§ 7-1-3 — Administration
Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 7-1-3
Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/e6db07ca-9461-4c66-afdb-e5c4adb8d17e
Sec. 7-1-3. - Administration.
Chapter 1 of the 2015 editions of International Building, Plumbing, Fuel Gas, Fire, Existing Building, Residential and Mechanical Codes, are hereby deleted and the following Chapter 1 is substituted thereof: CHAPTER 1 ADMINISTRATION 101 TITLE AND SCOPE 101.1 Title The provisions of the following Articles, Chapters and Sections shall constitute, be known, and be cited as the "Technical Codes of the City of Birmingham, 2015", hereinafter known as "this Code". 101.1.1 Purpose. The purpose of this Chapter is to provide for the administration and enforcement of the International Building, Fuel Gas, Mechanical, Fire, Plumbing, Residential, Existing Building Codes, and the National Electrical Codes. 101.2 Code Remedial. 101.2.1 General. This Code is hereby declared to be remedial, and shall be construed to secure the beneficial interests and purposes thereof, which are public safety, health, and general welfare through structural strength, stability, sanitation, adequate light and ventilation, and safety to life and property from fire, explosions and other hazards attributed to the built environment including alteration, repair, removal, demolition, use and occupancy of buildings, structures, or premises, and by regulating the installation and maintenance of all electrical, gas, elevator, fire protection, mechanical, and plumbing systems, which may be referred to as service systems. 101.2.2 Quality Control. Quality control of materials and workmanship is not within the purview of this Code except as it relates to the purposes stated herein. 101.2.3 Permitting and Inspection. The inspection or permitting of any building, system or plan by any jurisdiction, under the requirements of this Code, shall not be construed in any court as a warranty of the physical condition of such building, system or plan or their adequacy. No jurisdiction nor any employee thereof shall be liable in tort for damages for any defect or hazardous or illegal condition or inadequacy in such building, system or plan, nor for any failure of any component of such, which may occur subsequent to such inspection or permitting. 101.3 Scope. 101.3.1 Federal and State Authority. The provisions of this Code shall not be held to deprive any Federal or State agency, or any applicable governing authority having jurisdiction, of any power or authority which it had on the effective date of the adoption of this Code or of any remedy then existing for the enforcement of its orders, nor shall it deprive any individual or corporation of its legal rights as provided by law. 101.3.2 Appendices. To be enforceable, the appendices included in this Code must be referenced in the Code text or specifically included in Articles II through VI herein. 101.3.3 Referenced Standards. Standards referenced of this Code shall be considered an integral part of the Code without separate adoption. If specific portions of a standard are denoted by Code text, only those portions of the standard shall be enforced. Where Code provisions conflict with a standard the Code provisions shall be enforced. Permissive and advisory provisions in a standard shall not be construed as mandatory. 101.3.4 Maintenance. All buildings, structures, electrical, gas, fire protection, elevator, escalator, mechanical and plumbing systems, both existing and new, and all parts thereof, shall be maintained in a safe and sanitary condition. All devices or safeguards which are required by this Code when constructed, altered, or repaired, shall be maintained in good working order. The owner, or his designated agent, shall be responsible for the maintenance of buildings, structures, fire protection, elevator, escalator, electrical, gas, mechanical and plumbing systems. Inspections of existing buildings, by the Fire Official for maintenance, are conducted according to the NFPA 101 Life Safety Code, 2015 edition, and the 2015 IFC but any issues requiring construction, permitting & plans review will be governed by the ICC. AMENDED: Section 621.2 IFGC 2015: One or more unvented room heaters shall not be used as the sole source of comfort heating in a dwelling unit. 101.3.5 Plumbing Installation or Maintenance by Home Owner. Nothing in this Code shall prevent any owner of single family home from installing or maintaining plumbing within his own property boundaries, provided such plumbing work is done by himself and is used exclusively by him and his family and, also, provided that such plumbing work does not necessitate repair, alteration or direct connection to soil, waste, or drain lines on the outlet side of a trap. Such privilege does not convey the right to violate any of the provisions of this Code, or the terms of any state statute or any other applicable ordinance of the City of Birmingham, nor is it to be construed as exempting any such property owner from obtaining a permit with the applicable inspections and paying the required fees therefore. 101.3.6 Conflict of codes and standards. The International Codes shall be the construction codes with sections herein listed from the NFPA 101 - Life Safety Code, 2015 ed., being used in conjunction with the ICC family of codes. a) Any building or portion thereof used for less than 24 hours per day where occupants (regardless of age) requiring care, maintenance, and supervision by other than their relatives shall be defined as a Day Care Occupancy. Day-care occupancy provisions of Life Safety 2015, Chapters 16 and 17, shall apply for all new and existing occupancies. Location and construction type limitation requirements for Day-care occupancies, shall meet the appropriate regulations as set forth by the 2015 International Building Code. Those classifications listed in the 2015 International Building Code that are not addressed in the 2015 Life Safety Code will also be added as Sub-classifications. • Exception: This would not include occupancies that are a part of the health care classification or places of worship during religious functions. b) Both the International Codes and NFPA 101 - Life Safety Code requirements of Chapters 14 & 15, shall be enforced for new and existing Educational Occupancies. Where discrepancies occur between the codes, the most restrictive shall apply. Those sections of NFPA 101 - Life Safety Code, 2015 Edition that are also adopted by this Code shall be used by the Fire Official as maintenance requirements for the Inspection of Existing Buildings only unless it is deemed necessary by both the Fire and Building Officials to use as an applied code for construction. 101.4 Building Official. The Director of the Department of Planning, Engineering and Permits shall be designated as the Building Official, and shall be appointed by the Mayor of the City of Birmingham and shall have all of the authority and carry out all of the duties of the Building Official under this Code. 101.4.1 Deputy. The Building Official may designate as his deputy an employee in the Department of Planning, Engineering and Permits, who may be assigned by the Director the duty of enforcing this Code and other such duties as the Building Official may delegate, and who shall, during the absence or disability of the Building Official, exercise all the powers of the Building Official. 101.4.2 Inspector Qualifications. The Building Official, with the approval of the Director of the Department of Planning, Engineering and Permits, may appoint or hire such number of officers, inspectors, assistants and other employees as shall be authorized from time to time subject to the rules and regulations of the Personnel Board of Jefferson County, Alabama. A person shall not be appointed or hired as Inspector who has not had at least 3 years' experience as a building inspector, engineer, architect, or as a superintendent, foreman or competent mechanic in charge of construction. 101.4.3 Restrictions on Employees. An officer or employee connected with the Department of Planning, Engineering and Permits except one whose only connection is as a member of the Construction Board of Adjustment and Appeals established by this Code, shall not be financially interested in the furnishing of labor, material, or appliances for the construction, alteration, or maintenance of a building, structure, service, system, or in the making of plans or of specifications thereof, unless he is the owner of such. This officer or employee shall not engage in any other work which is inconsistent with his duties or conflict with the interests of the Department of Planning, Engineering and Permits, or such other department which may be assigned by ordinance of the City Council the duty of enforcing this Code. Any secondary employment shall be approved by the Appointing Authority. 101.4.4 Records. The Building Official shall keep, or cause to be kept, a record of the business of the Department of Planning, Engineering and Permits, or such other department or division of a department which may be assigned by ordinance of the City Council the duty of enforcing this Code. The records of such department or division shall be open to public inspection as permitted by law. 101.4.5 Liability. Any officer or employee, or member of the Board of Adjustments and Appeals, charged with the enforcement of this Code, acting for the applicable governing authority in the discharge of his duties, shall not thereby render himself personally liable, and is hereby relieved from all personal liability, for any damage that may accrue to persons or property as a result of any act required or permitted in the discharge of his duties. Any suit brought against any officer or employee or member because of such act performed by him in the enforcement of any provision of this Code shall be indemnified and have representation provided on their behalf as provided be section 2-4-11 of the General City Code of Birmingham, 1980. This Code shall not be construed as imposing upon the city any liability or responsibility for damages to any person or property caused by any defect in any electrical installation or equipment mentioned herein or by installation thereof, nor shall the City of Birmingham or any officer, inspector, assistant or employee thereof, be held as assuming any such liability or responsibility by reason of the inspection authorized hereunder or the certificate of approval issued the inspector. 101.4.6 Reports. The Building Official shall submit annually a report covering the work of the Department of Planning, Engineering and Permits, or such other department or division of a department which may be assigned by ordinance of the City Council the duty of enforcing this Code, during the preceding year. The Building Official may incorporate in said report a summary of the decisions of the Board of Adjustments and Appeals during said year. 101.5 Fire Official. The Fire Chief of the Birmingham Fire and Rescue Service Department or his designee shall be known as the Fire Official and shall have all of the authority and carry out all of the duties of the Fire Official under this Code. 101.5.1 Fire Prevention Division. There is hereby established a division within the Fire and Rescue Service Department to be known as the Fire Prevention Division. This division shall operate under the direction of the Fire Chief, through the designated Fire Marshal, and shall assist in the performance of the duties as Fire Official. The function of this Division shall be the implementation, administration and enforcement of the provisions of this Code. This division may also perform other duties as assigned by the Fire Chief. 101.5.2 Inspector Qualifications. The Fire Marshal, with the approval of the Fire Chief of the Birmingham Fire and Rescue Service Department may appoint or hire such number of officers, inspectors, assistants and other employees as shall be authorized from time to time subject to the rules and regulations of the Personnel Board of Jefferson County, Alabama. 101.5.3 Records. The Fire Code Official shall keep official records as required by the following subsections. Such official records shall be retained for not less than five years or for as long as the structure or activity to which such records relate remains in existence, unless otherwise provided by other regulations. 101.6 Existing Buildings. 101.6.1 General. Alterations, repairs or rehabilitation work may be made to any existing structure, building, fire protection, elevator, escalator, electrical, gas, mechanical or plumbing system without requiring the building, elevator, escalator, structure, plumbing, electrical, mechanical, fire protection or gas system to comply with all the requirements of this Code provided that the alteration, repair or rehabilitation work conforms to the requirements of this Code for new construction. The Building Official and Fire Official shall determine the extent to which the existing system shall be made to conform to the requirements of this Code for new construction. Existing buildings, built before the adoption of this Code, that are being remodeled or changed to a new use shall be exempt from the seismic requirements of the 2015 International Building Code. Permits and inspections for reroofing or recovering roofs of Use Group R-3 dwellings are not required. All reroofing work shall comply with Section R907 of the IRC. 101.6.2 Change of Occupancy. If the occupancy classification of any existing building or structure is changed, the building, fire protection, elevator, escalator, electrical, gas, mechanical and plumbing systems shall be made to conform to the intent of this Code as required by the Building and Fire Officials. 101.6.3 Existing Conditions. Existing conditions not in strict compliance with this Code may be permitted to continue when, in the opinion of the Building and Fire Officials, these conditions do not constitute a distinct hazard to life or property. 