution until payment is received in full. Payment shall be per the following schedule: Excluding street lighting: 3 to 4 units per building: $1,400 per building 5 to 8 units per building: $2,200 per building 8 to 12 units per building: $3,000 per building More than 12 units per building: $3,800 per building Including street lighting: 3 to 4 units per building: $2,500 per building 5 to 8 units per building: $3,300 per building 8 to 12 units per building: $4,100 per building More than 12 units per building: $4,900 per building The initial costs per building listed above shall be adjusted annually on each May 15 beginning with May 15, 2013, by the same percentage change as the annual value for the previous calendar year of the United States Department of Labor, Bureau of Labor Statistics (BLS), Consumer Price Index, Midwest Region All Items, Size Class B/C (Series ID CUURX200SA0). In the event this number, Series ID CUURX200SA0, is no longer provided by the BLS, CWLP shall utilize the nearest equivalent replacement available provided by the BLS. The current rates shall be available from the CWLP electric engineering department. (f) For three phase systems, the utility shall install an underground distribution system to a primary service point on or adjacent to the developer's property. From this primary service point the developer shall pay the utility the estimated costs to provide and install primary conduits (excluding transformer primary conduits), manholes, street lighting, sectionalizing cabinet equipment pads and pad mount switchgear equipment pads within the multi-family development. The developer shall be responsible to provide and install the transformer primary conduits and transformer equipment pads per CWLP specifications. After the installation to be performed by the developer is complete, the utility shall install all primary cables and transformers. The developer or individual customer is responsible for installing and maintaining the underground secondary electric service cable from the utility secondary service point, typically a distribution pedestal or transformer, to the customer metering point. (g) If site plans for buildings are not finalized with sufficient certainty, the utility may elect to install a single phase underground distribution system to a primary service point on or adjacent to the developer's property. From this primary service point the developer shall pay the utility the estimated costs to provide and install primary conduits (excluding transformer primary conduits), manholes, street lighting, sectionalizing cabinet equipment pads and pad mount switchgear equipment pads within the multi-family development. The developer shall be responsible to provide and install the transformer primary conduits and transformer equipment pads per CWLP specification. After the installation to be performed by the developer is complete, the utility shall install all primary cables and transformers. The developer or individual customer is responsible for installing and maintaining the underground secondary electric service cable from the utility secondary service point, typically a distribution pedestal or transformer, to the customer metering point.

(Ord. No. 543-10-00, § 1(Exh. A), 10-3-00; Ord. No. 226-7-12, Exh. A, 7-3-12)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.