Sec. 83-26. - Responsibilities of the permittee, property owner and/or developer.
(a) Once received from the city, the BMP plan bearing the stamp of approval of the city, along with the permittee's NOI, ADEM NPDES permit, any necessary building or other permits, and/or other required documentation shall be maintained at the site during the progress of the work and until a notice of termination has been filed with ADEM, unless impracticable. If impracticable, the aforementioned records may be maintained at another reasonable location, so long as they can be produced to the city within 48 hours of a request for said records. (b) The permittee, or an agent, contractor or other representative of same, shall notify the city at least two working days before the start of construction, unless good cause exists for contacting the city within a lesser timeframe. (c) Clearing, except that necessary to establish erosion and sediment controls, shall not begin until all erosion and sediment controls have been installed and have been stabilized. (d) The person engaged in or conducting land disturbing activities shall be responsible for maintaining all temporary and permanent erosion and sediment controls during the development of a site. Grading, and erosion and sediment controls shall meet the design criteria set forth in the most recent version of the Alabama Handbook. (e) To the maximum extent practicable, pollutants in runoff water must be minimized by using appropriate BMPs. (f) Grading and erosion and sediment controls shall be designed and maintained to minimize erosion and the discharge of pollutants to the MS4 to the maximum extent practicable. (g) Adequate protective measures shall be provided for the containment of hazardous substances and any other materials which may pollute the MS4, including petroleum products, lubricants and paint. (h) When land disturbing activities are finished and stable vegetative control measures or other permanent controls have been established on all remaining exposed soil, the permittee shall notify the city and request a final inspection. The city will inspect the site within five working days after receipt of the notice, and may require additional measures to stabilize the soil and control erosion and sedimentation. If additional measures are required by the city written notice of such additional measures will be delivered to the permittee, and the permittee shall continue to be covered by the permit until a final and complete inspection is made and the city approves the project as having been satisfactorily completed.
(Ord. No. 2013-149, § 1, 6-4-13)