101.7 Special Historic Buildings. The provisions of this Code relating to the construction alteration, repair, enlargement, restoration, relocation or moving of buildings or structures shall not be mandatory for existing buildings or structures identified and classified by the state or the City of Birmingham as Historic Buildings when such buildings or structures are judged by the Building and Fire Officials to be safe and in the public interest of health, safety and welfare regarding any proposed construction, alteration, repair, enlargement, restoration, relocation. The applicant must submit complete architectural and engineering plans and specifications bearing the seal of a registered Professional Engineer or Architect in the State of Alabama. 102 POWERS AND DUTIES OF THE BUILDING, CODE, AND FIRE OFFICIALS 102.1 General. The Building Official, Code Official, and Fire Official is hereby authorized and directed to enforce the respective provisions of this Code. The Building, Code, or Fire Official is further authorized to render interpretations of the respective portion of this Code over which they have authority. 102.2 Right of Entry. 102.2.1 Whenever necessary to make an inspection to enforce any of the provisions of this Code, or whenever the Building, Code, or Fire Official has reasonable cause to believe that there exists in any building or upon any premises any condition or code violation which makes such building, structure, premises, elevator, escalator, electrical, gas, mechanical, fire protection, life safety or plumbing systems unsafe, dangerous or hazardous, the Building, Code, or Fire Official may enter such building, structure or premises at all reasonable times to inspect the same or to perform any duty imposed upon the Building, Code, or Fire Official by this Code, provided that if such building or premises is occupied, he shall first present proper credentials and request entry. If such building, structure, or premises is unoccupied, he shall first make a reasonable effort to locate the owner or other persons having charge or control of such and request entry. If entry is refused, the Building, Code, or Fire Official shall have recourse to every remedy provided by law to secure entry. 102.2.2 When the Building, Code, or Fire Official shall have first obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having charge, care or control of any building, structure, or premises shall fail or neglect, after proper request is made as herein provided, to promptly permit entry therein by the Building or Fire Official for the purpose of inspection and examination pursuant to this Code. 102.3 Stop Work Orders. Upon notice from the Building, Code, or Fire Official, work on any building, structure, elevator, escalator, electrical, gas, fire protection, mechanical or plumbing system that is being done contrary to the provisions of this Code or in a dangerous or unsafe manner, shall immediately cease. Such notice shall be in writing and shall be given to the owner of the property, or to his agent, or to the person doing the work, and shall state the conditions under which work may be resumed. Where an emergency exists, the Building, Code, or Fire Official shall not be required to give a written notice prior to stopping the work. 102.4 Revocation of Permits. 102.4.1 Misrepresentation of Application. The Building, Code, or Fire Official may revoke a permit or approval, issued under the provisions of this Code, where there has been any false statement or misrepresentation as to a material fact in the application or plans on which the permit or approval was based. 102.4.2 Violation of Code Provisions. The Building, Code, or Fire Official may revoke a permit upon determination by the Building, Code, or Fire Official that the construction, erection, alteration, repair, moving, demolition, installation or replacement of the building, fire protection, elevator, escalator, structure, electrical, gas, mechanical or plumbing systems for which the permit was issued is in violation of, or not in conformity with, the provisions of this Code. 102.5 Unsafe Buildings, Systems and Public Nuisances. 102.5.1 Unsafe Buildings and Systems. All buildings, systems, structures, and premises, which are unsafe, unsanitary, which are not provided with adequate egress, or which in relation to existing use constitute a hazard to safety or health by reason of inadequate maintenance, dilapidation, obsolescence, or abandonment, but are not unsafe to the extent that they constitute a public nuisance, are considered unsafe buildings. All such unsafe buildings, systems, structures and premises are hereby declared illegal and shall be abated by repair and rehabilitation or by demolition in accordance with the following procedure: 102.5.1.1 Whenever the Building, Code, or Fire Official shall find any building or structure or portion thereof to be unsafe, as defined in this section, he shall, in accordance with the established procedure for legal notices, give the assessed owner, agent, person having an interest in or person in control of such building or structure written notice stating the defects thereof. This notice shall require the owner within a stated time either to complete specified repairs or improvements or to demolish and remove the building or structure or portion thereof. 102.5.1.2 If necessary, such notice shall also require the building, structure, or portion thereof to be vacated forthwith and not reoccupied until the specified repair and improvements are completed, inspected, and approved by the Building, Code, and Fire Official. The Building, Code, or Fire Official shall cause to be posted at each entrance to such building a notice: "THIS BUILDING IS UNSAFE AND ITS USE OR OCCUPANCY HAS BEEN PROHIBITED BY THE BUILDING OFFICIAL." Such notice shall remain posted until the required repairs are made or demolition is completed. It shall be unlawful for any person, firm, or corporation, their agents, servants, or employees to remove such notice without written permission of the Building, Code, or Fire Official, or for any person to enter the building except for the purpose of making the required repairs or of demolishing same. 102.5.1.3 If such owner(s), agent, or person in control shall fail, neglect, or refuse to comply with notice to repair, rehabilitate, or to demolish and remove said building or structure or portion thereof, the Building, Code, or Fire Official shall cause such building or structure or portion hereof, if not heretofore vacated, to be vacated and remain vacated until repaired or demolished; provided, however, if thereafter such building or structure or portion thereof becomes unsafe to the extent that it is a public nuisance, the Building Official shall proceed as provided in section 102.5.2 hereof. 102.5.1.4 The Building and Fire Officials may make, periodically, a thorough re-inspection of the installation of all electrical wiring, electric devices, and electric equipment now installed or that may hereafter be installed within the city; and when the installation of any wiring devices or equipment is found to be in a dangerous or unsafe condition, the person owning, using, or operating the same shall be notified in writing and shall make the necessary repairs or changes required to place such wiring, devices, or equipment in safe condition and have such work completed within the period specified by the Building or Fire Official. The Building Official or Fire Official is hereby empowered to disconnect or order the discontinuance of electrical service to such wiring devices, or equipment so found to be defectively installed until the installation of such wiring, devices, or equipment has been made safe as directed by him. 102.5.1.5 All plumbing, electrical, gas and mechanical installations, regardless of type, that are unsanitary or that constitute a hazard to human life, health, or welfare are hereby declared illegal and shall be abated by repair and rehabilitation or by demolition, and such violations shall be brought to the attention of the owner or agent thereof, with written instructions to have same corrected within 10 days after receipt of such notice in writing and said owner or agent shall be held responsible for such violations. If after any water meter is set, it is determined that there is danger of backflow or back-siphonage into the building water distribution system, water service or water main from any connection, fittings, fixture, device, appurtenance or appliance whereby the water in the water supply or distribution piping could become contaminated or the water could otherwise be rendered a non-potable supply of water, the Building Official may, upon written notice, require the water supplier to disconnect the premises upon which such back-flow or back-siphon condition exists from the water main until such condition is remedied to the satisfaction of the Building Official. The Building Official shall have the authority to prevent the setting of a meter or the connection of a water service to any building water distribution system when upon inspection of the premises, conditions are found to exist which are contrary to the provisions of this Code as it pertains to the water supply and/or water distribution system of a building or premises until such condition or conditions are remedied to the satisfaction of said Building Official. 102.5.1.6 The owner, agent or person in control shall have the right, except in cases of emergency, to appeal from the decision of the Building, Code, or Fire Official, as provided hereinafter, and to appear before the Construction Board of Adjustments and Appeals at a specified time and place to show cause why he should not comply with said notice. 102.5.1.7 The decision of the Building, Code, or Fire Official shall be final, and supersede any other pending action, in cases of emergency which, in his opinion, involve imminent danger of structural collapse endangering adjoining property, the public right-of-way or to human life or health. He shall promptly cause such building, structure, or portion thereof to be made safe, secured, or removed. For this purpose he may at once enter such structure, with such assistance and at such cost as he may deem necessary. He may vacate adjacent structures and protect the public by appropriate fence or such other means as may be necessary, and for this purpose may close a public or private way. 102.5.1.8 The costs of such emergency action shall be fixed by the City Council and such costs shall be assessed against the person or persons creating or maintaining such dangerous condition. Costs shall be fixed and assessed as provided in Sections 102.5.2.4 through 102.5.2.6 herein, inclusive. 102.5.2 Public Nuisances. 102.5.2.1 Whenever the Building Official shall find that any building, structure, part of building or structure, party wall, foundation or premises situated in the City is unsafe to the extent that it is a public nuisance, he shall give the person or persons, firm, association, or corporation last assessing the property for state taxes and all mortgagees of record, by certified or registered mail to the address on file in the tax collector's office, notice to remedy the unsafe or dangerous condition of such building, structure, or premises, or to demolish the same, within a reasonable time set out in said notice, which time shall be not less than thirty (30) days or suffer such building or structure to be demolished by the City and the cost thereof assessed against the property. The mailing of such certified or registered mail notice, properly addressed and postage prepaid, shall constitute notice as required herein. Notice of such order, or a copy thereof, shall, within three (3) working days of the date of mailing, also be posted at or within three (3) feet of an entrance to the building or structure provided that if there is no entrance, the notice may be posted at any location upon the building or structure. 102.5.2.2 Within the time specified in such notice, but not more than thirty (30) days from the date notice is given, any person, firm or corporation having an interest in such building or structure may file a written request for a hearing before the City Council, together with his objections to the finding by the Building Official that such building or structure is unsafe to the extent of becoming a public nuisance. The filing of such request shall hold in abeyance any action on the finding of the Building Official until determination thereon is made by the Council. Upon holding such hearing, which hearing shall be held not less than five (5) nor more than thirty (30) days after such request, or in the event no hearing is timely requested, the Council, after the expiration of thirty (30) days from the date notice is given, shall determine whether or not such building or structure is unsafe to the extent that it is a public nuisance. In the event that it is determined by the Council that such building or structure is unsafe to the extent that it is a public nuisance, the Council shall order such building or structure to be demolished. Such demolition may be accomplished by the City by the use of its own forces, or it may provide by contract for such demolition. The City shall have authority to sell or otherwise dispose of salvaged materials resulting from such demolition. Exception: When emergency action is declared after a thirty (30) day notice has been mailed and a written request for a hearing is received, the hearing before the City Council may be held immediately. 102.5.2.3 Any person aggrieved by the decision of the Council at such hearing may, within ten (10) days thereafter, appeal to the Circuit Court upon filing with the clerk of said court notice of appeal and bond for security of costs in the form and amount to be approved by the Circuit Clerk. The City Clerk shall, upon receiving notice of appeal, file with the Clerk of the Court a copy of the findings and determination of the Council proceedings. 