For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12-3.10-6 — Placement and maintenance of facilities in rights-of-way

Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 12-3.10-6

Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/235a68af-061c-4a5a-91ec-4c1c340068c3

Sec. 12-3.10-6. - Placement and maintenance of facilities in rights-of-way.

(a) Administrative review. The city shall utilize an administrative application review process as described herein for applications for the placement of small cell facilities (including accessory equipment) and any support structure in the right-of-way. (b) Departmental review. To ensure the public health and safety, the written recommendations for the addition of small cell facilities and accessory equipment will be required after submission of the permit application from the following departments: (1) Planning, engineering and permits. (2) Transportation. (c) Review by director. The director or his/her designee(s) will review and administratively process any application to determine if the application is complete and consistent with applicable codes and whether a permit for the small cell facilities should be issued for the location and the manner requested by the applicant, consistent with this chapter. (d) Minimal physical installation. The applicant's application shall demonstrate that the placement of the proposed small cell facilities and their associated accessory equipment or support structure on the right-of-way is the minimal physical intrusion and burden on the rights-of-way that will achieve the goal of enhancing the provision of personal wireless services when considering all pertinent factors contained in section 12-3.10-8. (e) Prohibitions. (1) No wireless facilities, accessory equipment or new support structure for such facilities or equipment may be installed in the city's right-of-way without (A) a license or franchise granted pursuant to section 12-3.10-3 hereof, and (B) a permit granted pursuant to sections 12-3.10-6 and 12-3.10-8 hereof. This prohibition shall not extend to a request by an electric utility that is regulated by the Alabama Public Service Commission to place or install a new utility pole where such request is not made to accommodate a small cell facility of a wireless service provider. (2) No wireless facilities, other than small cell facilities and micro wireless facilities, may be installed within the right-of-way unless a waiver is granted by the city. (3) No facility or equipment shall interfere with the safe operation of traffic control equipment, public safety communications equipment or street lights. (4) No facility, equipment or new support structure shall interfere with sight lines or clear zones for vehicular transportation, pedestrians, or public safety purposes. (5) No facility, equipment or new support structure shall interfere with compliance with the Americans with Disabilities Act or similar federal or state standards regarding pedestrian access or movement. (6) No facility, equipment or new support structure shall interfere or fail to comply with the Alabama Department of Transportation Utility Manual, as it may be applicable and as amended. (7) No facility, equipment or new support structure shall fail to comply with the applicable codes. (8) No facility, equipment or support structure shall be closer than five feet from the street curb or edge of pavement if no curb is present, unless otherwise approved by the city engineer. (9) No facility or equipment shall be attached to a utility pole owned by any utility not owned or operated by the city unless a lease, license, permit, certificate of authority, express waiver or other similar documentation demonstrating authorization is provided from such owner. (10) No facility or equipment shall be placed on any arms or any horizontal structure used to support or mount traffic control signals or other traffic control devices. (11) No facility or equipment shall interfere with electrical lines, cable lines, or their associated equipment, in that wireless facilities must be placed at least ten feet away from energized electrical distribution lines, unless otherwise approved by the utility company. (12) No wireless facility may be hung from energized electrical lines or mounted on poles to be removed in conjunction with the city's desire to utilize undergrounding of electrical utilities in a particular area. (13) Facilities and equipment shall comply with the following spacing requirements: a. Minimum spacing between proposed new (non-replacement) and existing privately-owned support structures: 1. The minimum horizontal distance between a new (non-replacement) support structure and associated small cell facilities and any other existing, or permitted but unconstructed, support structures and small cell facilities on the same side of the right-of-way at the time a complete application is filed with the city, irrespective of the owners/operators, shall be not less than 300 linear feet, as measured parallel to the right-of-way, unless a waiver is granted by the city based upon demonstrated need or other circumstances. b. Spacing between proposed new (non-replacement) support structures and existing publicly owned support structures: 1. New support structures shall be located midway between the immediately adjacent existing publicly-owned support structures on either side of the proposed support structure to the maximum extent possible. c. Multiple requests for installations at the same location: 1. If multiple requests are received and are pending at the same time to install support structures that would violate the applicable spacing