For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 90-223 — Roadway surfacing and paving

Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 90-223

Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/176f4ef5-bc2f-462f-959b-d191e65d0e05

Sec. 90-223. - Roadway surfacing and paving.

For all streets, turn, acceleration or deceleration lanes, the following minimum requirements shall be adhered to for the surfacing and paving of the streets: (a) Subgrade. Subgrade shall be modified as set forth in Section 230.01 of the current edition of Alabama Department of Transportation Standard Specifications for Highway Construction. Finish grade shall conform to lines; grades and cross-sections as shown on approved plans unless specific permission is acquired in writing from the public works director. 1. Test requirements. a. CBR. One test per each 5,000 feet or at each significant material change to design pavement buildup. This test is to be run prior to submission of the construction plans. b. Proctor density and optimum moisture. One test each 2,000 feet or at each material change. c. Compaction test. 1. Top six inches of subgrade course compaction shall conform to current Alabama Department of Transportation standards, Roadbed Processing, AASHTO T-99 to 100 percent density and ± two percent Optimum Moisture, minimum. All other subgrade and embankment fill shall meet AASHTO T-99 to 95 percent density. 2. One per 200 feet of finished roadway in locations to be approved by the city. d. A reliable testing firm using the standard testing methods as approved by the Alabama Department of Transportation shall perform testing. Either the developer or developer's engineer, excluding the contractor, shall provide and pay for all testing. The testing lab shall be approved by the public works director. e. Copies of all test reports both passing and failing shall be submitted to the public works director prior to placing overlaying layer. (2) Mandatory inspections by public works director. The public works director or his representative shall inspect subgrade prior to placing the base material. The developer shall contact the public works director at least two days in advance of placement of the base course. (b) Base. Base course shall meet the requirements for granular soil or soil aggregate as set forth in Section 301 of the Alabama Department of Transportation Standard Specifications for Highway Construction. (1) Thickness. Base thickness shall be determined by CBR Test. A minimum thickness of six inches for minor residential streets and eight inches for collector, arterial and commercial streets is required. (2) Compaction. Base course compaction shall conform to current Alabama Department of Transportation standards and the requirements as set forth in this section. (3) Test requirements. a. Soils analysis minimum of one each 2,000 feet. b. Proctor density and optimum moisture one each 2,000 feet. c. Compaction test. 1. Base course compaction shall conform to current Alabama Department of Transportation standards, AASHTO T-180 to 95 percent density and ± two percent optimum moisture, minimum. 1. One per 200 feet of finished roadway in locations to be approved by the city. (4) A reliable testing firm using the standard testing methods as approved by the Alabama Department of Transportation shall perform testing. Either the developer or the developer's engineer, excluding the contractor, shall provide and pay for all testing. The testing lab shall be approved by the public works director. (5) Copies of all test reports both passing and failing shall be submitted to the public works director prior to placing overlaying layer. (6) Mandatory Inspections by the public works director. The public works director or his representative shall inspect the base course prior to placing the overlaying layer. The developer shall contact the public works director at least two days in advance of the anticipated placement of the prime coat. (c) Prime. Prime coat shall meet the requirements of bituminous treatment Type A as set forth in Section 401 of the current Alabama Department of Transportation Standard Specifications for Highway Construction. Application. A bituminous surface treatment Type "A" shall be placed from curb to curb. Material and rates shall be as specified in the Alabama Department of Transportation Standard Specifications for highway construction. (d) Pavement. Pavement shall meet the requirements for bituminous concrete wearing surface as set forth in Sections 424 of the current Alabama Department of Transportation Standard Specifications for Highway Construction. (1) Thickness. Thickness shall be as determined from CBR Testing prior to submission of plans but shall not be less than 165 lbs./square yard for plant mix for minor residential streets. Collector streets and all minor commercial streets shall have a minimum of 220 lbs./square yard for plant mix. Thickness for turn, deceleration and acceleration lanes and all major commercial industrial, commercial collector and arterial streets shall be as determined from CBR testing but shall not be less than 350 lbs./square yard binder course and 150 lbs./square yard wearing surface. (2) Mandatory inspections by public works director. The public works director or representative shall inspect base course and/or prime coat prior to placement of the pavement. The developer shall contact the public works director at least three days in advance of the scheduled placement of the pavement. (3) Width. The width of paving on through streets and cul-de-sacs shall be a minimum of 30 feet back of curb to back of curb. On residential streets with cul-de-sacs that are less than 600 feet in length, the paving width can be a minimum of 27 feet back of curb to back of curb. Single lane paving width with a median island shall be a minimum of 18 feet from face of curb to face of curb. Street widths not conforming to the above standard may be approved by the planning commission upon concurrence from the planning and public works directors. (4) Resurfacing. Any existing street in a proposed subdivision to be platted for public R-O-W shall be resurfaced with a minimum of 110 lbs./square yard of 424 asphalt mix. Any development that was approved by the planning commission and has been constructed, and that has not been recorded and a mylar copy provided to the city for a period of more than two years, shall be inspected and at the discretion of the public works director, may require all streets to be recorded for public R-O-W to be resurfaced with a minimum of 110 lbs./square yard of 424 asphalt mix. (e) Curbs and gutters. Two-foot combination curb and gutter shall be used equal to ALDOT standard type M-2 curb and gutter. Special combination curb and gutter sections (such as 30-inch mountable curb and gutter, etc.) shall require approval from the public works director. (f) Pavement breaks for utility connections. When it is necessary for a subdivider, or any utility company, to break existing pavement for the installation of utilities or drainage facilities, or for any other purpose, the subdivider, or utility company, shall be financially responsible for the repair of the pavement. The pavement shall be repaired in accordance with the specifications required by the public works director. A minimum of 110 lbs./square yard of 424 asphalt mix overlay of the existing roadway full width is required over the cut and for a minimum of ten feet each side of edge of cut. (g) Tile drainage (underdrain). Tile drainage shall be of material as set forth in Section 606.01 of Alabama Department of Transportation Standard Specifications for Highway Construction. Subsurface tile drainage shall be installed in order to protect the base material as required by the public works director. The installation of tile drainage may be required by the public works director at any time during construction and throughout the entire two-year maintenance period. The cost of design and installation is the responsibility of the developer. Tile drainage is required back of curb on both sides of median islands for all median islands.

(Res. of 7-19-17)

Ask a question about Dothan law

Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.