102.5.2.4 Upon demolition of such building or structure, the Building Official shall make report to the Council of the cost thereof, and the Council shall adopt a resolution fixing the costs which it finds were reasonably incurred in such demolition and assessing the same against the property; provided, however, the proceeds of any monies received from the sale of salvaged materials from said building or structure shall be used or applied against the cost of said demolition; and provided, further, that any person, firm, or corporation having an interest in said property may be heard at such meetings to any objection he may have to the fixing of such costs or the amounts thereof. The City Clerk shall give notice of the meeting at which the fixing of such costs are to be considered by first-class mail to all entities having an interest in the property whose address and interest is determined from the tax collector's records on the property or is otherwise known to the clerk. The fixing of said costs by the Council shall constitute a special assessment against the lot or lots, parcel or parcels of land upon which the building or structure was located, and, thus made and confirmed, shall constitute a lien on said property for the amount of such assessment. Said lien shall be superior to all other liens on said property except liens for taxes, and shall continue in force until paid. A certified copy of such resolution shall also be filed in the Office of Judge of Probate of Jefferson County, Alabama. 102.5.2.5 The City shall have the power to assess the costs authorized herein against any lot or lots, parcel or parcels of land purchased by the State of Alabama at any sale for the nonpayment of taxes, and where any such assessment is made against such lot or lots, parcel or parcels of land, a subsequent redemption thereof by any person authorized to redeem, or sale thereof by the state, shall not operate to discharge, or in any manner affect the lien or such city for such assessment, but any redemptioner or purchaser at any sale by the state or any lot or lots, parcel or parcels of land upon which an assessment has been levied, whether prior to or subsequent to a sale to the state for the nonpayment of taxes, shall take the same subject to such assessment. Such assessment shall then be added to the tax bill of the property, collected as tax, and remitted to the city. 102.5.2.6 Payment of such assessment shall be made in the manner and as provided for the payment of municipal improvement assessments in Section 11-48-48, Code of Alabama, 1975, as now amended, and upon the property owner's failure to pay such assessment, as provided in the provisions of Sections 11-48-49 through 11-48-60, inclusive, Code of Alabama, 1975. 102.6 Requirements Not Covered By Code. Any requirements necessary for the strength, stability or proper operation of an existing or proposed building, structure, elevator, escalator, electrical, gas, fire protection, mechanical or plumbing system, or for the public safety, health and general welfare, not specifically covered by this Code, shall be determined by the Building, Code, and Fire Officials. 102.7 Alternate Materials and Methods. The provisions of this Code are not intended to prevent the use of any material or method of construction not specifically prescribed by them, provided any such alternate has been reviewed by the Building and Fire Officials. The Building, Code, and Fire Officials shall approve any such alternate, provided the Building and Fire Officials find that the alternate is at least the equivalent of that prescribed in this Code in quality, strength, effectiveness, fire resistance, durability and safety for the purpose intended. The Building, Code, or Fire Official shall require that sufficient evidence or proof be submitted to substantiate any claim made regarding the alternate. 102.7.1 Approved Materials, Apparatus, Equipment and Methods. All materials, apparatus, fittings, appliances, devices, appurtenances or fire rated assemblies, shall be listed by testing agencies that have been accredited by the International Accreditation Service, Inc. (IAS), as stated in the ICC-ES Rules of Procedure of the International Code Council (ICC). 103 CONSTRUCTION PERMITS A person, firm or corporation shall not erect, construct, enlarge, install, alter, repair, move, improve, remove, convert or demolish any building, structure, elevator, escalator, electrical, gas, fire protection, mechanical or plumbing system in the City of Birmingham, or cause the same to be done, without first obtaining a permit for such from the Building and/or Fire Official. 103.1 Application for permit. 103.1.1 When Required. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any fire protection, electrical, elevator, escalator, gas, mechanical or plumbing system, the installation of which is regulated by this Code, or to cause any such work to be done, shall first make application to the Building and/or Fire Official and obtain the required permit for the work. Exception: Permits shall not be required for the following work except as noted herein: 1. Any portable heating, ventilation, evaporator coil or cooling equipment; 2. Any steam, hot or chilled water piping within any heating or cooling equipment regulated by this Code; 3. Any self-contained refrigeration system containing 10 lb. or less of refrigerant and actuated be motors of 1 horsepower or less; 4. Repair or replacement of components with similar equipment which does not enlarge, move, convert, or replace the mechanical system and which does not create an unsafe condition; 5. Repair of a gas-fired furnace excluding Vent and Gas piping. Vent and Gas piping shall require a Gas permit; 6. Repair or replacement of condensing unit; 7. Repair or replacement of no more than 50% which shall not to exceed 20 feet, of water service; 8. Accessory structures for one and two family dwellings less than 150 SF when approved by the Planning Division of the Department of Planning, Engineering and Permits; 9. Repair or replacement of roof shingles/roof covering on R-3, single family dwellings; 10. Retaining walls less than 3 feet from the top of the footing; 11. Painting, papering, carpeting, cabinets, counter tops and similar finish work in single family residences; 12. Building permits for swimming pools; electrical and plumbing permits and associated inspections are required; 13. Playground equipment. 103.1.2 Work Authorized. A building, fire protection, electrical, elevator, escalator, gas, mechanical or plumbing permit shall carry with it the right to construct or install the work, provided the same are shown on the drawings and set forth in the specifications filed with the application for the permit. Where these are not shown on the drawings and covered by the specifications submitted with the application, separate permits shall be required. 103.1.3 Minor Repairs. Ordinary minor repairs may be made with the approval of the Building, Code, and Fire Official without a permit, provided that such repairs shall not violate any of the provisions of this Code. 103.1.4 Information Required. Each application for a new construction building permit, with the required fee, shall be filed with the Building Official on a form furnished for that purpose, and shall contain a general description of the proposed work and its location. The application shall be signed by the owner, or his authorized agent. The building permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site, lot, if any, not covered by the building or structure, and shall contain such other information as may be required by the Building Official. 103.1.5 Time Limitations. An application for a permit for any proposed work shall be deemed to have been abandoned 6 months after the date of filing for the permit unless a permit has been issued within the 6 months period. One or more extensions of time for periods of not more than 90 days each may be allowed by the Building Official for the application, provided the request for extension is in writing and justifiable cause for such delay is demonstrated. See Section 103.6.2 for Special Permits. 103.2 Drawings and Specifications. 103.2.1 Requirements. When required by the Building Official, or Fire Official, three or more copies of specifications, and of drawings drawn to scale with sufficient clarity and detail to indicate the nature and character of the work, shall accompany the application for a permit. Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with this Code. Such information shall be specific; this Code shall not be cited as a whole or in part, nor shall the term "legal" or its equivalent be used as a substitute for specific information. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design. Mechanical permit applications may be required to have drawings or Heat Loss and Gain forms (ACCA Manual J or ACCA Manual N) attached. 103.2.2 Additional Data. The Building or Fire Official may require details, computations, stress diagrams, and other data necessary to describe the construction or installation and the basis of calculations. 103.2.3 Design Professional. All drawings, specifications, and accompanying data shall bear the name and address of the designer. In the case of buildings or structures of Group A and E Occupancy, and all buildings or structures or portions thereof more than 2500 square feet, except single-family dwellings, such designer shall be an Architect or Engineer legally registered under the laws of the State of Alabama regulating the practice of architecture or engineering and shall affix his official seal to said drawings, specifications and accompanying data. All Gas, Mechanical, Plumbing, Fire Protection System drawings are required to be prepared by a Registered Engineer in the State of Alabama. 103.2.3.1 Design professional in responsible charge. 103.2.3.2 General. When it is required that documents be prepared by a registered design professional, the building official shall be authorized to require the owner to engage and designate on the building permit application registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner shall designate a substitute registered design professional in responsible charge who shall perform the duties required of the original registered design professional in responsible charge. The building official shall be notified in writing by the owner if the registered design professional in responsible charge is changed or is unable to continue to perform the duties. The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred items, for compatibility with the design of the building. Where structural observation is required by Section 170, the inspection program shall name the individual or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur (see also duties specified in Section 1704). 103.2.3.3 Deferred submittals. For the purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the building official within a specified period. Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official. Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. 103.2.3.4 Fire Protection Shop Drawings. Shop drawings for the fire protection system(s) shall be submitted to indicate conformance with this Code and the construction documents and shall be approved prior to the start of system installation. Shop drawings shall contain all information as required by the referenced installation standards in Chapter 9 of NFPA 2015. 103.2.4 Structural and Fire Resistance Integrity. Plans for all buildings shall indicate how required structural and fire resistive integrity will be maintained where a penetration of a required fire resistant wall, floor or partition will be made for electrical, gas, mechanical, plumbing and communication conduits, pipes and systems and also indicate in sufficient detail how the fire integrity will be maintained where required fire resistant floors intersect the exterior walls. 103.2.5 Site Drawings. Drawings shall show the location of the proposed building or structure and of every existing building or structure on the site or lot. The Building or Fire Official may require a boundary line survey prepared by a qualified surveyor. Site drawings shall include fire access roadways, fire hydrants and obstructions to proposed buildings. 103.3 Examination of Documents. 103.3.1 Plan Review. The Building and Fire Official shall examine or cause to be examined each application for a permit and the accompanying documents, consisting of drawings, specifications, computations and additional data, and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of this Code and all other pertinent laws or ordinances, such as Zoning and Soil Erosion and Sediment Control ordinances. The Building and Fire Official shall also examine or cause to be examined each set of drawings, specifications, computations and additional data of all components of fire protection systems, and the Building and Fire Official shall ascertain by such examinations whether the construction and/or installation of all components of the fire protection systems are in compliance with this Code and all other pertinent laws or ordinances. 103.4 Issuing Permits. 103.4.1 Action on Application. If the Building Official and Fire Officials are satisfied that the work described in an application for permit and the drawings filed therewith conform with the requirements of this Code and other pertinent laws and ordinances, they shall issue a permit therefore to the applicant; provided that no permit shall be issued for renovation, repair or construction by a contractor or superintendent of any commercial building costing $50,000 or more, and renovation, repair or construction of residential construction costing $10,000 or more, and both covered by Chapter 8, Title 34, Code of Alabama of 1975, or as same may be amended, unless such contractor shall be duly licensed under the provisions of said chapter. 103.4.2 Refusal To Issue Permit. If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of this Code or other pertinent laws or ordinances, the Building and Fire Officials shall not issue a permit, but shall return the contract documents to the applicant with his refusal to issue such permit. The Building and Fire Officials may withhold the further issuance of permits to the holder of any permit previously issued under this Code if the work or inspections as required thereunder have not been completed within a reasonable time. Such refusal shall, when requested, be in writing and shall contain the reason for refusal. 