§ 12-3.10-4 — Permitted use: Application and fees
Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 12-3.10-4
Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/7212231a-a374-4852-999f-41c31da4f02b
Sec. 12-3.10-4. - Permitted use: Application and fees.
(a) In general, application and permit required. Any person desiring to obtain a permit to locate, place, attach, install, operate, maintain, control, remove, reattach, reinstall, relocate and replace small cell facilities within the right-of-way, on city-owned structures or facilities, utility poles, or any private property within the corporate limits of the city, must file an application, pay the required fees, and obtain the permit, except as otherwise provided in this chapter. (b) Application required for each small cell facility and equipment. A permit application must be submitted for each small cell facility and accessory equipment on a form, paper or electronic, provided by the city. If any information is deemed proprietary or confidential, then the applicant must mark each page accordingly. An application packet will be maintained by the city engineer. (c) Pre-application review. Prior to the submission of an application, the applicant is strongly encouraged to have a voluntary pre-application meeting with the director, or his/her designee(s), to review preliminary documents and graphic exhibits of the proposed facilities and discuss the application, location and design requirements for the proposed facilities. The primary purposes of the review are to streamline applications and reduce site plan and design revisions, as well as the multiple reviews associated therewith. Any applicant desiring a pre-application review will agree in writing that the applicable time-line for application review, as set forth in section 12-3.10-8, will be tolled during such review period. (d) Consolidation application permitted. Up to 30 nodes or small cell facilities may be included in a single application. (e) Application fees. Unless otherwise provided by law, all applications for permits pursuant to this chapter shall be accompanied by a nonrefundable fee for actual, direct, and reasonable costs incurred by the city to process and review the application, in the following amounts: (1) Five hundred dollars for an application seeking up to five small cell facilities attached to existing support structures, with an additional $100.00 for each attached small cell facility in excess of five; or (2) For an application to construct or install a new pole or support structure (i.e., not a collocation), a one-time fee of $1,000.00. (f) Annual license fee. An annual license fee of $270.00 is assessed per node in the right-of-way. (g) Removal fee may be applicable. A fee for removal of small cell facilities and/or their respective equipment may be applicable and is hereby authorized as necessary unless the fees described in subsections (e) and (f) above have already been tendered for the year in which the removal will occur, the removal does not hinder an ongoing city project or improvement, and the city incurs no additional cost to ensure safe removal. (h) Additional cost for make-ready work for attachment to city-owned poles and structures. Applicant may be required to bear additional costs for any necessary make-work estimate or construction as provided in section 12-3.10-12(c). (i) No application or permit fee required for eligible facilities requests. Provided that the applicant gives notice to the director of the work to be undertaken in the right-of-way and obtains street barricade or any other applicable permit required by the city, a permit or application fee shall not be required for: (i) routine maintenance or repairs of wireless facilities; (ii) the replacement or modification of a small cell facility that results in a facility of substantially similar or smaller size, weight, and height; or (iii) micro wireless facilities installations. (j) Escalation of fees. The fees required under subsections (e) and (f) of this section 12-3.10-4 may be adjusted (1) to recover a reasonable approximation of the increase in the city's actual and reasonable costs in administering and overseeing the small cell facilities, accessory equipment and support structures installed pursuant to this chapter, or (2) as otherwise permitted by applicable laws and regulations.
( Ord. No. 20-68 , § 4, 5-1-2020)
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.
