For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12-3.10-9 — Application requirements and process

Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 12-3.10-9

Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/dd86d5f7-d268-4149-90e7-91d89370d084

Sec. 12-3.10-9. - Application requirements and process.

(a) Approval required. Except as otherwise provided, a permit to construct or install small cell facilities shall not be granted under this chapter except upon approval by the director or director's designee(s), city council, or as otherwise designated by resolution or ordinance to consider application under this chapter, in which applicant must sufficiently describe the manner, form, design, placement, its effect and impact, and other pertinent information with regard to placement and maintenance of small cell facilities in the right-of-way and/or on private property. (b) Application. An application must be submitted for every small cell facility, equipment or support structure. (c) Application requirements. At a minimum every application should include, as follows: (1) a. The applicant's name, address, telephone number, and e-mail address; and b. The names, addresses, telephone numbers, and e-mail addresses of all consultants, if any, acting on behalf of the applicant with respect to the filing of the application; (2) A general description of the proposed work and the purposes and intent of the small cell facility. The scope and detail of such description shall be appropriate to the nature and character of the work to be performed, with special emphasis on those matters likely to be affected or impacted by the work proposed; (3) Site plan and engineering design and specifications, including engineering drawings to scale, of the proposed small cell facilities and related structures, including the location of radios, antenna facilities, transmitters, equipment shelters, cables, conduit, point of demarcation, backhaul solution, electrical distribution panel, electric meter, and electrical conduit and cabling, and support structure(s); (4) Design documents should include photo(s) of the existing pole, and a photo simulation of the pole with attached equipment. Where applicable, the design documents should include specifications on stealth design, pole modification, and ADA compliance; (5) Map(s) designating with specificity the location(s) of the requested facilities; The geographic coordinates (GIS) of all antenna and other proposed facilities; (6) For city traffic light poles, verification that the pole is eligible for attachment; (7) A load bearing study that determines whether the pole requires re-enforcement or replacement in order to accommodate attachment of small cell facilities and/or equipment. If pole re-enforcement or replacement is warranted, the design documents should include the proposed pole modification; (8) Copy of the manufacturer's detailed specifications for small cell equipment and antennas, including photographs or illustrations and a complete description of all pertinent physical and electrical characteristics; (9) Supporting information if stealth modifications are required in order to comply with the design standards (i.e. to blend with the character and style of the surrounding area) or criteria for installations; (10) Supporting information if the application seeks approval of a new pole, including design and specification drawings for the new pole, and a statement regarding the reasons for and what other alternatives, if any, were identified but not utilized, and why; (11) Applicable design and specification drawings if the proposed installation will require re-enforcement or replacement of an existing pole; (12) The number, size, type and proximity to the small cell facilities of all communications conduit(s) and cables to be installed; (13) Description of the utility services required to support the small cell facilities to be installed; (14) If the small cell facilities will be located on a support structure on the right-of-way that is owned by any entity other than the city or the applicant, a copy of any permit, license, lease, agreement, letter of authorization, or other documentation evidencing that the owner of that support structure authorizes the facilities to be attached thereto or agrees in principle to authorize that attachment (which documentation may be redacted as to business terms including rent or other fee or payment information); provided that, if the city issues the requested permit but it is subsequently determined that the applicant lacked such authority, the subject permit may be revoked and any license to use that part of the right-of-way be rescinded; (15) All permits and letters of authorization; Valid FCC license, where applicable or other appropriate certificates or permits as required; (16) List of the contractors and subcontractors, and their contact information, authorized to work on the project; (17) A certification from a licensed engineer that the small wireless facility, associated equipment, and any associated new or replacement support structure shall comply with all applicable codes and FCC rules and regulations; and (18) A declaration signed by an authorized representative of the applicant stating that the information in the application is true and accurate and that the small wireless facility and (if applicable) associated pole will be built in conformance with the specifications set forth in the application. (d) Objective design guidelines; other requirements. (1) Similar character and style of area required. Applicant shall use best efforts to provide a reasonable location, context, color, stealth and concealment necessary to maintain the character and style of the surrounding areas so as to minimize the visibility and environmental impact. (2) Design guidelines. The director is authorized to adopt reasonable