§ 4-9-38 — Post construction stormwater permit termination
Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-9-38
Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/0e0f6180-afba-4ef9-92ef-70872054df88
Sec. 4-9-38. - Post construction stormwater permit termination.
(a) It is the responsibility of the permit holder to request termination of a post construction stormwater permit. The submittal of the record drawing shall constitute a request for permit termination. (b) Stormwater drainage systems for which a record drawing has been submitted shall be subject to a permit termination inspection by the director. Systems that meet all of the following criteria shall be considered functional and operating as indicated in the approved stormwater management plan: (1) The post-construction stormwater practice maintenance map provides an accurate depiction and labelling of the post-construction stormwater practices on the land development; (2) The post-construction stormwater maintenance agreement is fully executed; (3) The stormwater drainage system shall be free of blockages, sediment, trash, construction related wastes, and other debris; (4) The stormwater drainage system shall not be damaged or otherwise in need of repair or replacement; (5) Accumulated sediment from basins, traps, and other areas where sediment was captured during construction, whether intentionally or unintentionally, shall be entirely removed, unless otherwise provided for in the stormwater management plan; (6) All pervious areas draining to the stormwater drainage system with permanent vegetation or landscaping as indicated in the approved stormwater management plan; (7) No prohibited conditions as established in section 4-9-81 of this chapter exist; and (8) All temporary erosion protection and sediment control measures are removed. (c) Corrective actions shall be required of the owner(s) where these inspection criteria are not met. The director may re-inspect the system to confirm satisfactory completion of any required corrective actions and may withhold inspection approval until such actions have been completed and all criteria are satisfied. (d) The post construction stormwater permit for a land development shall not be terminated until the director approves the stormwater record drawing and the permit termination inspection. (e) Permits obtained for an applicable land development that was ultimately not constructed or was partially constructed shall not be terminated and the bond not released until the land development is fully stabilized against soil erosion with permanent vegetation and it is demonstrated that the project meets the requirements of this chapter for any construction that did occur. In the event that one or both of these conditions are not met, corrective actions shall be imposed on the owner(s) as required to meet these conditions. Corrective actions may include, but are not limited to, the installation and care of permanent vegetation until it is fully established, the preparation, submittal, and approval of a stormwater management plan, and/or the design and construction of post-construction stormwater practices.
(Ord. No. 19-31, § 1, 3-29-2019)