Sec. 4-9-63. - More stringent performance standards.

Constructed onsite stormwater systems that are designed and based on requirements that are more stringent than or differ from the minimum requirements established in the design manual may be necessary in order to effectively control and manage post construction stormwater. The director may require the land development to meet one or alternate or more stringent performance standards or design criteria than those established in the design manual under the following circumstances: (a) The proposed land development is located on a property that is considered a brownfield or is otherwise known or believed to have pollutants in the soil or on the ground that, if discharged from the property in stormwater or groundwater, may cause harm to the general public or the environment. (b) The proposed land development will, after development, discharge stormwater to a waterbody that is included on the most recent Alabama § 303(d) List, or for which a TMDL has been approved by the USEPA. (c) The proposed land development will, after development, discharge stormwater to a waterbody that is classified by ADEM for Public Water Supply, as an Outstanding National Resource Water, as an Outstanding Alabama Water, or as a Treasured Alabama Lake, and the director, through sound engineering judgement, has reason to believe that unregulated stormwater discharges from the land development may adversely affect the waterbody. (d) The proposed land development is located on, or will, after development, discharge stormwater to an area that has been designated by the USFWS as critical habitat for one or more threatened or endangered species, or where the USFWS has identified one or more threatened or endangered species are located. In such cases, the owner may be required to consult with USFWS regarding the land development and to provide with the stormwater management plan any requirements of USFWS for the land development or outcomes of said consultation. (e) The director has determined, through watershed management plans, stormwater master plans, engineering studies, or engineering judgement based on a history of existing pollutant, erosion, drainage or flooding problems, whether documented or undocumented, whether on the land development or on adjacent or downstream locations, that additional restrictions are needed to limit adverse impacts of the proposed land development that may result from stormwater discharges.

(Ord. No. 19-31, § 1, 3-29-2019)