requirements, or to collocate two or more small cell facilities on the same support structure, the city may resolve conflicting requests in a reasonable and nondiscriminatory manner. (f) Limitations. (1) If allowed, small cell facilities collocated on the same utility pole as a street light shall be on the same disconnect as the street light, where practicable. (2) Small cell facilities shall be grounded and otherwise comply fully with all applicable codes. (3) Whenever a conduit of small cell facilities crosses telephone or electric power wires, wires shall cross and be maintained in accordance with the National Electrical Code, the National Electrical Safety Code, and all applicable ordinances, codes and regulations of the city and all other applicable codes. (4) Small cell facilities must comply with the applicable structural requirements with respect to wind speed. (g) Compliance with law. Applicant shall at all times comply with and abide by all applicable provisions of state and federal law and city ordinances, applicable codes and regulations in placing and maintaining small cell facilities in the right-of-way. (h) Burden of proof. The burden of proof shall at all times be on the applicant to establish compliance with requirements under this chapter and state and federal law. (i) Permit required; emergency. Except in case of emergency, no placement or maintenance of small cell facilities or their operation thereof shall commence until all applicable permits are obtained. The city reserves the right to inspect all wireless facility work to ensure compliance with this chapter and applicable permits. Applicant shall provide a written notice and certification of compliance that the facilities were constructed in accordance with the approved specifications upon final completion of a wireless facility installation, and no operation shall occur unless the city has conducted a final inspection and issued a certificate of completion. Where a facility has been installed or operated without permit due to an emergency, a permit shall be required after-the-fact within 30 days if a permit would have originally been required to perform the work undertaken in the right-of-way in connection with the emergency. Once the emergency is abated, the small cell facilities in question must be removed unless permitted without the emergency as a basis. (j) Administrative review. The director or his/her designee(s) will review and administratively process any application for a permit to determine whether, consistent with the requirements set forth in this chapter, a permit should be issued for the location and in the manner requested by the applicant. The permitting process will be administrative and not require the approval of the city council. The factors, requirements, and guidelines the director and/or subsequently, upon appeal, the city council, may consider and will apply when determining whether to issue a permit for placement of new support structures or small cell facilities and accessory structures on the right-of-way include the following: (1) Whether denial of a permit to place the proposed structures at the requested location would prohibit or have the effect of prohibiting the provision of telecommunications or personal wireless service; (2) The ability and specifications of the structures upon which the small cell facilities are placed to safely support those facilities; (3) The visual impact of placing the support structures or small cell facilities in the subject area; (4) The character of the area in which the structures are requested, including surrounding buildings, properties and uses; (5) Whether the appearance and placement of the requested structures is consistent with the any uniform design guidelines hereafter adopted as provided in section 12-3.10-9(d)(2); (6) Whether the structures are consistent with the historic nature and characteristics (if any) of the requested location, including but not limited to any uniform design guidelines hereafter adopted as provided in section 12-3.10-9(d)(2), land use requirements of the city's commercial revitalization project areas and framework plan areas; (7) All small cell facilities and support structures must (a) not obstruct the safe operation of traffic control equipment or street lights; (b) not interfere with driver or pedestrian sight lines or clear zones for transportation or pedestrians; (c) comply with applicable federal, state and city standards regarding pedestrian access and movement; (d) comply with applicable health and safety codes; (e) be constructed in a manner to minimize physical damage to private property; and (f) not include advertisements. (8) Each antenna associated with a small cell facility: a. When mounted at the top of a pole, whether or not enclosed, 1. An initial installation will not exceed six feet above the top of the pole, and 2. A collocated installation will be no taller than necessary to house the collocation; b. When mounted at the top of a pole, a pole-top extension shall be no taller than necessary for separation from other attachments; c. When mounted on a lateral standoff bracket on a pole, the antenna shall protrude no more than necessary to meet clearances; d. When mounted on or within an existing or replacement decorative pole, shall conform to the design aesthetics of the original pole, including the design, style and color; and e. When mounted on another structure, shall not impair the function of the structure. (9) Wireless equipment associated with an antenna shall (a) when mounted on a pole other than at the top, be flush-mounted or as near to flush as possible; (b) when mounted on a pole