103.4.3 Partial Permits. When application for permit to erect or enlarge a building has been filed and pending issuance of such permit, the Building Official may, at his discretion, issue a special permit for the foundations, framing or other portions of such building. The holder of such a special permit shall proceed at his own risk and without assurance that a permit for remainder of the structure will be granted. 103.4.4 Public Right Of Way. A permit shall not be given by the Building Official for the construction of any building, or for the alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies, or other appendages or projections fronting on any street, alley or public lane, or for the placing on any lot or premises of any building or structure removed from another lot or premises, unless the applicant has made application at the office of the Department of Planning, Engineering and Permits for the lines of the public street on which he proposes to build, erect or locate said building; and it shall be the duty of the City Engineer to see that the street lines are not encroached upon except as provided for in Chapter 32 of Article II, IBC 2015. 103.4.5 Excavations. A permit is required to be taken out with the Department of Planning, Engineering and Permits for each excavation in a public street or alley before the work is commenced. It shall be unlawful for any person, firm or corporation to do any tunneling under any public street or alley. All excavations, back-fills and repairs in public streets or alleys shall be done in accordance with applicable ordinances of the City of Birmingham as amended from time to time and filed in the office of the Department of Planning, Engineering and Permits, the enforcement of which rests with the Department of Planning, Engineering and Permits. 103.4.5.1 Boring. Boring for utility piping requires documentation of boring depth. If water service is done by boring method, documentation is required for approval. 103.4.6 Public Protection Requirement. It is hereby required that for every excavation made on public property, proper safeguards shall be provided against injury to the public; barricades shall be provided at five (5) feet intervals, and such barricades shall completely encircle all open excavations or trenches. All barricades, as required by this Code, shall have at least one (1) sign placed thereon in a conspicuous manner, indicating the name of the person, firm or corporation causing such excavation. When approved by the Department of Planning, Engineering and Permits, steel plates of sufficient strength may be used to cover the excavation to prevent blocking streets. 103.5 Contractors License. It shall be the duty of every contractor or builder, who shall make contracts for the erection, construction or repair of buildings for which a permit is required in the City, and every contractor or builder making such contracts and subletting the same, or any part thereof, to pay license fees as provided by ordinance. 103.6 Conditions of the Permit. 103.6.1 Permit Intent. A permit issued shall be construed to be a license to proceed with the work and shall not be construed as authority to violate, cancel, alter, or set aside any of the provisions of this Code, nor shall such issuance of a permit prevent the Building or Fire Official from thereafter requiring a correction of errors in plans or in construction, or of violations of this Code. Any permit issued shall become invalid unless the work authorized by it shall have been commenced within ninety days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of ninety days after the time work is commenced; provided that for cause, one or more extensions of time, for periods not exceeding ninety days each, may be allowed in writing by the Building Official. 103.6.2 Special Permits. Whenever a building has been condemned as a public nuisance by resolution of the City Council, no building or moving permit shall be issued nor shall any building permit be valid unless approved by resolution of the City Council. Authorized repair permits for buildings condemned by the City Council or the Building Official must be obtained within seven (7) days of approval and shall become invalid unless the structure is secured and weeds and trash are removed from the premises within ten (10) days of permit issuance and substantial repair is commenced within 30 days of permit issuance. These permits shall also become invalid if work is abandoned for any thirty (30) day period. 103.6.3 Plans. When the Building or Fire Official issues a permit, he shall endorse, in writing, or stamp, three sets of plans as official drawings. Two sets of drawings so stamped shall be retained by the Building and Fire Officials the third set which shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the Building and Fire Official or their authorized representative at all times. 104 FEES 104.1 Prescribed Fees. A permit shall not be issued until the fees prescribed in this Code have been paid, or other arrangements have been made. Nor shall an amendment to a permit be released until payment of the additional fee, if any, due to an increase in the estimated cost of the building, elevator, escalator, structure, or the fire protection, electrical, plumbing, mechanical or gas systems, has been arranged. 104.2 Work Commencing Before Permit Issuance. Where any work on a building, structure, elevator, escalator, or the fire protection, electrical, plumbing, mechanical or gas systems is commenced before obtaining the necessary permits, the fees herein specified shall be doubled, but the payment of such double fee shall not relieve any person from fully complying with the requirements of this Code in the execution of the work nor of any other penalties prescribed herein. The Building Official may withhold the issuance of further permits to any person, firm, or corporation until all permits for work previously started by them have been obtained. Repeat violations within any 12-month period shall result in the double fee plus fifty dollars ($50.00) for each such additional violation. 104.3 Accounting. The Building Official shall keep a permanent and accurate accounting of all such permit fees and other monies collected, the names of all persons upon whose account the same was paid, along with the date and amount thereof. 104.4 Schedule of Permit Fees. On all buildings, structures, elevators, escalators, or the fire protection, electrical, plumbing, mechanical and gas systems, or alterations or for any operational/use and special events requiring a permit, a fee for each permit shall be paid as required in section 104.1, in accordance with the schedule as established by Articles V and VII. 104.5 Building Permit Valuations. The applicant shall provide an estimated construction value at the time of application. If, in the opinion of the Building Official, the estimated cost of construction appears to be underestimated, the estimated costs for permit fee purposes shall be determined by the use of the most current applicable tables published by the ICC. Estimated cost shall include the total cost of all work such as plumbing, elevator, escalator, electrical, fire protection, mechanical, paving, landscaping, permanent systems, overhead and profit, engineering and architectural design fees, and be equivalent to the end cost of the project. Detailed estimates and copy of the original executed contract(s) may be required for review to validate the declared scope and/or value of the construction. Final building valuation shall be set by the Building Official. New Projects and Additions total project costs are paid by the general contractor. General contractors shall provide a list of subcontractors whose fees are included in the building permit value for new buildings and additions. Trades listed as covered under the general contractor will only incur a processing fee at time of their permit issuance. Alterations and Repairs require all trades to pay fees based on the value of their work. Permanent systems and permanent equipment require separate review and permitting. Grading work shall be permitted according to Title 4, Chapter 7 of the General Code of the City of Birmingham. 104.6 Fees, How Paid. All fees for permits and inspections required under this Code shall be paid in the Finance Department, First Floor - City Hall. 105 CONSTRUCTION PERMIT INSPECTIONS 105.1 Existing Building Inspections. Before issuing a permit the Building and Fire Officials may examine or cause to be examined any building, elevator, escalator, structure, or the fire protection, electrical, gas, mechanical or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, elevator, escalator, or the electrical, fire protection, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of this Code. 105.2 Manufacturers and Fabricators. When deemed necessary by the Building or Fire Official, they shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of this Code. Costs of such inspections shall be paid by the manufacturer. 105.3 Inspection Service. The Building or Fire Official may make, or cause to be made, the inspections required by this section. He may accept reports of inspectors of recognized inspection services provided that after investigation he is satisfied as to their qualifications and reliability. A certificate called for by any provision of this Code shall not be based on such reports unless the same are in writing and certified by a responsible officer of such service. 105.4 Inspections Prior To Issuance of Certificate of Occupancy or Completion. The Building and Fire Officials shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building or structure upon completion, prior to the issuance of the Certificate of Occupancy, as required in Section 106. Where any additional or extra inspection is required on any undertaking due to the failure of the permit holder to comply with the provisions of this Code, a "Special Inspection Permit" shall be obtained for each such inspection and there shall be an additional charge of $50.00 for each such permit and inspection. 105.5 Posting of Permit. Work requiring a permit shall not commence until the permit holder or his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the Building or Fire Official or their representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the Certificate of Occupancy or Completion is issued by the Building Official. The Fire operational/use permit shall be maintained on site permanently. 105.6 Required Inspections. It shall be the responsibility of the permit holder/contractor to give reasonable advance notice to the Building and Fire Officials when work is ready for test or inspection. Except in case of emergency this notice should be given 24 hours prior to the requested inspection unless otherwise specified. The Building and/or Fire Official, upon notification from the permit holder or his agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with this Code: 105.6.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job. 105.6.2 Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor. 105.6.3 Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in Section 1612.5 shall be submitted to the building official. 105.6.4 Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved. 105.6.5 Lath and gypsum board inspection. Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished. Exception: Gypsum board that is not part of a fire-resistance-rated assembly or a shear assembly. 105.6.6 Fire-resistant penetrations. Protection of joints and penetrations in fire-resistance-rated assemblies shall not be concealed from view until inspected and approved. 105.6.7 Other inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this Code and other laws that are enforced by the department of building safety. 105.6.8 Special inspections. For special inspections, see Section 1704 of the IBC. 105.6.9 Final inspection. The final inspection shall be made after all work required by the building permit is completed. 105.7. Fire Inspections. 105.7.1 Testing of Fire Protection systems and equipment. The Fire Official shall witness tests for all fire protection systems and equipment before a Certificate of Occupancy or Certificate of Completion is issued by the Building Official. The following lists the Fire Official inspections on fire protection systems: 105.7.1.1 Underground Fire Service (NFPA Certification required). • Open Trench Inspection of piping, thrust blocks and other approved methods of restraining fire mains. • Hydrostatic Test. • Flush Test (before connection to the aboveground Fire Sprinkler System). • Final (with Fire Alarm Final, if applicable). 105.7.1.2 Fire Sprinkler Systems (NFPA Certification required). • Above Ceiling inspection and Hydrostatic Test (open ceiling). • Bucket Test (13R). • Final (with Fire Alarm System if applicable). 105.7.1.3 Standpipe System (NFPA Certification required). • Hydrostatic Test. • Flush Test (with Fire Pump if applicable). • Final (with Fire Alarm System if applicable). 105.7.1.4 Fire Pumps (Certification required). • Hydrostatic and Flush Test of piping. • Functional Test (Pump Certification) Emergency Power Supply for Electric Pumps. • Final (with Fire Alarm System, if applicable). 105.7.1.5 Fire Alarm System (NFPA Certification required). • Acceptance Test (with other trades if applicable). • Re-certification (if an existing system is upgraded or re-installed). 105.7.1.6 Commercial Hood Fire Extinguishing System (Certification required). • Inspection (all components). • Functional Test. • Final (with Fire alarm if applicable). 105.7.1.7 Non-Water based Fire Suppression Systems (Certification required). • Inspection (all components). • Room Integrity Test. • Pneumatic Test. • Puff Test (flow). • Functional Test. • Final (with Fire alarm if applicable). 