Sec. 4-9-61. - Stormwater system requirements.

(a) The performance standards provided in the design manual establish the minimum stormwater management requirements for the design and construction of individual and collective stormwater drainage systems and post construction stormwater practices on land developments not exempted by this chapter, whether such systems and practices are located on public or private lands. (b) Individual and collective stormwater drainage systems and post construction stormwater practices on new developments not exempted by this chapter, whether such systems and practices are located on public or private lands, shall meet or exceed the following stormwater performance standards established in the design manual: stormwater quality protection; flood protection; downstream analysis; and, drainage system design. Adherence to these performance standards for a new development shall be calculated for the entire area of the land development, inclusive of all pervious and impervious surfaces located inside the legal boundaries of the land development. (c) Individual and collective stormwater drainage systems and post construction stormwater practices on redevelopments not exempted by this chapter, whether such systems and practices are located on public or private lands, that will result in a net increase in impervious surface area from the previously developed condition shall be subject to the following performance standards: stormwater quality protection; downstream analysis; and drainage system design. If the downstream analysis indicates an increase in peak discharges in the post-construction condition as compared to the pre-construction condition, the flood protection performance standards shall also apply. Adherence to applicable performance standards for a redevelopment shall be calculated for the increase in impervious surface area that will result from the redevelopment. (d) In the evaluation of, and adherence to, flood protection and downstream analysis performance standards, the pre-construction condition shall be the existing condition of the land at the time of application for a post construction stormwater permit for the land development. In the event that demolition of pavement or structures has already occurred at the time of application for a post construction stormwater permit on a property proposed for redevelopment, the pre-construction condition shall be the previously developed condition of the property, as obtained from aerial photography, historical mapping, or other reliable source of impervious cover information. It shall be the responsibility of the owner to provide proof of the pre-construction condition with the stormwater management plan. (e) Individual and collective stormwater drainage systems and post construction stormwater practices shall be designed and constructed in strict accordance with the policies, design criteria, calculation and technical specifications, and guidance established in the design manual and in the standard specifications for the construction of public works projects, where applicable, unless otherwise established by this chapter or by the director. Adherence to this requirement shall be established in the stormwater management plan. Other technical methods, calculation approaches, and practices shall not be used without the approval of the director. In the event that an alternative method, approach, or practice is allowed, the director may request the owner to provide additional hydrologic and hydraulic calculations, or other technical information to confirm that the alternative method, approach, or practice will meet the performance standard(s). (f) The Federal Emergency Management Agency ("FEMA") or the city's floodplain zone overlay (City of Birmingham Zoning Ordinance Chapter 8, Article II) may have more stringent requirements for stormwater drainage systems and post construction stormwater practices for detention/retention that are located within a flood hazard zone. It is the engineer of record's responsibility to determine if a stormwater drainage system will be within a flood hazard zone and to design it in accordance with FEMA requirements, or the city's requirements if more stringent. Such requirements and designs shall be provided in the stormwater management plan. (g) Land development shall not, under any circumstances, be designed or constructed to allow impervious surfaces to discharge directly to a natural water body, even if one or more of the stormwater performance standards has been waived. In such cases, stormwater from these surfaces shall discharge from the land development through an appropriately designed drainage pipe, ditch, or swale, or overland through level spreader and into a vegetated buffer that have been designed, constructed, and suitably vegetated to withstand the expected stormwater discharges without damage or erosion. In any case, permanent protection from soil erosion shall be provided, at the inlet and outlets of the discharge, and through the buffer if used. Vegetated stabilization alternatives are preferred when technologically feasible. (h) Banks of all streams, channels, ditches and other earthen stormwater conveyances shall be left in a stabilized condition upon completion of the project. No actively eroding, bare or unstable banks shall remain. Placement of riprap and other hard armor as the sole bank protection method on blue line streams is only allowed when vegetative bank stabilization alternatives are not technologically feasible. (i) Post construction stormwater practices for post construction stormwater management on private land development shall be selected with consideration of the practicality of practice maintenance and operation by the type of future land owner(s) intended for the development. Practices that are considered, in the opinion of the director, to be impractical for land owner operation and maintenance will not be approved. (j) Post construction stormwater practices shall not be located in public rights-of-way or on public property without prior approval by the director. (k) Green infrastructure practices designed to infiltrate stormwater runoff shall not be located in wellhead protection areas or in other areas where infiltration is prohibited or where groundwater is protected by a local, state, or federal plan, permit, regulation, or agreement.

(Ord. No. 19-31, § 1, 3-29-2019)