§ 4-9-36 — Stormwater management plan standards
Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-9-36
Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/a95d15d8-c996-4ba3-a931-b3b151888c15
Sec. 4-9-36. - Stormwater management plan standards.
(a) The stormwater management plan shall be prepared and stamped by an engineer, landscape architect, or architect competent in civil and land development design and licensed to practice in the State of Alabama. Additional professional license requirements pertaining to preparation of the stormwater management plan are as follows: (1) Portions of the plan that require hydraulic and/or hydrologic calculations (excluding the determination of soil infiltration and permeability rates) and design shall be prepared plans signed, sealed and dated by a licensed professional engineer, qualified in civil engineering, in good standing with the Alabama State Board of Licensure for Professional Engineers and Land Surveyors, and licensed to practice in the State of Alabama. (2) Portions of the plan that require soil infiltration tests, soil permeability assessments, and soil media design shall be prepared by a soil scientist, geologist or geotechnical engineer licensed to practice as professional in the State of Alabama. (b) Professionals responsible for preparation of the stormwater management plan shall indicate conforming licensure by affixing their seal as a licensed professional and providing signature and date of signature in the manner required by the Alabama Law Regulating Practice of Engineering and Land Surveying, Code of Alabama 1975, tit. 34, ch. 11. (c) Performance standards, technical methods, required calculations, and post construction stormwater practice design specifications that are applied to prepare the stormwater management plan shall be in accordance with the design manual. Technical methods, calculation approaches, or practices not shown in the design manual shall not be used without prior written permission of the director. This chapter shall supersede where the regulations of this chapter and the policies stated in the design manual conflict. (d) The stormwater management plan shall be subject to any additional requirements as set forth in city subdivision regulation, zoning ordinance, engineering and construction specifications, public work specifications, and all other city regulations. (e) It is the responsibility of the owner to be aware of, and to fully address, any regulations or permits that may apply to his/her land development, including state and federal regulations for construction activities that will have an impact on Waters of the State, wetlands, sinkholes, landslide areas, and threatened or endangered species. The director may require proof of land development conformance with, or coverage by, any applicable local, state, or federal regulation or permit in the stormwater management plan.
(Ord. No. 19-31, § 1, 3-29-2019)
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.