105.7.1.8 Above (AST) and Underground (UST) Tanks (Certification Required). • Inspection (ASME code stamp or UL mark verifying Factory testing). • Hydrostatic Test (soap test before tanks are placed in the ground). • Piping and Tank tightness test (UST tested before covering). • Final Inspection. 105.7.1.9 Final Certificate of Occupancy Inspection. • Required at the completion of the testing of all Fire Protection Systems and Equipment. • Required if no Fire Protection Systems are installed unless instructed otherwise by the Building Inspection. • Fire Extinguishers should be properly installed. • All Life Safety Features including egress should be completed. The following inspections require a completed contractor's certificate per NFPA Standards: Underground Fire Service Fire Sprinkler Systems Standpipe Systems Fire Alarm Systems Fire Suppression Systems 105.8 Electrical. Required electrical inspections shall consist of the following: 105.8.1 Underground Inspection. To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place. 105.8.2 Rough-In Inspection. To be made after the roof, framing, fireblocking and bracing is in place and prior to the installation of wall or ceiling membranes. When any part of a wiring installation is to be hidden from view by the permanent placement of parts of the building, the person installing the wiring shall notify the Building Official and such parts of the wiring installation shall not be concealed until they have been inspected and approved by the Building Official; provided, that on large installations where the concealment of parts of the wiring proceeds continuously, the person installing the wiring shall give the Building Official due notice and inspections shall be made periodically during the progress of work. 105.8.3 Low Voltage Wiring. Low voltage wiring, as described in the 2014 NEC will be exempt from having to be installed under and electrical permit by a licensed electrician. Proper business license is required for indicated work. Wiring shall be limited to Class II or less power supply as determined by the authority having jurisdiction. The Electrical inspector is responsible for conducting the inspection for all the electrical wiring for fire alarm system. The electrical inspector checks wiring to fire alarm panel and from panel to devices/appliances (this does not include testing for supervision). The Fire inspector is responsible for conducting an acceptance test (including supervision) of the fire alarm system. 105.8.3.1 Permit Required. A low voltage permit will be required to install the following types of wiring and systems: • Telecommunication • Sound • Data • Burglar Alarm • Power Limited Fire Alarm • Video/CATV • Lawn Sprinkler • Fiber Optics • Class II Controls • Energy Management Wire that is laid on the ceiling grid or supported by the ceiling grid hanger wire will not be approved and the inspector will not approve the installation of the ceiling tile. 105.8.3.2 Permit Cost. The minimum permit fee will be $50.00. Permit cost will be based on the cost of the job being installed and will be charged at a rate of $8.50 per $1,000 worth of installation cost. Fire Alarm systems that are included in the base cost of construction for new or remodeled buildings, and the Fire Alarm system that is shown on the approved building plans, will be exempt from paying the above fee. 105.8.4 Final Inspection. To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy. When the Building Official shall determine that work has been completed under a permit, but no final inspection has been requested or made, it shall be his duty to refuse to issue any permits to the master electrician for any work until said completed work has satisfactorily passed a final inspection. Regardless of any other provision of this Code, electrical work or equipment placed in operation and which are in use by the owner or occupant of the building or premises shall be deemed complete and ready for final inspection. If, upon final inspection, the installation is not found to be in full compliance with this Code, the Building Official shall at once notify the person installing the wiring, stating the defects which have been found to exist. 105.9 Plumbing. Required plumbing inspections shall consist of the following: 105.9.1. Underground Inspection. To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. 105.9.2. Rough-In Inspection. To be made after the roof, framing, fireblocking and bracing is in place and all soil, waste and vent piping is complete, and prior to this installation of wall or ceiling membranes. 105.9.3 Final Inspection. To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. 105.9.4 Responsibility of Master Plumber. It shall be the responsibility of the master plumber to notify the office of the Building Official within forty-eight hours after the completion of the job and before the plumbing system, alterations or additions are placed in service, that the work is ready for final inspection. When the Building Official shall determine that work has been completed under a permit, but no final inspection has been asked for or made, it shall be his duty to refuse to issue any permits to the master plumber for any work until said completed work has satisfactorily passed a final inspection. Regardless of any other provision of this Code, plumbing work or fixtures placed in operation and which are in use by the owner or an occupant of the building or premises shall be deemed complete and ready for final inspection. 105.9.5 Test of Drainage and Vent Systems. All the piping of the plumbing system shall be tested with water. After the plumbing fixtures have been set and their traps filled with water, the entire drainage system shall be submitted to final tests. The Building Official may require the removal of any clean-out to ascertain if the pressure has reached all parts of the system. 105.9.6 Methods of Testing Drainage and Vent Systems. (a) Water Test—The Water Test shall be applied to the drainage and vent system, either in its entirety or in sections. If applied to the entire system, all openings in the piping shall be tightly closed, except the highest opening, and the system filled with water to the point of overflow. If the system is tested in sections, each opening shall be tightly plugged except the highest openings of the section under test, and each section shall be filled with water, but no section shall be tested with less than a 10 foot head of water. In testing successive sections at least the upper 10 feet of the next proceeding section shall be tested so that no joint or pipe in the building (except the uppermost 10 feet of the system) shall have been submitted to a test of less than a 10 foot head of water. The water shall be kept in the system, or in the portion under test, for a least 15 minutes before inspection starts; the system shall then be tight at all points. Exception: Sewage ejectors need only meet the requirements of the final test. (b) Ball Test—All soil or waste pipes other than individual fixture drains 3" or larger shall be subjected to the "Ball Test." This test shall consist of passing through the pipe bore a wooden sewer ball of a diameter not smaller than ½" less than the diameter of the pipe under test. The ball shall pass freely, under the action of gravity, through the pipe under test. Water, no more than 5 gallons, may be used to assist in floating the ball through the piping, however, no other means of assistance shall be used. (c) Final Test—The final test of the completed drainage and vent system shall be visual and in sufficient detail to insure that the provisions of this Code have been complied with, provided, however, that for cause, the plumber may be required to subject the plumbing to a smoke or mint test as determined by the Building Official. Where the mint test is used, two ounces of oil of mint shall be introduced for each line or stack. 105.9.7 Test of Water-Supply System. Upon completion of a section, or of the entire water-supply system, it shall be tested and proved tight under a water pressure not less than the working pressure under which it is to be used. The water used for tests shall be obtained from a potable source of supply. Provisions allowed under Section 312.5 2015 IPC for testing purposes. 105.9.8 Test of Building Sewer. Shall be tested and accepted by Jefferson County Environmental Services before any final plumbing inspections are to be made. A letter of acceptance shall be received in the Department of Planning, Engineering and Permits addressed to the Chief Plumbing, Gas and Mechanical Inspector. 105.9.9 Test of Interior Leaders or Downspouts. Leaders or downspouts and branches within a building shall be tested by water in accordance with "Methods for Testing of Drainage and Vent Systems." 105.9.10. Test of Defective Plumbing. The drainage system of any building, where there is reason to believe that it has become defective, shall be subjected to test or inspection. 105.10. Mechanical. 105.10.1. Rough-In Inspection. To be made after the roof, framing, fire-blocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes. 105.10.2 Final Inspection. To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. 105.11 Gas. 105.11.1 Rough Piping Inspection. To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. 105.11.2 Final Piping Inspection. To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. 105.11.3 Intermediate Inspection. It shall be the responsibility of the Master Gas Fitter to notify the office of the Building Official within forty-eight hours after completion of the job and before the gas system, alterations or additions are placed in service, that the work is ready for intermediate inspection. It shall further be the responsibility of the Master Gas Fitter to see that the premises and the work are available and accessible to the Building Official or his representative for inspection. 105.11.4 Final Inspection. To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes, to insure compliance with all the requirements of this Code and to assure that the installation and construction of the gas system is in accordance with reviewed plans. It shall be the responsibility of a Master Gas Fitter to put all equipment in operation for final inspection after completion and call for final inspection of the job and within ten (10) days after approval of the intermediate inspection except in such cases where the unfinished work of other crafts prohibit proper operation of the equipment. Such cases shall be determined by the Building Official after request of inspection, but in no case will this relieve the Master Gas Fitter, Company, Firm, or Corporation of his or their responsibility to call for final inspection within ten (10) days. If final inspection is not requested within 10 days from approval of the intermediate inspection and final approval given, it shall be the responsibility of the Building Official to refuse to issue any permits to the Master Gas Fitter, Company, Firm, or Corporation for any additional work at any time it has been ascertained that the equipment has been placed in operation and final inspection has not been requested and final approval obtained. 105.11.5 Instrument Tests. Instrument tests, when required, shall insure that the flue gas temperature does not exceed 480 Degrees Fahrenheit above that of the air temperature surrounding the appliance. The concentration of CO-2 does not exceed 9%; or the concentration of CO-02 does not exceed 0.04%, and the concentration and oxygen is not less than 4% and not more than 10%. This test shall be applicable to conversion burner installations, barometric damper installations, power burner installations, and at any time, when, after test by the Building Official, the equipment is found not to comply with the above requirements. 105.11.6 Test of a Gas Piping System. All the piping of the gas system to the outlet manual shut-off valve required by Article IV or quick-disconnect device when provided shall be tested with air or inert gas in accordance with Article IV. 105.11.7 Test of Defective Gas Systems. The gas system of any building, where there is reason to believe that it has become defective, shall be subjected to test and/or inspection. 105.11.8 Gas Vent Inspection. Before approval of the roughing-in-inspection, required in this Code, may be given, all gas vent piping shall be in place, joints properly sealed, adequately supported and clear of all combustible material in accordance with other sections of this Code. Where it is necessary for ceilings or other obstructions to be installed prior to the gas vent pipe, then adequate clearance shall be provided around the vent pipe in order that clearances, as required in Article IV may be ascertained and, also, that the type material and listing may be determined by the Building Official. In no case shall the installation of ceilings or other obstructions prior to inspection be the cause of an inspector having to crawl in or through attics when an earlier installation could have been made and inspection be called for. 105.11.9 Final or Operational Inspection. After a gas meter is set and all equipment is put in service, a final inspection may be made. This inspection will be in sufficient detail to assure that all final connections have been made and that all appliances have been properly adjusted and that all controls are in good working order. Upon the satisfactory completion of this inspection, a certificate of approval shall be issued to the permittee by the Building Official to be delivered to the owner. 