§ 50.06 — Electric service in residential subdivisions
Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 50.06
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/fc7bbab5-4472-4bef-9fd9-a43e795f8b61
§ 50.06. - Electric service in residential subdivisions.
(a) The utility shall install a single phase underground electric distribution and street lighting system in all new residential subdivisions of two or more lots. At the discretion of the utility, an overhead distribution system may be installed around the perimeter of the subdivision where required. (b) The developer shall, free of charge, provide all necessary easements for all city electrical and communication systems. If a customer denies the utility an easement that is required to provide service, then the customer will become responsible for all additional costs incurred to provide service. The developer shall also pay a non-refundable sum of $1,000 per lot. Payment shall be made prior to construction of the electric system. Construction shall begin within a reasonable amount of time after payment. In the event there are changes in the construction plans, any resulting increased costs shall be paid for by the developer, and any decrease in costs shall be reimbursed by CWLP. All payments shall be at the applicable rate at the time payment is made. In the event that construction is delayed by the developer for a period of six months or longer from the time of initial payment, the cost shall be adjusted to the then current rate. The per lot fee shall be adjusted per section 50.06(c). CWLP shall not begin installation of electric distribution in the subdivision until payment is received in full. (c) The initial per lot cost listed above shall be adjusted annually on each May 15 beginning with May 15, 2013, by the same percentage change as the annual value for the previous calendar year of the United States Department of Labor, Bureau of Labor Statistics (the "BLS"), Consumer Price Index, Midwest Region All Items, Size Class B/C (Series ID CUURX200SA0). In the event this number (Series ID CUURX200SA0) is no longer provided by the BLS, CWLP shall utilize the nearest equivalent replacement available provided by the BLS. The current rates shall be available from the CWLP electric engineering department. (d) The street lighting style and layout shall be the current CWLP standard for subdivision roadway lighting. If decorative, additional, or other alternative lighting is desired, the developer should contact CWLP electric engineering for options and additional costs. The developer shall be responsible for all incremental costs, as determined by the CWLP engineering department, exceeding the current standard street lighting style and layout. CWLP engineering shall provide the developer a cost estimate for the additional costs to install an alternative lighting option. (e) Each customer is responsible for installing and maintaining the underground electric service cable from the utility service point, typically a distribution pedestal or transformer, to the customer metering point. (f) Three phase electric facilities will be installed in new residential subdivisions only at the utility's discretion. The developer may contact CWLP's electric engineering department to discuss the possibility and additional costs of three phase installation.
(Ord. No. 594-11-98, § 1, 11-17-98; Ord. No. 543-10-00, § 1(Exh. A), 10-3-00; Ord. No. 226-7-12, Exh. A, 7-3-12)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.