§ 4-9-37 — Stormwater record drawings
Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-9-37
Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/81a9d76b-0f07-4ea8-8af8-6cbd39759ba8
Sec. 4-9-37. - Stormwater record drawings.
(a) The applicant shall prepare and provide a stormwater record drawing within 120 days of completion of the land development project. (b) The stormwater record drawing shall reflect the "as-constructed" condition of the land development and shall demonstrate substantial conformance with the approved stormwater management plan for the land development. Significant deviations from the approved stormwater management plan shall be considered violations of this chapter and are grounds for any of the following: (1) A requirement to submit a new request for termination of the post construction stormwater permit, including submittal and obtaining approval on a revised stormwater record drawing; (2) A requirement to submit and obtain approval on a revised stormwater management plan prior to performing corrective action(s); (3) The invocation of the injunctions and penalties defined therein; (4) Withholding the release of a bond or termination of the post construction stormwater permit pending the completion of corrective action(s); (c) The stormwater record drawing shall include all of the required and applicable elements as specified in the design manual. (d) The stormwater record drawing shall be prepared and certified in the manner established in the design manual by registered land surveyor or professional engineer licensed to practice in the State of Alabama. Additional professional license requirements pertaining to preparation of the record drawing are as follows: (1) The record drawing shall be reviewed by a professional engineer or landscape architect for conformance with the approved stormwater management plan. Portions of the land development that are not in conformance with the approved stormwater management plan shall be identified and accompanied by a narrative explanation of the non-conformance. The director may also require engineering analyses and resubmittal of the stormwater management plan (entirely or in part) to prove land development conformance with required performance standards. The record drawing and any associated narrative, engineering analyses, and accompanying plan shall be signed, sealed and dated by the professional engineer, landscape architect, or architect competent in civil and land development design and licensed to practice in the State of Alabama, as appropriate. (2) Portions of the plan that require soil infiltration tests or soil permeability assessments shall be prepared by a soil scientist, geologist or geotechnical engineer licensed to practice as a professional in the State of Alabama.
(Ord. No. 19-31, § 1, 3-29-2019)
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.