105.11.10 Visual or Intermediate Inspection. When all equipment is ready to be put in service, and before the meter is set, visual inspection shall be requested by the Master Gas Fitter. This inspection shall be in sufficient detail to insure that all the provisions of this Code have been complied with. In existing systems, where a meter is already in service, final connection of the appliance or equipment to the customer's gas piping shall not be made until the visual or intermediate inspection is made and approval given. Except for replacements when no roughing-in is required, then a final inspection may be made in lieu of the intermediate inspection. When equipment is placed in operation, such equipment shall be deemed ready for final inspection whether requested or not. However, nothing contained in this section shall relieve any person, firm or corporation from his or their responsibility to request inspection as required by this Code nor shall such inspection relieve any person from payment of additional inspection fees or other penalties incurred under this Code. 105.12 Elevator. 105.12.1 The installation and maintenance of all new and existing elevator equipment is under the control of the State of Alabama Elevator Board. This includes the recall service (i.e., Phase I or Phase II; proper recall using smoke detectors). The Fire Official will be responsible for testing of the sprinkler system providing protection for the elevator shaft/room. The Fire Official will check elevator lobby/shaft detection for proper signals to fire alarm panel. 105.12.2 Man lifts installed on construction sites shall comply with A17.1-2000, Section 5.10. 105.13 Written Release. Work shall not be done on any part of a building, structure, elevator, escalator, or the fire protection, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the Building or Fire Official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing inspections. 105.14 Reinspection. If the Building or Fire Official finds that the work will not pass the inspection, the contractor shall be required to make necessary corrections and the work shall then be resubmitted for reinspection. Where additional inspections are necessary, there shall be an additional fee as provided for in Article V. 105.15 Delayed Inspection and Penalty. On any job for which a permit has been obtained and a period of more than 90 days elapsed without request for an inspection, an inspection shall be made and should it be ascertained that the work has been completed for which an inspection is required and no inspection has been requested as otherwise required by this Code, a delayed inspection penalty fee shall be paid as provided in this Code. Payment of this fee shall not include preclude payment of any other inspection charges incurred due to defective material, workmanship, equipment, apparatus, or the lack of equipment, apparatus, or personnel required for inspection or tests. 105.16 Contractor's Responsibility. It shall be the responsibility of the contractor to make sure that the work will stand the test prescribed before giving the notice for the inspection. It shall also be the responsibility of the contractor to see that the premises, work and personnel are available and accessible to the Building and Fire Officials or their representative for final inspection. Failure of the contractor to insure that final inspections are requested in accordance with this section may result in denial of future permit issuance. 105.17 Retesting. If the Building or Fire Official finds that the work will not pass the test, the contractor shall be required to make necessary corrections and the work shall then be resubmitted for inspection. Where additional inspections are necessary for such retesting there shall be an additional fee as provided for in Article V. 105.18 Covering the Work. Prior to testing, the system or part thereof shall not be covered until it has been inspected, tested and approved as prescribed in this Code. 105.19 Uncovering of Work. If a system or part thereof is covered before being inspected and approved as prescribed in this chapter, it shall be uncovered upon direction of the Building or Fire Official. 105.20 Material and Labor for Tests. The equipment, material, power, and labor necessary for the inspection and test shall be furnished by the contractor. The contractor shall be responsible for supplying gas for the operational or final test except that this requirement need not apply to gas meters when the owner has applied for service and a meter has been set within the time period covered in this Code. 106 CERTIFICATES 106.1 Building Occupancy. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the Building Official has issued a Certificate of Occupancy. Said certificate shall not be issued until all required building, structural, elevator, escalator, or the electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with this Code and other applicable laws and ordinances and released by the Building and Fire Officials. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of this Code or of other ordinances of the jurisdiction. 106.2 Issuing Certificate Of Occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, elevator, escalator, fire protection, gas, mechanical and plumbing systems in accordance with this Code, reviewed plans and specifications, and after the final inspection, the Building Official shall issue a Certificate of Occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of this Code. 106.3 Temporary/Partial Occupancy. A temporary/partial certificate of occupancy may be issued for a portion or portions of a building that may safely be occupied prior to final completion of the building. 106.4 Existing Building Certificate Of Occupancy. A Certificate of Occupancy for any existing building may be obtained by applying to the Building Official and supplying the information and data necessary to determine compliance with this Code for the occupancy intended. Where necessary, in the opinion of the Building Official and Fire Official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of this Code and other applicable laws and ordinances for such occupancy, a Certificate of Occupancy shall be issued. 106.5 Roughing-in-Inspection Certificate. Upon the satisfactory completion of the roughing-in-inspection, approval shall be so noted in the electrical, gas, mechanical or plumbing section of the building permit card. This approval shall give the date of the roughing-in-inspection and the name of the inspector. 106.6 Final Inspection Certificate. Upon the satisfactory completion and final test of the plumbing system, a certificate of approval shall be issued by the Building Official to the Contractor to be delivered to the owner. If the work is found to be fully in compliance with this Code and does not constitute a hazard to life and property, he shall issue to such person, for delivery to the owner, a final certificate of approval authorizing connection to the electrical service, the turning on of the current and the use of the installation, and shall send written notice of such authorization to the public utility corporation furnishing the electric service. When a certificate is issued authorizing the connection and use of temporary work, such a certificate shall be issued to expire at a stated time and shall be revocable by the Building Official at his discretion. A preliminary certificate may be issued authorizing the connection and use of certain specified portions of an uncompleted installation; such a preliminary certificate shall be revocable at the discretion of the Building Official. 106.7 Certificate of Completion. Upon satisfactory completion of a building, structure, elevator, escalator, or the fire protection, gas, mechanical or plumbing system or portion thereof, a Certificate of Completion may be issued. This Certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This Certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a Certificate of Occupancy. 106.8 Revocation. The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of this Code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of this Code. 107 SERVICE UTILITIES 107.1 Connection of Service Utilities. No person shall make connections from a utility, source of energy, fuel or power to any building or system which is regulated by this Code and for which a permit is required, until released by the Building Official and a Certificate of Occupancy or Completion is issued. Building Sewers (laterals), water services and gas services shall connect to the respective public main within the limits of the lot lines if extended to the public main. 107.2 Temporary Permanent Connection. The Building Official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary Certificate of Occupancy. A separate application and permit fee is required in addition to all other fees. 107.3 Authority to Disconnect Service Utilities. The Building or Fire Official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by this Code in case of emergency where necessary to eliminate an immediate hazard to life or property or when the structure has been declared a public nuisance. The Building or Fire Official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing as soon as practical thereafter. 107.4 Responsibility of Public Utility Companies. Before any meter is set by any utility company or their authorized agent on any new or existing installation or before a larger meter is set where there is an increase in demand, the company desiring to set meters shall submit the name, address and date of the subscribers making request for such service. No meter shall be set until approval is given by the Building Official. The subscriber's name and address shall be submitted in duplicate. 107.5 Initial Connections. It shall be unlawful for any person, firm, or corporation to make connections from a source of electrical energy to any electric wiring, devices or equipment for the installation of which a permit is required, until a certificate of approval has been issued by the Building Official authorizing such connections and the use of such wiring, devices, or equipment. 107.6 Reconnections. It shall be unlawful for any person, firm, or corporation to make connection from a source of electrical energy to any electrical wiring, device, or equipment which has been disconnected or the use of which has been ordered by the Building or Fire Official to be disconnected until a certificate of approval has been issued by the Building Official authorizing the reconnection and use of such wiring devices or equipment. 107.7 Illegal Work To Be Remedied. Any person, firm, or corporation engaged in the plumbing business or any other person doing work under the provisions of this Code whose work does not conform to the regulations herein set out, shall on notice from the Building Official make the necessary changes at once in order to remedy the same; if the work has not been so changed after 10 days' notice from the Building Official, the said Building Official shall then refuse to issue any more permits until he, it, or they, have conformed to all regulations applying to said work. Any person, firm or corporation having control of such work, who fails or refuses to make said changes, shall be punished on conviction as provided in Section 114. It shall be unlawful for the owner or agent for any building, dwelling, or dwelling unit to permit any drain or conduit connection to remain connected with any public sewer if the work has been improperly done, and no person shall permit the use of any water closet, or other plumbing fixture connected with a sanitary sewer or septic tank without an adequate supply of water connected thereto for the purpose of properly flushing and cleaning same. When any water closet sanitary appurtenance or conduit draining into a sanitary sewer or septic tank becomes stopped, clogged or otherwise out of repair, it shall be the duty of the owner or agent for the building, dwelling or dwelling unit to promptly cause the necessary repairs required for compliance with the provisions herein. 108 POSTING FLOOR LOADS 108.1 Occupancy. An existing or new building shall not be occupied for any purpose which will cause the floors thereof to be loaded beyond their safe capacity. The Building Official may permit occupancy of a building for mercantile, commercial or industrial purposes by a specific occupancy, when he is satisfied that such capacity will not thereby be exceeded. 108.2 Storage and Factory-Industrial Occupancies. It shall be the responsibility of the owner, agent, proprietor or occupant of Group S and Group F occupancies, or any occupancy where excessive floor loading is likely to occur, to employ a competent architect or engineer in computing the safe load capacity. All such computations shall be accompanied by an affidavit from the architect or engineer stating the safe allowable floor load on each floor in pounds per square foot uniformly distributed. The computations and affidavit shall be filed as a permanent record of the Department of Planning, Engineering and Permits, or such other departments which may be assigned by ordinance of the City Council the duty of enforcing this Code. 108.3 Signs Required. In every building or part of a building used for storage, industrial or hazardous purposes, the safe floor loads, as reviewed by the Building and Fire Officials on the plan, shall be marked on plates of approved design which shall be supplied and securely affixed by the owner of the building in a conspicuous place in each story to which they relate. Such plates shall not be removed or defaced, and if lost, removed or defaced, shall be replaced by the owner of the building. 109 TESTS 109.1 The Building or Fire Official may require tests or test reports as proof of compliance. Required tests are to be made at the expense of the owner, or his agent, by an approved testing laboratory or other approved agency. 110 CONSTRUCTION BOARD OF ADJUSTMENT AND APPEALS 110.1 Appointment. There is hereby established a Board to be called the Construction Board of Adjustment and Appeals, which shall consist of eight members. The Board shall be appointed by the Birmingham City Council. 110.2 Membership and Terms. 110.2.1 Membership. The Construction Board of Adjustment and Appeals should consist of eight members. Such Board members should be composed of individuals with knowledge and experience in this Code. One member shall be a practicing Architect, one a competent Builder, one a Lawyer, one an Electrical Engineer one a Mechanical Engineer and two shall be Building or Fire Code Consultants, each of whom shall have had at least ten years' experience as an Architect, Engineer, Consultant, Lawyer or Builder. The Building and Fire Officials shall be ex-officio members. A Board member shall not act in a case that has a personal or financial interest. 