Sec. 5.7. - Landscape standards.
5.7.1. The purpose of these standards are to:
a. Provide landscaping requirements to protect the public from the effects of erosion, flooding and obstruction of vehicular and pedestrian traffic;
b. Aid in stabilizing the environment's ecological balance by contributing to the processes of energy and soil conservation, air purification, oxygen regeneration, waster water neutralization, ground water discharge, and stormwater runoff retardation, while aiding in noise, glare and heat abatement by preserving the existing tree canopy;
c. Ensure that the local stock of native trees and vegetation is maintained and replenished as necessary; and
d. provide visual buffering and to enhance the beautification of the city.
5.7.1.1. Parking lots shall be landscaped as required in the standards of section 5.3.
5.7.1.2. Stormwater management facility areas are to be landscaped as required in section 5.7.8.
5.7.1.3. For new developments and parking lots, a common development which includes more than one lot shall be treated as one lot for the purposes of satisfying these landscape regulations. Split ownership, planning in phases, construction in stages, and/or multiple building permits for a project shall not prevent it from being a common development as referred to in the definitions.
5.7.2. Landscape plan required. A landscape plan is required at time of site plan review for all site plans, subdivisions, and master planned developments. The landscape plan shall be prepared by a qualified professional landscape architect or landscape designer, or certified arborist and shall contain the information specified in the Section A-6 of the Appendix.
5.7.2.1. Parking lots shall be landscaped as required in the standards of Section 5.3.
5.7.2.2. Stormwater management facility areas are to be landscaped as required in Section 5.7.9.
5.7.2.3. For new developments and parking lots, a common development which includes more than one lot shall be treated as one lot for the purposes of satisfying these landscape regulations. Split ownership, planning in phases, construction in stages, and/or multiple building permits for a project shall not prevent it from being a common development as referred to in the definitions.
5.7.2.4. The building permit department may allow a temporary certificate of occupancy valid for a period of 30 days with extensions not to exceed an accumulation of 180 days if all of the following conditions exist:
a. Except for the completion of landscaping installation, occupancy would normally be allowed.
b. Completion of the required landscaping before a permanent certificate of occupancy is issued would result in hardship to the applicant as applied to this case, if so determined by the director of planning.
c. At the time the conditional temporary certificate of occupancy is requested, the developer/owner shall make financial arrangements (by certificate of deposit, or letter of credit) satisfactory to the city in the amount of $3.00 per square foot of required landscaping not yet in place to ensure that it shall be installed.
d. Any owner/developer wishing to make such financial arrangements must also grant the city access to the land to install or complete the required landscaping in the event the landscaping installation has not been completed at the end of the required extension period. Such financial arrangements shall be released when the required landscaping is completed.
5.7.3. Compliance with approved landscaping plan.
5.7.3.1. No building permit shall be issued unless the submitted landscape plan complies with the provisions of this ordinance. Standards for installation and maintenance of landscaping are located in the Appendix.
5.7.3.2. A certificate of occupancy shall not be permitted until required landscaping is complete and/or provision has been made to provide financial surety for completion of the required landscaping.
5.7.3.3. Phased development projects must have all required mitigation (See Article 6 - Tree Protection) completed in the phase that has been approved before the issuance of a certificate of occupancy.
5.7.3.4. The building permit department may allow a temporary certificate of occupancy valid for a period of 30 days with extensions not to exceed an accumulation of 180 days if all of the following conditions exist:
a. Except for the completion of landscaping installation, occupancy would normally be allowed.
b. Completion of the required landscaping before a permanent certificate of occupancy is issued would result in hardship to the applicant as applied to this case, if so determined by the Director of Planning.
c. At the time the conditional temporary certificate of occupancy is requested, the developer/owner shall make financial arrangements (by certificate of deposit, or letter of credit) satisfactory to the city in the amount of $3.00 per square foot of required landscaping not yet in place to ensure that it shall be installed.
d. Any owner/developer wishing to make such financial arrangements must also grant the city access to the land to install or complete the required landscaping in the event the landscaping installation has not been completed at the end of the required extension period. Such financial arrangements shall be released when the required landscaping is completed.
5.7.3.5. Permeable pavers may replace up to 25 percent of the landscaping requirement for the pervious surface of the lot, approvable at the discretion of the planning director.
5.7.3.6. If landscape mulch made of organic materials (such as wood) is to be used, it must be placed at least two feet from the edge of a building. Landscape rock or other similar material may be placed next to the building.
5.7.3.7. Frontage trees must be planted along all public streets at the rate of one large tree every 50 feet, or one small tree every 35 feet.
5.7.3.8. A foundation planting plan must be included in the landscaping plan for any development proposal.
5.7.4. Site landscaping requirements.
5.7.4.1. A minimum of 15% of the pervious surface of the lot shall be landscaped with trees and shrubs.
5.7.4.2. Additional landscaped area may be in the form of green areas, foundation plantings around buildings and structures, or additional front setback landscaping.
5.7.4.3. Any adjacent public right-of-way if planted and maintained by the developer shall be included as a credit toward required landscaped area. Plantings in a public right-of-way must be carefully considered due to potential for conflicts with underground utilities and will require approval of the City Engineer. Trees planted in a public right-of-way with underground utilities must be from the list of approved trees for planting within a right-of-way, maintained by the Public Works Department.
5.7.4.4. At a minimum, all additional landscaped areas shall be completely covered with live turf or ground cover, or seasonal seeding.