design guidelines addressing aesthetics requirements provided such design guidelines they are no more burdensome than those applied to other types of infrastructure deployments, objective and are published in advance. (3) New structures; availability of alternatives. No new utility pole, pole-type structure, or other freestanding structure shall be allowed in the right-of-way unless the applicant demonstrates and the director or his/her designee(s) and/or city council (when applicable) determines that no existing structure in the right-of-way can accommodate the applicant's proposed facility or antenna, or that attachment to a new structure will provide a more visually appealing design, more effective coverage, or some other public benefit that would not be achieved by collocation. (4) Limitations: No property right. A permit from the city constitutes authorization to undertake only certain activities in rights-of-way in accordance with this chapter and does not create a property right or interest in the right-of-way or grant authority to impinge upon the rights of others who may have an interest in the rights-of-way. (5) Limitations: Use of city-owned poles or structures. City-owned structures or poles for attachment or collocation may not be available where the city determines that an additional attachment or collocation is detrimental to public safety or welfare, and such decisions will be final. Availability will be on a first-come, first-served basis, and if the city determines collocation on such city-owned poles or structures has reached is maximum, is unsafe or should otherwise not be permitted, the city may propose alternative collocations to the applicant. (6) Coordination of work. Upon request of the city, applicant may be required to coordinate placement or maintenance activities under a permit with any work, construction, installation or repairs that may be occurring or scheduled to occur within a reasonable time frame in the subject rights-of-way and applicant may be required to reasonably alter its placement or maintenance schedule as necessary to minimize disruptions. (7) Zoning. Any applicant that seeks to construct or modify a wireless facility or support structure on private property shall be subject to applicable zoning requirements. (8) Undergrounding provisions. From time to time, as both residential and commercial developments continue within the city, new regulations relating to undergrounding utilities and their placement may require relocation of small cell facilities or replacement thereof to deploy stealth design of facilities to camouflage with the undergrounding of utilities including relocation of equipment to enhance compatibility and blend into the character and style of a the surrounding area in a manner that reduces visibility. Applicant shall comply with nondiscriminatory undergrounding requirements that prohibit electric utilities, telecommunications or cable providers from installing structures in the rights-of-way without prior zoning approval in areas zoned for single family residential use, provided such requirements shall not prohibit the replacement of, or collocation on, existing structures. (9) Conditional use of public right-of-way. a. The city shall retain the right, without limitation, to alter, change, or cause to be changed, the grading, installation, relocation or width of the rights-of-way within the limits of the city. Neither the issuance of a permit nor any provision set forth in this chapter shall affect the city's authority to add, modify, vacate or abandon rights-of-way. b. If an applicant desires to use any of its small cell facilities for the purpose of providing any other services other than the provision of communications service, including utility or non-utility services to existing or potential consumers or resellers, or by providing any other use to existing or potential consumers, an applicant shall seek such additional and separate authorization from the city and other authority as may be required by applicable law. c. An applicant, or any person that leases or otherwise uses the small cell facilities of an applicant, which has been issued a permit or that has otherwise been authorized to place a small cell facility in the rights-of-way of the city shall not take any action against the city that will impede the lawful exercise of the city's rights, including without limitation the city's right to require the removal or relocation of such facilities from the rights-of-way of the city, notwithstanding the effect of same on applicant's ability to place or maintain small cell facilities in rights-of-way of the city. (10) All rights of city reserved. Notwithstanding any provision of this section or the city's issuance of a permit or other authorization to place a small cell facility in the right-of-way, the city may place and maintain, grant utility easements for, or otherwise permit the placement and maintenance of other utilities in the rights-of-way, including, water, sewer, electric, gas, storm drainage, telecommunications, traffic, and other utilities and facilities, cables or conduit, including underground and overhead installations, in rights-of-way occupied by the applicant. Applicant may allow city facilities to be collocated within rights-of-way through the use of a joint trench during applicant's construction project. Such joint trench projects shall be negotiated in good faith by separate agreement between applicant and city and may be subjected to other city rights-of-way requirements. The city further reserves without limitation the right to alter, change, or cause to be changed, the grading, installation, relocation or width of the rights-of-way within the city. (11) Restoration of right-of-way. The area disturbed by the construction or maintenance of a small cell facility in the right-of-way shall be kept to a