§ 4-9-62 — Performance standard waivers
Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-9-62
Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/04ea42b6-c328-43a7-828a-e1d3bd133eb1
Sec. 4-9-62. - Performance standard waivers.
(a) Land developments conducted by entities under the jurisdiction and supervision of the Alabama Public Service Commission are waived from complying with the stormwater quality performance standard established in the design manual, only insofar as these land developments are exempted from local government water quality regulation by Code of Ala. 1975, tit. 11, ch. 89C. (b) A waiver of one or more of the stormwater performance standards established in the design manual may be granted by the director under one or more of the circumstances defined below. Waiver of one or more of the performance standards shall not be construed as an exemption of the proposed land development from all other requirements of this chapter. (1) One or more performance standards may be waived for redevelopments that will result in zero net increase in impervious surface area from the pre-construction condition. (2) The small storm extended detention performance standard may be waived for new developments and redevelopments: where the post-construction condition peak discharge at the outlet(s) of the development is less than 2.0 cfs at each offsite discharge location; or, that discharge directly into open conveyances such as larger streams, rivers, wetlands, or lakes provided the discharge will not have an impact on stream bank or channel integrity. (3) Flood protection performance standards may be waived for redevelopments that do not increase peak discharges. Demonstration of this condition shall be provided by the applicant(s) through preparation of a downstream analysis comparing the post-construction discharges without the influence of any additional flood protection storage practices to pre-construction discharges. The analysis shall be prepared by a professional engineer licensed in the State of Alabama. (4) The director may waive one or more flood protection standards and/or the downstream analysis requirement if engineering data, whether provided by the owner or the director, demonstrates that implementation of flood protection performance standards is unnecessary or may cause adverse flooding or erosion impacts on the subject property, on adjacent, nearby or downstream properties, whether publicly or privately held, or on receiving water(s). (5) The director may waive one or more of any of the performance standards as an onsite design requirement if the land development will discharge, after construction, to an existing downstream or shared offsite post construction stormwater practice or system of practices that was previously designed and constructed to receive stormwater discharges from the proposed development, provided the practice or system of practices that will provide the required stormwater quality protection and/or flood protection with inclusion of stormwater discharges from the proposed land development. a. The owner shall evaluate the adequacy of the offsite or shared stormwater practice(s) to receive a waiver if such information is not already in the director's possession. This evaluation shall be prepared by a professional engineer licensed in the State of Alabama and provided in the stormwater management plan. b. The owner shall prepare a stormwater management plan and/or record drawing for the offsite or shared stormwater practice(s) if such information is not already in the director's possession. (6) The director may waive one or more of the performance standards if the land development is determined to be eligible for payment of a fee-in-lieu of construction of onsite post construction stormwater practices or eligible for participation in an offsite stormwater control program when one or both of such programs are made available by the city and provided that the land development adheres to program policies. Each program shall be available when program policies are approved by city council and published by the city.
(Ord. No. 19-31, § 1, 3-29-2019)
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.
