§ 90-224 — Installation of utilities
Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 90-224
Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/1f785ebf-849d-42da-bd49-60340465e338
Sec. 90-224. - Installation of utilities.
Water. Water mains for both domestic use and fire protection shall be properly connected with the public water system, or with an alternate water supply approved by the city. All new connections to the existing water utilities shall be completed by Dothan Utilities only after the acquisition of any required permits and the payment of the required fees. The water mains and associated facilities shall be constructed in such a manner as to serve adequately all lots shown on the subdivision plat. The water mains and associated facilities shall be specified and installed in conformance with the technical standards as established by the city and in accordance with City of Dothan Subdivision Specifications and Standard Details. (a) Sewer. A sanitary sewer system shall be installed for all lots in the subdivision and in accordance with City of Dothan Subdivision Specifications and Standard Details. Sanitary sewer laterals shall be a minimum of 60 inches below finished grade at all locations on R-O-W and easements. Areas where this cannot be met shall require ductile iron laterals to be used. Sanitary sewer systems in commercial subdivisions shall be private. Existing public sanitary sewer systems through a commercial subdivision will remain public. Where subdivisions cannot be connected to the city sewer system in a manner which is technically feasible or economically reasonable, the planning commission may provide a waiver to the developer which provides for the installation of individual sewage disposal systems. This waiver will be contingent upon suitable soil conditions, as approved by the county health department, and may include a requirement for dry sewers to be constructed for future use. The waiver may in no case require less than a complete sewer design for the subdivision and provisions for all easements made for future sewer construction. (b) Gas and electricity. When gas mains and/or electric lines are connected with the distribution systems, the lines shall be installed in such a manner as to serve adequately all lots shown on the subdivision plat. The gas and electric lines shall be specified and constructed in conformance with the technical standards as established by the appropriate utility owner. (c) Gas, electricity, telephone, cable TV, and any other utility. All utilities within a subdivision shall be installed only within the designated area(s) as shown on the typical roadway detail of the approved construction plans. When they are shown on the subdivision construction plans, utilities that are installed during the construction phase of the subdivision will be covered under the approved construction plans. When the utilities are not shown on the plans, the utility or the subdivision design engineer must submit plans showing the proposed locations for approval. No utilities will be installed without consideration of the other existing or proposed utilities. If the utilities are not installed during the construction of the subdivision, and after the final plat is signed and recorded, a permit will be required. A set of plans showing the locations and depths of all other utilities and the location and depth of the proposed utility to be installed will be required before any permit will be issued. The plans and location of proposed utilities must be approved by the public works director. (d) The utility will agree to carry out excavation activities and in locations as shown by the plans so as to occasion the least possible interference with the maintenance of the street and/or other public utilities and facilities. The utility will also agree to conform to the provisions of the current City of Dothan Subdivision Specifications and Standard Details and the laws of the City of Dothan. (e) Any existing permanent property pins or monuments that are damaged during the installation process must be replaced and reset by a registered land surveyor in the State of Alabama and paid for by the utility. (f) Location of water services, fire hydrants, water valves and sewer service locations shall be permanently marked on curb.
(Res. of 7-19-17)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.