minimum. The applicant shall, at its own expense, restore all right-of-way to a condition equal to or better than the condition existing prior to such construction or maintenance activities. Restoration methods and any work required to repair the right-of-way shall be performed in accordance with articles G, H and I of title 4, chapter 5 of the City Code or other city-adopted standards and specifications applicable to the construction of city improvements within the right-of-way. All repairs and restoration work must be approved by the city engineer and final completion of any such work is subject to the reasonable approval of the city engineer. If necessary, unsatisfactory restoration work shall be corrected by the applicant, or by the city with all costs billed to the applicant. (12) Maintenance. Applicant shall at all times keep the small cell facility authorized by the permit in a good state of repair from the standpoint of both structure and appearance. (13) Scheduling. In the interest of the public's health, safety and welfare, upon request of the city, an applicant shall coordinate placement or maintenance activities under a permit with any other work, construction, installation or repairs that may be occurring or scheduled to occur within a reasonable timeframe in the subject rights-of-way. The city may require an applicant to alter reasonably its placement or maintenance schedule for permitted work as necessary so as to minimize disruptions and disturbance in the rights-of-way. The city may provide a more definite time frame based on specific city construction or maintenance schedules. (14) Applicant's liability and risk. The city makes no warranties or representations regarding the fitness, suitability or availability of rights-of-way for the applicant's small cell facilities and any performance of work or costs incurred by applicant or provision of services shall be at applicant's sole risk. Nothing in this chapter shall affect the city's authority to add, vacate or abandon rights-of-way and city makes no warranties or representations regarding the availability of any added, vacated or abandoned rights-of-way for small cell facilities. Notwithstanding any requirements or conditions, the city engineer may impose in order to protect the public from injury and the right-of-way from damage, an applicant shall be solely responsible for the adequacy and safety of the engineering of its facilities and the operations authorized by the permit. Construction performed to place or maintain an applicant's small cell facilities shall not interfere, displace, damage or destroy any other utilities or facilities, including but not limited to, sewers, gas or water mains, storm drains, pipes, cables or conduits of the city or any other person's facilities lawfully occupying the rights-of-way of the city. (15) Inspection. The city shall have the right to make such inspections of facilities placed or maintained in rights-of-way as it finds necessary to ensure compliance with this section. In the event the city determines that a violation exists with respect to applicant's placement or maintenance of facilities in the rights-of-way that is not considered to be an emergency or danger to the public health, safety or welfare, the city will provide applicant written notice setting forth the violation and requesting correction. (16) As-built plans. An application for a small cell facility right-of-way placement permit, including an application to replace an existing small cell facility in the right-of-way, shall include plans showing the location of the proposed installation of facilities in the rights-of-way. If the plans so provided require revision based upon actual installation, the applicant shall promptly provide revised plans. Further, the applicant shall provide "as-builts" upon completion of any installation or construction. The plans shall be in a digitized format showing the two-dimensional location of the facilities based on the city's geographical database, or other format acceptable to the city. The applicant shall provide such plans at no cost to the city. (17) Cooperation. Subject to applicable law, an applicant shall, on the request of any person holding a permit issued by the city, temporarily support, protect, raise or lower its small cell facilities to permit the work authorized by the permit. The expense of such temporary support, protection, raising or lowering of facilities shall be paid by the person requesting the same, and the applicant shall have the authority to require such payment in advance. The applicant shall be given not less than 30 days' advance written notice to arrange for such temporary measures. If the city requests the temporary support, protection, raising or lowering of a facility for a public purpose, the city shall not be charged for the temporary support, protection, raising or lowering of the facility. (18) Signage. a. No signage, logos, symbols, or any messages of a commercial or noncommercial nature are permitted on any small cell facility, accessory equipment, support structure, or security fencing. This prohibition does not include the information sign permitted in the following subsection. b. One small sign measuring no more than two feet by three feet that contains wireless provider information, emergency telephone numbers, and any other information required by local, state, and federal regulations governing small cell facilities is permitted. Such signage shall not include commercial advertising and is subject to approval by the city. c. Submission of application. Upon meeting the requirements as listed herein and submitting the application, the city shall review and issue permits within the timeframes and processes provided herein.

( Ord. No. 20-68 , § 9, 5-1-2020)

Ask a question about Birmingham law

Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.