Sec. 17-6. - Permits.

(a) (1) Land disturbance permit, tier 1 and tier 2. A permit from the permitting department is required for any land-disturbing activity within the city unless exempted under subsection 17-8(b) herein. Land disturbance permits expire upon completion of the permitted work, or if the work is not started, not later than one (1) year from the date the permit is approved or issued. A permittee may be granted an extension, at no additional cost, by contacting the permitting department in writing prior to the expiration date of the permit. Disturbed property may not remain denuded longer than ten (10) days without establishing vegetation or the application of suitable ground cover for the control of erosion and sedimentation, see landscaping and stabilization requirements herein, subsection 17-9(c). Specific requirements for obtaining a land disturbance permit include: a. Approval of a full set of construction plans, including site, grading, and drainage plans by the city engineer; b. Compliance with all regulations (including federal and state) and approval from the city permitting and traffic engineering departments; c. Documentation that all necessary permits have been received from governmental agencies from which approval is required by law, provided, however, that the responsibility for acquiring all permits remains with the owner/developer; d. Compliance with the city's floodplain regulations set out in Division 2 of this chapter; and e. A non-refundable permit review fee, established in accordance with subsection 17-8(c)(1). (2) Land disturbance permit, tier 1 only. a. A stormwater management plan meeting the requirements of section 17-9; b. A maintenance easement and covenant, as appropriate, meeting the requirements of subsection 17-10(a) and (b). (b) Building permit. A permit from the permitting department is required to erect, construct, reconstruct, enlarge, extend or structurally alter any building or structure, including interior alterations, within the city. Specific requirements for obtaining a building permit include: (1) An approved land disturbance permit authorized by the city's engineering department and permitting department and approval of the city's traffic engineering department unless exempt under subsection 17-8(b); (2) A permit application in compliance with all floodplain requirements as set forth in this section and division 2 of this chapter; (3) Satisfactory evidence that permits have been received from those governmental agencies from which approval is required by federal or state law, provided, however, that the responsibility for acquiring all permits remains with the owner/developer; and (4) Plans for building structures in compliance with all applicable building codes, policies and regulations of the permitting department. (c) Clearing and grubbing; timber harvesting. (1) A land disturbance permit from the permitting department is required for timber harvesting operations that involve construction of access roads, stump/root removal, earthwork or cutting undergrowth. (2) A timber harvesting permit from the urban forester is required for harvesting operations that involve cutting or harvesting trees without constructing access roads, stump/root removal, earthwork or cutting undergrowth, but a tier 1 land disturbance permit will not be required if the area disturbed is less than one (1) acre. A tier 2 land disturbance permit will be required. (3) A land disturbance permit from the permitting department is required, without exemption or exception, for clearing and/or grubbing operations in special flood hazard areas. (4) A land disturbance permit, tier 2, from the permitting department is required for clearing and/or grubbing four thousand (4,000) square feet or more within city limits. (5) No land disturbance permit, either tier 1 or tier 2, is required for clearing and/or grubbing private residential property associated with construction of a residential structure that disturbs less than four thousand (4,000) square feet, if outside a special flood hazard area. (6) Other obligations. All clearing and/or grubbing activities, whether required to obtain a land disturbance permit or not, shall: a. Observe erosion and sedimentation control requirements found in this article; b. Obtain all other necessary permits, licenses and authority and to pay all fees required by any other city, county, state, or federal rules, laws or regulation, provided, however, that the responsibility for acquiring all permits remains with the owner/developer; or c. Comply with all requirements to preserve and protect trees. (d) Floodplain development permit. (1) Establishment of floodplain development permit. Application for a floodplain development permit shall be made to the permitting department as required by the provisions of this chapter PRIOR to the commencement of any development in identified areas of special flood hazard and city-identified flood hazard areas within the city limits. (2) Application stage. a. Elevation in relation to mean sea level (or highest adjacent grade) of the regulatory lowest floor (including basement), of all proposed structures; b. Elevation in relation to mean sea level to which any nonresidential structure will be flood-proofed; c. Design certification from an Alabama licensed professional engineer for certificates required by 17-27(d)(1) or by either a registered architect or licensed professional engineer that the non-residential flood-proofed criteria in section 17-27(d)(2) has been met; d. Design certification from an Alabama licensed professional engineer or registered architect that any new construction or substantial that any new construction or substantial improvement placed in a will meet the criteria of section 17-29, coastal high hazard area. (3) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the permitting department a certification of the regulatory floor elevation or flood-proofing level using appropriate FEMA elevation or flood proofing certificate immediately after the lowest floor or flood proofing is completed, or in instances where the building is subject to the regulations applicable to coastal high hazard areas, after placement of the horizontal structural members of the lowest floor. Said FEMA elevation certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer licensed by the state, certified by same, and recorded in the land records of the judge of probate, Mobile County. a. When flood-proofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. b. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. c. The permitting department shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit certification or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project. d. The permitting department may revoke and require the return of the floodplain development permit by notifying the permit holder in writing stating the reason(s) for the revocation. Permits shall be revoked for any substantial departure from the approved application, plans, and specifications; for refusal or failure to comply with the requirements of state or local laws; or for false statements or misrepresentations made in securing the permit. Any floodplain development permit mistakenly issued in violation of an applicable state or local law may also be revoked. (4) Finished construction. Upon completion of construction, a FEMA elevation certificate (FEMA Form 81-31), which depicts all finished construction elevations, is required to be submitted to the permitting department prior to issuance of a certificate of occupancy. a. If the project includes a floodproofing measure, a FEMA floodproofing certificate is required to be submitted by the permit holder to the permitting department. b. If the structure is located in a V-zone, a V-zone certificate is required. The applicant shall use the city's certificate. The certificate shall provide the following minimum design and construction requirements for the V-zone: 1. A registered professional engineer or architect shall develop or review the structural design, specifications, and plans for the construction. 2. A registered professional engineer or architect shall certify that the design and methods of construction to be used are in accordance with accepted standards of practice for meeting the following criteria: • The bottom of the lowest horizontal structural member of the lowest floor (excluding the pilings or columns) is elevated to or above the base flood elevation (BFE); and • The pile or column foundation and structure attached thereto is anchored to resist flotation, collapse, and lateral movement due to the effects of wind and water loads acting simultaneously on all building components. Use ASCE 7-10, Minimum Design Loads for Buildings and Other Structures, for guidance. 3. The space below the lowest floor must be free of obstructions (e.g., building element, equipment, or other fixed objects that can transfer flood loads to the foundation, or that can cause floodwaters or waves to be deflected into the building), or must be constructed with non-supporting breakaway walls, open lattice, or insect screening. c. The permitting department shall review the certificate(s) data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to certificate of occupancy issuance. d. In some instances, another certification may be required to certify corrected as-built construction. Failure to submit the certification or failure to make required corrections shall be cause to withhold the issuance of a certificate of occupancy. e. Documentation regarding completion and compliance with the requirements stated in the permit application and with 17-6(d)(2) of this chapter shall be provided to the city permitting department at the completion of construction. Failure to provide the required documentation shall be cause to withhold the issuance of a certificate of occupancy. f. All records that pertain to the administration of this chapter shall be maintained and made available for public inspection, recognizing that such information may be subject to the Privacy Act of 1974, as amended.

(Ord. No. 17-013-2020, 5-19-20)

Ask a question about Mobile law

Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.