§ 50.07. - Electric service in mobile home parks.
(a) The utility shall install a single phase underground distribution system in all new mobile home parks. At the discretion of the utility, an overhead distribution system may be installed around the perimeter of the mobile home park where required. (b) The developer must provide, free of charge, all necessary easements for all CWLP electrical and communication systems. If a customer denies the utility an easement required to provide service, then the customer shall become responsible for all additional costs incurred to provide service. The developer shall pay a non-refundable sum of $650 per unit excluding street lighting or $950 per unit including street lighting for roads dedicated to the city. These sums are estimated per unit costs of developing an electric system as of the date of adoption of these regulations. Payment shall be made prior to construction of the electric system. Construction shall begin within a reasonable amount of time after payment. In the event there are changes in the construction plans, any resulting increased costs shall be paid for by the developer, and any decrease in costs shall be reimbursed by CWLP. All payments shall be at the applicable rate at the time payment is made. In the event that construction is delayed by the developer for a period of six months or longer from the time of initial payment, the cost shall be adjusted to the then current rate. CWLP shall not begin installation of electric distribution until payment is received in full. The per unit fee shall be adjusted in accordance with section 50.07(c). (c) The initial per unit cost listed above shall be adjusted annually on each May 15 beginning with May 15, 2013, by the same percentage change as the annual value for the previous calendar year of the United States Department of Labor, Bureau of Labor Statistics (the "BLS"), Consumer Price Index, Midwest Region All Items, Size Class B/C (Series ID CUURX200SA0). In the event this number, (Series ID CUURX200SA0), is no longer provided by the BLS, CWLP shall utilize the nearest equivalent replacement available provided by the BLS. The current rates shall be available from the CWLP electric engineering department. (d) The mobile home park developer or owner shall be responsible for providing, installing and maintaining the service pedestal for each individual unit and the underground electric service cable from the utility service point, typically a distribution pedestal or transformer, to the customer metering point. (e) Three phase electric facilities will be installed in new mobile home parks only at the utility's discretion. The developer may contact CWLP's electric engineering department to discuss the possibility and additional costs of three phase installation.
(Ord. No. 543-10-00, § 1(Exh. A), 10-3-00; Ord. No. 226-7-12, Exh. A, 7-3-12)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.