5.7.4.5. Permeable pavers may replace up to 25% of the landscaping requirement for the pervious surface of the lot, approvable at the discretion of the Planning Director.
5.7.4.6. If landscape mulch made of organic materials (such as wood) is to be used, it must be placed at least two (2) feet from the edge of a building. Landscape rock or other similar material may be placed next to the building.
5.7.4.7. Frontage trees must be planted along all public streets at the rate of 1 large tree every 50 feet, or 1 small tree every 35 feet.
5.7.4.8. A foundation planting plan must be included in the landscaping plan for any development proposal.
5.7.5. Credit for existing material.
5.7.5.1. Landscape areas shall incorporate existing natural vegetation to the extent feasible. If the natural vegetation is inadequate to meet the required landscaping standards, additional plant material shall be required.
5.7.5.2. Existing native habitat or vegetation located within planting areas that are preserved and meeting the requirements of this section may be counted toward the requirements.
5.7.5.3. Credit toward landscaping requirements may be granted at the discretion of the Planning Director
5.7.5.4. No landscaping shall be placed in an area of right-of-way where a capital improvement project has been funded for such location, unless and until such project has been completed.
5.7.5.5. No landscaping or other structure shall be placed within the sight triangle of an intersection.
5.7.6. Landscaping in Right of way. See requirements in Article VI. Trees, Section. 98-140.
5.7.7. Edges and buffers.
5.7.7.1. Edges. A landscaped edge shall be provided along the perimeter of all lots that are adjacent to streets and entrances.
a. The street perimeter landscaped edge shall be a minimum width of eight feet.
b. Within the street perimeter landscaped edge, ornamental grasses, mulch, landscape rock, or similar material shall be maintained within a minimum width of five feet from signs and five feet from ingress/egress curb cuts.
c. One tree must be planted in the street perimeter landscape edge for each 40 linear feet of landscaped edge, at a minimum 3-inch caliper. The number of required trees shall be calculated solely on the linear frontage of the required landscaped edge, and rounded to the nearest whole number. Trees may be grouped together or evenly spaced.
5.7.7.2. Buffers. An area with sufficient planting and/or structural screening (as defined in Article 10) shall be provided between certain uses and districts as noted below.
a. A 50 foot buffer (to include the applicable setback requirement) is required between industrial or manufacturing uses, or any commercial use on a site of more than one acre; that adjoins any property zoned primarily for residential uses; and between any development and any walking/biking trail, or any blue line stream (as designated by the U.S.G.S.); unless a permit for modifying, filling, piping, for re-routing has been obtained from FEMA and the Corp of Engineers. The buffer must include landscaping and/or fences, so that there will be an unbroken screen to limit visibility between the zones.
b. A 15-foot to 25-foot buffer (to include the applicable setback requirement) is required between commercial uses properties on sites of less than one acre and any property zoned primarily for residential uses. The buffer must include landscaping and/or fences, so that there will be an unbroken screen to limit visibility between the zones uses. Where walls are proposed, a narrower buffer may be used.
c. A buffer area of the required minimum width shall be located parallel to the abutting property line.
d. All buffers must include some level of landscaping and/or fences. Trees and vegetation used to enhance the buffer shall be planted sufficiently to provide year-round visual screening at maturity.
e. All easements including utilities, may be included in the buffer area or be used or otherwise employed to meet the lot requirements of the zone, if it is calculated as par of the required landscaped area.
5.7.7.3. Walls and/or fencing. Walls and fencing (including retaining walls) may be utilized within the buffer area. Where utilized, a six-foot masonry wall or opaque chain link fence or a fence of approved wood of natural decay resistance shall be placed along the property line or along the inside perimeter of the buffer so as to provide 100 percent (100%) year-round visual screening at time of the issuance of the certificate of occupancy.
5.7.8. Site preparation.
5.7.8.1. Grading. Areas of natural vegetation along property lines should be preserved wherever possible and incorporated into the site's overall landscape design.
5.7.8.2. Slope. Transitions of grades between adjacent property ownerships should be as smooth as practical and in no event shall exceed a slope of greater than 3:1 rise to run.
5.7.9. Stormwater detention standards.
5.7.9.1. Surface stormwater detention (e.g. dry pond or retention pond) shall be located to the side or back of a development. If site conditions warrant the placement of the stormwater detention system in the front of the development, then it shall be used as a landscape feature. Landscaping shall be appropriately designed and meet landscape standards of this section.
5.7.9.2. The use of properly designed, low impact development (LID) or green techniques for stormwater management are encouraged, wherever practical. LID best management practices (BMP) design elements from the Mississippi Department of Environmental Quality's Stormwater Runoff Management Manual, Volume 2, Chapter 4 are acceptable.
5.7.9.3. All surface stormwater detention system exterior slope faces shall be 4:1 or flatter. Also, surface stormwater detention systems shall have at a minimum, a four (4) foot wide landscape area along the top perimeter with maintenance access as required. These areas are to be landscaped with shrubs at a minimum ratio of one (1) per very 15 square feet of landscape area.
5.7.9.4. Select tree species may be allowed to be planted in shallow (four (4) or less total depth) dry, detention ponds. The specie type and density shall be approved at the discretion of the Director of Planning and the City Engineer.
5.7.9.5. Penalties. See Section 9.11.
(Ord. No. 2018-11, 7-17-2018; Ord. No. 2021-1, § 1, 2-2-2021; Ord. No. 2023-11A, § I, 7-5-2023)