Sec. 83-25. - Post-construction requirements for new development and redevelopment.
(a) The permittee shall develop and implement post-construction strategies for new development and redevelopment that include, at a minimum, a combination of structural and/or non-structural BMPs designed to require, to the maximum extent practicable, that the volume and velocity of pre-construction stormwater runoff is not significantly exceeded, as determined by the city. Said combination of post-construction strategies shall be designed to function during rainfall events with intensities including 2-, 10-, and 25-year-24 hour storm events. The city reserves the right to require the inclusion of larger storm events. (b) Post-construction strategies may be incorporated into permittee's BMP plan filed with the city or in a separate document. Said post-construction strategies shall be reviewed, approved, and updated pursuant to the same requirements as those of the permittee's BMP plan. (c) Permittee's post-construction strategies must show proposed final site conditions and describe how the volume and velocity of stormwater leaving the site will be managed after construction is complete to require, to the maximum extent practicable, that it does not exceed the volume and velocity of pre-construction stormwater runoff. (d) Upon completion, permittee shall file with the city a certified copy of as-built drawings and calculations of any post-construction strategies implemented at the site. Such filing shall demonstrate, to the maximum extent practicable, that final post-construction site conditions comply with subsection (a), above. (e) The city reserves the right to inspect post-construction strategies following implementation by permittee and require documentation allocating responsibilities for long-term operation and maintenance of post-construction strategies, as it deems necessary. The city may also require permittee to provide a method of funding to be established or provided to ensure the long term maintenance of any post-construction BMPs.
(Ord. No. 2013-149, § 1, 6-4-13)