110.2.2 Terms. The terms of office of the Board Members shall be six (6) years or until a replacement is appointed. 110.2.3 Quorum and Voting. Four members of the board shall constitute a quorum. In approving equivalency applications of any provisions of this Code or in modifying an order of the Building or Fire Official, affirmative votes of the majority present, but not less than four affirmative votes, shall be required. 110.2.4 Secretary of Board. The Building Official shall designate the deputy or other employee of the Department of Planning, Engineering and Permits to act as Secretary of the Board and who shall make a detailed record of all of its proceedings, which shall set forth the reasons for its decision, the vote of each member, the absence of a member and any failure of a member to vote. 110.3 Powers. The Construction Board of Adjustments and Appeals shall have the power, as further defined in 110.4 herein, to hear equal alternatives and equivalencies, appeals of decisions and interpretations of the Building or Fire Official and consider equivalencies of this Code. The Board shall also have the power to hear appeals of any person directly affected by a decision of the Code Official or a notice or order issued under the Property Maintenance Code of the City that is based on a claim that the true intent of the Property Maintenance Code or the rules legally adopted thereunder have been incorrectly interpreted, the provisions of that code do not fully apply, or the requirements of that code are adequately satisfied by other means. The Board shall also hear the appeal of any person aggrieved by a decision of the City's Design Review Committee or of the inspector related to the application of design review standards in any commercial revitalization district of the City. 110.4 Appeals. 110.4.1 Decision of the Building or Fire Official. The owner of a building, structure or service system, or his duly authorized agent, may appeal a decision of the Building or Fire Official to the Construction Board of Adjustment and Appeals whenever any one of the following conditions are claimed to exist: 110.4.1.1 The Building or Fire Official rejected or refused to approve the mode or manner of construction proposed to be followed or materials to be used in the installation or alteration of a building, structure or service system. 110.4.1.2 The provisions of this Code do not apply to this specific case. 110.4.1.3 That an equally good or more desirable form of installation can be employed in any specific case. 110.4.1.4 The true intent and meaning of this Code or any of the regulations there under, have been misconstrued or incorrectly interpreted. 110.4.2 Equal Alternatives and Equivalencies. The Construction Board of Adjustments and Appeals, when so appealed to and after a hearing, may approve equivalency applications the application of any provision of this Code to any particular case when, in its opinion, the literal enforcement thereof would do manifest injustice and would be contrary to the spirit and purpose of this Code or public interest, and also finds all of the following: 110.4.2.1 That special conditions and circumstances exist which are peculiar to the building, structure or service system involved and which are not applicable to others. 110.4.2.2 That the special conditions and circumstances do not result from the action or inaction of the applicant. 110.4.2.3 That granting the equivalency requested will not confer on the applicant any special privilege that is denied by this Code to other buildings, structures or service systems. 110.4.2.4 That the equivalency granted is the minimum requirement that will make possible the reasonable use of the building, structure or service system. 110.4.2.5 That the granting of the equivalency will be in harmony with the general intent and purpose of this Code and will not be detrimental to the public health, safety and general welfare. 110.4.3 Conditions of the Equal Alternatives and Equivalencies. In granting the equivalency, the Board may prescribe a reasonable time limit within which the action for which the equivalency is required shall be commenced or completed or both. In addition, the Board may prescribe appropriate conditions and safeguards in conformity with this Code. Violation of the conditions of a equivalency shall be deemed a violation of this Code. 110.4.5 Notice of Appeal. Notice of appeal shall be in writing and filed within 30 calendar days after the decision is rendered by the Building or Fire Official. Appeals shall be in a form acceptable to the Building Official and accompanied by a non-refundable check in the amount of $150.00. 110.4.6 Unsafe or Dangerous Buildings or Service Systems. In the case of a building, structure or service system which, in the opinion of the Building or Fire Official, is unsafe, unsanitary or dangerous, the Building or Fire Official may, in his order, limit the time for such appeals to a shorter period. Appeals shall stay all proceedings in furtherance of the action appealed unless the Buildings or Fire Official certifies in writing to the Board that the stay would, in his opinion, cause imminent peril to life or property. 110.5 Procedures of the Board. 110.5.1 Rules and Regulations. The Board shall establish rules and regulations for its own procedure not inconsistent with the provisions of this Code. The Board shall meet on call of the Chairman. The Board shall meet within 30 calendar days after notice of appeal has been received. Hearings before the Board shall be open to the public. The appellant, the appellant's representative, the respective official or city staff member charged with enforcement and any person whose interests are affected shall be given an opportunity to be heard. The rules and regulations of the Board shall be made available to the public through the Secretary. Appeals of notice and orders (other than Imminent Danger notices) shall stay the enforcement of the notice and order until the appeal is heard by the appeals board. 110.5.2 Decisions. The Construction Board of Adjustment and Appeals shall, in every case, reach a decision without unreasonable or unnecessary delay. Each decision of the Board shall also include the reasons for the decision. If a decision of the Board reverses or modifies a refusal, order, or disallowance of the Building, Fire or Code Official or varies the application of any provision of this Code the Building, Fire or Code Official shall immediately take action in accordance with such decision. Every decision related to Articles I - VII of this Code shall be promptly filed in writing in the office of the Building Official with a duplicate copy filed with the Fire Official and shall be open to public inspection. Every decision related to Article VIII of this Code (Property Maintenance Code) shall be promptly filed in writing in the office of the Building Official with a duplicate copy filed with the Code Official and shall be open to public inspection. Every decision related to design review standards in commercial revitalization districts shall be promptly filed in writing in the office of the Building Official with a duplicate copy filed in the office of the Urban Design Administrator and shall be open to public inspection. A copy of the decision shall be sent by mail or otherwise to the appellant and a copy shall be kept in the office of the Building, Fire and Code Officials, as provided above. Every decision of the Board shall be final, subject however to such remedy as any aggrieved party might have at law or in equity." 111 - LICENSES AND BONDS 111.1 General. Before any person, firm, or corporation shall engage in fire protection, mechanical, electrical, plumbing, or gas fitting work within the City, County, and State they shall be qualified as set forth herein, and a license shall be obtained from the City, County, and State as required and proper bonds posted. Where electrical, plumbing, or gas fitting work is being done, a master or journeyman electrician, plumber, utility gas fitter or gas fitter shall at all times be present on the job, and in actual control and in charge of the work being done. In the case of utility gas fitters they may only be in the employ of a public utility duly franchised in the City of Birmingham. Exception: Any firm or corporation licensed to do any work in connection with "limited energy" or other work approved by the Administrative Authority. 111.2 Registration. Any person registered as Master Plumber or Gas Fitter with the State of Alabama Plumbers and Gas Fitters Board may apply for and obtain permits, provided, they have obtained a business license from the City of Birmingham as required by the City ordinance and provided bonding as herein required is in effect. 111.3 Licensing of Electricians. 111.3.1 Definitions. The term "electrical construction", as used in this Code, shall be held to include all work and materials used in installing, maintaining or extending a system of electrical wiring for light, heat or power and all appurtenance, apparatus or equipment used in connection therewith, inside of or attached to any building or structure, lot or premises. The term "electrical contractor", as used in this Code, shall be held to mean a person who is engaged in the business of electrical construction and who is qualified under the terms and provision of this Code. The term "master electrician", as used in this Code, shall be held to mean a person who possesses the necessary qualifications, training, and technical knowledge to plan, lay out, and supervise the installation of electrical wiring, apparatus and equipment for light, heat, and power, as covered by the terms and provisions of this Code. The term "journeyman electrician", as used in this Code, shall be held to mean a person who possesses the necessary qualifications, training, and technical knowledge to install electrical wiring, apparatus or equipment for light, heat, or power, as covered by the terms and provisions of this Code, also he shall be capable of doing said work according to plans and specifications furnished to him and in accordance with standard rules and regulations governing such work. The term "apprentice electrician", as used in this Code, shall be held to mean a person who is engaged in the electrical industry in the capacity of assistant to a journeyman electrician. The term "direct supervision", as used in this Code, shall be held to mean supervision by the supervisor while on the same premises or under the same roof with the supervised. The term "maintenance electrician", as used in this Code, shall be held to mean a person who possesses the necessary qualifications, training, and technical knowledge to maintain electrical wiring, apparatus or equipment for light, heat, or power, as covered by the terms and provisions of this Code; he shall be capable of performing such maintenance work in accordance with standard rules and regulations governing such work; and, he shall be a person who is regularly employed, to maintain and make necessary repairs to the existing building or premises, owned or occupied, or controlled by the person, firm, company, or corporation by whom he is employed. The term "fire district", as used in this Code, shall mean the district referred to in Appendix D of Article II. 111.3.2 All Electrical Examinations are conducted by the State of Alabama Electrical Contractors Board. 111.3.10 Reciprocity. Reciprocity shall be with the State of Alabama, Jefferson County and those deemed by the Building Official. 111.3.11 Apprentice Registration. Any person who shall apply for registration as an apprentice electrician upon form provided for that purpose by the City, shall be registered as such by the Chief Electrical Inspector without examination for the next succeeding calendar year upon payment to the Director of Finance of an annual fee of thirty-five dollars ($35.00). 111.3.12 Renewal of Certificate of Registration. Every certificate of registration, whether master's or journeyman's, and whether original or renewal, shall be issued for only the calendar year in which issued and dated, and shall be of no force or effect in any subsequent calendar year. Any holder of an unrevoked and unsuspended master's certificate for the current or preceding five (5) calendar years shall be entitled to a renewal certificate without examination for the next succeeding calendar year upon payment to the Director of Finance of a renewal fee of fifty dollars ($50.00) for each of the preceding and current years. It shall be unlawful for any person to engage in the business of master electrician or electrical contractor in any period in which he does not hold an unrevoked and unsuspended master's certificate. Any holder of an unrevoked and unsuspended journeyman's certificate for the current or preceding five (5) calendar years shall be entitled to a renewal certificate without examination upon payment to the Director of Finance of a renewal fee of thirty-five dollars ($35.00) for each of the preceding and current years. It shall be unlawful for any person to engage as a journeyman in any period in which he does not hold an unrevoked and unsuspended journeyman's certificate. A person may renew an unexpired registration by paying to the board before the expiration date of the registration the required renewal fee. If a person's registration has been expired for not longer than 90 days, the person may renew the registration by paying to the board the required renewal fee and a fee that is one-half of the examination fee for the registration. If a person's registration has been expired for longer than 90 days but less than two years, the person may renew the registration by paying to the board all unpaid renewal fees and a fee that is equal to the examination fee for the registration. If a person's registration has been expired for two years or longer, the person may not renew the registration. The person may obtain a new registration by submitting to re-examination and complying with the provisions for obtaining an original registration. Any holder of an unrevoked and unsuspended maintenance electrician's certificate for the current or preceding calendar year shall be entitled to a renewal certificate without examination for the next succeeding calendar year, upon payment to the Director of Finance of a renewal fee of thirty-five dollars ($35.00). It shall be unlawful for any person to engage as a maintenance electrician for any person, firm, company, or corporation in any period in which he does not hold an unrevoked and unsuspended maintenance certificate. 