other than at the top, provide a minimum of ten feet of clearance above streets, driveways and sidewalks; and (c) when located in a ground-mounted cabinet, meet design, style, color and material requirements per the city's lawful right-of-way regulations. (10) Replacement poles shall be (a) installed within five feet of the location for the original pole; and (b) of a material and dimensions that matches as closely as feasible existing adjacent poles, or consistent with any published local standards for utility pole placements. (11) New poles shall (a) be aligned with the predominant pattern of existing adjacent structures; and (b) not be located directly in front of storefront windows, primary walkways, primary windows, or primary egress points to buildings. (12) To the extent feasible, cables and wires associated with a small cell facility shall be (a) installed within the pole; (b) flush-mounted to the pole where internal installation is not feasible; or (c) encased in a cover or conduit when flush-mounted to the pole. (13) An electric meter, if required, will be pole-mounted where feasible to the extent authorized by the pole owner and electric provider. (14) To the extent feasible, all small cell facilities and associated accessory equipment that are placed in the city shall be attached to a pre-existing support structure that is owned, controlled or leased by a utility, franchisee, the city or other entity. If the applicant demonstrates that (i) no reasonable collocation opportunities exist in the area where the small cell facility is proposed to be placed, or (ii) attachment to a new structure will provide a more visually appealing design, demonstrably more effective service coverage, or some other public benefit that would not be achieved by collocation, the applicant may request that a new pole or other support structure be installed in that area for purposes of constructing the small cell facilities. Before any new support structure is permitted, each of the following must occur: a. The applicant must have provided the city written evidence supporting a claim under subparagraph (j)(14)(i) or (ii) above. In the case of (i), this evidence shall include, but not be limited to, affidavits, correspondence, or other written information that demonstrates that the applicant has taken all commercially reasonable actions to achieve collocation in the requested location that the applicant has pursued but has received no response or has been denied access to all potential collocation sites in the subject area (and the reasons any such denial(s)), and otherwise show that the applicant is unable to co-locate on an existing support structure. In the case of (ii), the evidence required by the city may include, but is not be limited to, affidavits, correspondence, engineering report or other written information depicting the claimed more visually appealing design, demonstrating the claimed more effective service coverage, or demonstrating the claimed public benefit; b. The city engineer must recommend the placement of a new support structure in the right-of-way; and c. The director or his/her designee(s) must approve the recommendation of the city engineer to allow the issuance of a permit that includes placement of a new support structure in the right-of-way. (15) If a facility is attached to a utility pole or other support structure in the right-of-way, no antenna or other part of the facility shall extend more than ten feet above the height of that structure; provided that, in the event that the applicant demonstrates that National Electric Safety Code, National Electric Council, or International Code regulations (as maintained and adopted by the city) or other factors create an undue hardship in complying with this height requirement, the director may permit a facility to extend up to 15 feet above the height of such support structure, unless it creates a life safety issue; (16) The accessory equipment shall, if reasonably possible, be placed at least eight feet above the ground; (17) The color of antenna and accessory equipment shall be compatible with that of the support structure; (18) The facility (including the accessory equipment) shall not be illuminated unless required by federal regulations; (19) Whether the proposed installation could cause harm to the public or poses any undue risk to public safety; (20) Whether the proposed installation may interfere with vehicular traffic, passage of pedestrians, or other use of the right-of-way by the public; (21) If the proposed installation will disturb conditions on the right-of-way, whether the applicant can demonstrate its ability and financial resources to restore the subject area to its pre-existing condition following installation; and (22) If the proposed new pole will be compatible with the design and character of the surrounding neighborhood. (k) Under-served areas. As the city recognizes that a lack of competitive land-based internet access options may exist for certain underserved residential areas (which means an area with fewer than two options via coaxial cable, copper lines, fiber, or other land-based internet), the director may consider whether a permit application offers increased service coverage in an underserved residential area in deciding whether to permit the installation of a new support structure in the rights-of-way pursuant to subparagraph (j)(14). This provision shall not be a cause for denial of a permit or placement by a wireless service provider or wireless infrastructure provider.

( Ord. No. 20-68 , § 6, 5-1-2020)

Ask a question about Birmingham law

Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.