§ 83-24 — Construction Best Management Practices Plan (BMP Plan)
Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 83-24
Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/0db68a6e-f265-4577-af82-d0eb7b8910d0
Sec. 83-24. - Construction Best Management Practices Plan (BMP Plan).
(a) The City of Dothan, Alabama's Phase II MS4 NPDES permit allows the city to rely upon ADEM for the setting of standards for appropriate erosion and sediment controls. The city hereby expresses its intent to rely upon the aforementioned standards established by ADEM and requires any BMP Plan filed with the city to be in a format acceptable to ADEM and contain all necessary information and details required by ADEM's applicable regulations and NPDES construction stormwater permit. (b) The BMP plan shall be updated as necessary to address changes in the construction activity, site weather patterns, new TMDLs established or approved by EPA, new 303(d) listings approved by EPA, manufacturer specifications for specific control technologies, or as otherwise required by ADEM. The BMP plan shall be amended if inspections or investigations by federal, state or city officials determine that the existing erosion and sediment controls or other site management practices are ineffective or do not meet the requirements of applicable permits. All necessary modifications to the BMP plan shall be made within seven calendar days following notification of the inspection findings unless granted an extension of time. If existing erosion and sediment controls or other site management practices prove ineffective in protecting water quality or need to be modified; or if additional erosion and sediment controls or other site management practices are necessary, implementation shall be completed before the next storm event whenever practicable. If implementation before the next storm event is impracticable, then new land disturbing activities must cease until the modified or additional controls can be implemented. (c) Whenever the city determines that a BMP plan does not comply with this article, it will notify the applicant in writing of the ways in which the BMP plan does not comply with this article.
(Ord. No. 2013-149, § 1, 6-4-13)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.