111.3.13 Revocation and Suspension of Certificate of Competency. The Electrical Examining Board shall have the power to revoke any certificate if, after fair hearing, it be found that any false statement was made in the application or that actual practice under such certificate has demonstrated to the satisfaction of the Board that the holder thereof does not possess the qualifications necessary for issuance of a certificate after examination as provided in Section 111.3.3, Section 111.3.4, and Section 11.3.5; and revoked certificate shall not be reinstated within thirty days and without examination as provided in Section 111.3.3, Section 111.3.4, and Section 111.3.5. The Board shall have power to suspend any certificate for a definite period not exceeding sixty days if, after fair hearing, it determines that the holder has been guilty of any violation of the laws of the City relating to the electrical installation or construction or of any clearly incompetent workmanship. 111.3.14 Appeal From Action of Building Official. 111.4 Prerequisite to License. The Director of Finance shall refuse to issue a license to any person to engage in the business of gas, plumbing, mechanical or electrical construction and installation, unless such person holds a valid unrevoked and unsuspended master's certificate of competency, or certification of the Alabama State Board of Heating and Air Conditioning Contractors or has in his full-time employ a person who holds such master's certificate or certification. The Director of Finance shall also refuse to issue to any partnership a license to engage in such business unless said partnership shall have in its full time employ, or as a member, a person who holds such master's certificate or certification. The Director of Finance shall also refuse a license to any corporation which has not in its full time employ, a person who holds a masters certificate. Every such license shall stand suspended during any period in which the conditions requisite to issuance of a license do not prevail. Exception as required by 111.1. 111.5 Duty of Employer. No person, firm or corporation shall employ any person on any job in the capacity of a journeyman electrician, plumber or gas fitter except as permitted for utility gas fitters in the employ of a duly authorized franchised public (gas) utility company, unless such person shall have in his possession a valid journeyman's certificate of registration, issued to him as hereinabove provided in this Code. 111.6 Unlawful To Do Business Without Certificate. It shall be unlawful: (a) For any person other than a holder of a certificate of registration as an apprentice electrician, plumber or gas fitter to do any electrical, plumbing or gas installation or construction work in the city; or 1) For any holder of a certificate of registration to employ as an assistant in any such work any person other than a holder of a certificate of registration or the holder of a certificate of registration as an apprentice electrician, plumber or gas fitter; or 2) For any holder of a certificate of registration to require a registered apprentice electrician, plumber or gas fitter to do any such work otherwise than under his direct supervision; or 3) For any registered apprentice electrician, plumber or gas fitter to do any such work otherwise than while under the direct supervision of the holder of a certificate of registration; or 4) For any holder of a maintenance electrician's, plumber's or gas fitter's certificate to make any alterations or additions to the wiring, plumbing or gas systems of the person, firm, company, or corporation by whom he is employed; or 5) For an individual to perform plumbing or gas work upon his own premises, other than what is allowed in Section 101.3.5 Chapter 1 (b) To engage as a gas fitter or plumber for another person, firm or corporation while work is outstanding under permit issued to him while operating his own gas fitting or plumbing business. (c) To engage in the business as gas fitter or plumber for himself while permits are outstanding on work issued to another under his signature while acting as Master Gas Fitter or Plumber for such company, firm or corporation. (d) To engage as a gas fitter or plumber for any company, firm or corporation while permits are outstanding for any other company, firm or corporation issued under his signature as Master Gas Fitter or Plumber. (e) To operate two or more gas fitter or plumbing businesses and act as Master Gas Fitter or Plumber for both at the same time. (f) To be employed by two or more gas fitting or plumbing businesses at the same time while acting as Master Gas Fitter or Plumber for either. (g) Anything herein to the contrary notwithstanding, it shall not be unlawful for any public utility corporation operating under a franchise from the city to transmit and sell electrical energy, or any employee of such public utility corporation to do any such work as a part of the public utility business of such corporation. 111.7 Installation and Operation of Illegal Wiring of Equipment. It shall be unlawful for any person, firm, or corporation to permit the installation of any electrical wiring, apparatus, or other appurtenances upon his premises, works, ways, machinery, or plant except in strict accordance with all provisions of this Code; it shall be further unlawful for any person to maintain, operate or attempt to operate any electrical wiring, apparatus, equipment, or other appurtenances in or upon his premises, works, ways, machinery, or plant which has not been installed in strict accordance with this Code. 111.8 Vehicular Signs. All trucks and similar vehicles used by electrical, plumbing, heating and gas contractors shall have on the body on both sides of same, the full name and telephone number of the firm to which it belongs. Lettering may be any color in contrast to the color of the body, but the firm's name must be in letters at least 2½ inches high. 111.9 Bond Required of Electrical Contractors. Before any person, firm, or corporation may engage in the business of installing, maintaining, or repairing electrical wiring, equipment, as an Electrical Contractor or in excavating or blasting within the City of Birmingham, he, it, or they, shall in addition to the requirements of competency, have a business license issued by the Municipal, City, and State authorities, also deposit with the Director of Finance and continuously maintain a good and sufficient bond in the sum of ten thousand dollars ($10,000) to be approved by the Director of Finance, and made by surety company duly authorized to do business in Alabama. Said bond shall be conditioned that the person, firm, or corporation, to be known as the principal in said bond, shall faithfully observe all ordinances and laws of the City pertaining to said business or businesses, whether now or hereafter enacted, together with all rules and regulations established under the authority of said laws or ordinances; and shall perform in a workmanlike manner all work undertaken by said principal in the prosecution of said business or businesses; and shall indemnify and save harmless the said City from all liability occasioned or arising from acts done or omitted by said principal, its servants and agents, in doing said work or from any unfaithful or inadequate work; and shall adequately safeguard all ditches and excavations which may be opened by said principal in the streets and highways of said City; and shall restore, or cause to be restored, in a workmanlike manner, to their former condition, all such portions of said streets and highways excavated by said principal, and pay the expenses thereof; and shall maintain said restored portions in a safe condition for the period of one year from the date of such excavation; and shall defend all suits brought against the City based, in whole or in part, upon any act or default for which said principal is responsible, and pay the costs and expenses thereof, and shall pay all such damages as any person, firm, or corporation may sustain by reason of violation of said laws, ordinance or regulations by said principal, its servants, or agents, in the prosecution of said business or businesses. Any person, firm, or corporation injured in person or property by reason of any violation of said laws, ordinances, or regulations by said principal, or by an act, default, or omission constituting a breach of any of the conditions of this bond, may maintain a suit or action thereon for such injury. Said bond shall also provide that it may be canceled by the surety by giving the Director of Finance thirty (30) days' notice in writing prior to the date of cancellation. Failure to comply with this section shall be cause for immediate revocation of the business license of the said person, firm, or corporation after first granting said person, firm, or corporation the right to a public hearing before the City Council. All contractors, subcontractors, permit holders shall have the required business license issued by municipal, city, county and state authorities before permit issuance. 111.10 Allowing One's Name, License, or Bond to be Used to Obtain Permit Fraudulently. No person, firm, or corporation engaged in the electrical, plumbing or gas business shall allow his, its, or their name to be used by any other person, firm, or corporation, directly or indirectly, to obtain a permit for the construction of any work under his, its, or their name, license or bond; nor shall he, it or they make any misrepresentations or omissions in his, its, or their returns. No person holding a Master's certificate shall represent two or more businesses as such nor shall he represent any other business as such while operating his own business. 112 WIRING ON PUBLIC AND PRIVATE PROPERTY 112.1 Approved Wiring Within the Fire District. Within the Fire District, referred to in Appendix F of the Building Code of the City of Birmingham, all wiring shall be restricted to the provisions of the following Articles of the standard referred to in Chapter 11 of this Code: Articles 318, 326, 328, 330, 333, 334, 342, 344, 345, 346, 347, 348, 350, 351, 352, 353, 354, 356, 358, 362, 363, 364, 365. 112.2 Conformity. (a) Section 210-5 shall be amended to add (c) to read as follows: 210-5c Identification of Ungrounded Conductors and Color Coding of Branch Circuits. Each branch circuit connected to the same 120/240 or 120/208 volt system shall conform to the following color code: Single phase systems shall be one black, one red; for 3 phase systems one black, one red, one blue. Each branch circuit connected to the same 277/480 volt system shall conform to the following color code: one yellow, one orange, one brown. Each circuit with a higher voltage to ground or high leg shall have the high leg marked orange and shall conform to the following color code: one black, one orange, one blue. All circuits of the same color shall be connected to the same ungrounded feeder conductor throughout the system. (c) Section 215-10 shall be amended to add (b) to read as follows: 215-10b Installation Requirements for Feeders. Service entrance conductors and feeders in residential multiple occupancy buildings; from the service drop or lateral to distribution panels; shall be installed in rigid metal conduit, IMC, EMT, or rigid nonmetallic conduit, either in a slab, basement or crawl space under a building or in a manner that the raceway will not pass through one occupancy to reach another, except the vertical portion from one floor to another connecting to a panel board. (s) Electric fences shall be prohibited from any location within the City of Birmingham, except when approved by the Building Official. 113 SEVERABILITY If any section, subsection, sentence, clause or phrase of this Code is for any reason held to be unconstitutional, such decision shall not affect the validity of the remaining portions of this Code. 114 VIOLATIONS AND PENALTIES Any person, firm, corporation or agent who shall violate a provision of this Code, or fail to comply therewith, or with any of the requirements thereof, or who shall erect, construct, alter, install, demolish or move any structure, fire protection, electrical, elevator, escalator, gas, mechanical or plumbing system, or has erected, constructed, altered, repaired, moved or demolished a building, structure, elevator, escalator, fire protection systems, flammable liquid use or storage, electrical, gas, hazardous materials use or storage, mechanical or plumbing system, or conduct processes which produce hazards to life and property, in violation of a detailed statement or drawing submitted and permitted there under, shall be guilty of a misdemeanor. Each such person shall be considered guilty of a separate offense for each and every day or portion thereof during which any violation of any of the provisions of this Code is committed or continued, and upon conviction of any such violation such person shall be punished within the limits and as provided by Section 1-1-6 of the General Code of the City of Birmingham, Alabama, 1980.
(Ord. No. 10-112, 8-24-2010; Ord. No. 15-164 , 11-30-2015; Ord. No. 16-19 , 2-16-2016; Ord. No. 16-89 , § 1, 5-27-2016; Ord. No. 16-118 , § 1, 6-29-2016; Ord. No. 19-93 , § 1, 7-10-2019)
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.
