§ 90-220 — Construction procedures
Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 90-220
Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/6d616dda-008e-44b6-ac6c-40e396d02e10
Sec. 90-220. - Construction procedures.
(a) Construction plans. Construction and installation of any required public improvements as described in this section shall not begin until the planning commission has given preliminary approval of the new subdivision and the public works director has approved construction plans for the new subdivision. Construction plans must be prepared, signed and sealed by a professional engineer. The following shall be observed: (1) Eight sets of construction plans shall be submitted to the department of planning and development for distribution and review by the appropriate reviewing agency. (2) The designs for all utilities are to be submitted in the complete set of construction plans, including electric, gas, cable TV, and telephone. Locations of junction boxes and conduits should be shown as well as the location of proposed utilities in the typical roadway detail. A pre-design meeting shall be set up by the developer or design engineer with all applicable utility representatives and the City of Dothan. (3) The owner/developer is responsible for relocating any utility facilities (water services, fire hydrants, street lights, utility poles, telephone boxes, etc.), including the isolation and lowering of existing utilities that may interfere or require relocating due to this development. (4) Fire hydrants shall be located per the fire code as required by the fire marshal and approved by Dothan Utilities. (5) The designer or contractor must submit a site plan or approved BMP plan depicting the placement and scheduling of erosion and/or sedimentation control prior to the commencement of work on the project. Provide a note on the construction plans stating that all erosion control measures shall be in place as required by the engineer, plans, and City of Dothan representative. An inspection log will be required to be submitted to the City of Dothan. Siltation control measures shall be inspected per the NPDES permit requirements and at a minimum once a month. Any deficiencies shall be corrected immediately and no further work will proceed until said deficiencies are corrected to the City of Dothan or engineer's approval. (6) A copy of any NPDES, state, or other permits associated with this development shall be provided to the City of Dothan before construction plans will be approved or before the construction associated with the permit will be allowed to begin. It shall be the responsibility of the design engineer to obtain all required permits for the development. (7) Water material submittals shall be provided to Dothan Utilities for approval before use in subdivision construction. (8) Sidewalks shall be installed at the time of road construction. Once accepted, subsequent damage on each individual lot and/or address shall be the responsibility of the home builder to repair during construction. No certificate of occupancy shall be issued for that address until repairs are completed and accepted. (9) Addresses shall be shown on the construction plan for each lot and marked on the curb. (b) Inspections and approval. All construction shall be inspected by the designing engineer or his designated representative. After completion of all the construction and the installation of the required public improvements and if the work has met the specifications as described in this section, and certified by the design engineer, the design engineer shall then supply one set of as-built (record) plans and profiles showing the locations of all improvements, including all lateral service lines to the public works director, along with/prior to a written request for a final inspection. Upon completion of the final inspection, a punch list will be generated. When the punch list items have been corrected and a letter has been sent to the public works director stating such, the public works director shall inspect the work and if satisfactory, notify the subdivider in writing of the approval of such work. Work outside the contract, such as electrical, telephone, etc., must be performed in accordance with the approved plans and be in agreement with the design engineer and the public works director. The public works director or his authorized agent may inspect all or any of the work associated with the subdivision. The term "as-built" (record) plans shall also include plans submitted in AutoCAD or .DXF format per section 90-102(f).
(Res. of 7-19-17)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.