Sec. 17-7. - Plans for commercial, residential and subdivision construction.
(a) A full set of construction plans, standards, design criteria and other specifications for commercial, residential and subdivision construction, including site grading and drainage plans, hereinafter in this section sometimes referred to as "the plan" or "plans" must be submitted to the city by all applicants for land disturbance and development permits. (b) Plans shall be accompanied by sufficient engineering calculations for verification of discharge of stormwater runoff and location and methods for erosion and sedimentation control. (c) Plans and supporting documentation shall be certified by a registered professional engineer licensed by the state that: (1) The plans provide for proper drainage of the project according to sound engineering principles; and (2) The post-development runoff rate does not exceed the pre-development runoff rate as established by the city engineer. (d) All data, engineering computations and plans submitted to the city shall be signed and sealed by a professional engineer licensed by the state. (e) No construction, whether by private or public action, shall be performed in such a manner as to increase the degree or potential for flooding in its vicinity or in other areas whether by increasing runoff volume or velocity or by diminishing channel or overbank storage capacity. (f) The plan shall include provisions for a design that will not cause the pre-development peak runoff rate from a ten-year storm to increase. (g) The plan shall provide stormwater detention/retention storage and/or channel improvement and/or other adequate measures as required by applicable design criteria adopted by the city and other specifications for the preparation of site grading and drainage plans. (h) For tier 1 land disturbance, a construction best management plan meeting the requirements of section 17-9 of this division will be required. For tier 2 land disturbance, an erosion control plan will be required. CBMPs shall be followed for all projects. (i) Plans for development sites of four thousand (4,000) square feet or more shall not allow stormwater which has been diverted from its pre-development natural flow to cross adjoining property lines unless: (1) a. Stormwaters drain into the city drainage system or a natural stream; and b. Stormwaters do not cause the pre-development peak runoff rate to increase; and c. The plan limits discharge to the pre-development flow from a ten-year frequency storm; or (2) a. A release is obtained from the owner of the adjoining property that releases the city from any claims arising from upstream development, runs with the land, and is recorded in the records of the probate court of the county; and b. Stormwaters do not cause the pre-development peak runoff rate to increase; and c. The plan limits discharge to the pre-development flow from a ten-year frequency storm; or (3) a. The plan design provides for retention for a one hundred-year frequency storm; and b. The plan limits discharge to the pre-development flow from a two-year frequency storm; and c. The engineer of record quantifies the pre-development velocity (feet/second) for a two-year frequency storm and certifies that the post-development velocity of stormwater released onto the adjacent property is equal to or less than the pre-development velocity. (j) For tier 1 and applicable tier 2 land disturbance projects, the operation and maintenance of the stormwater detention/retention facility shall be the responsibility of the owner/developer, its successors and assignees. The engineer of record shall be responsible for instructing the owner/developer, successors and assignees, in the proper operation and maintenance of the facility, see section 17-10 on maintenance and repair of stormwater facilities. (k) The city assumes no liability for the design, performance and operation of any stormwater detention/retention facilities, but, instead, in its review of plans relies on the professional judgment of the engineer or other licensed professional of record. (l) Development sites that are less than four thousand (4,000) square feet are exempt from the requirements of subsection (i) above; provided, however, that a development site may not be divided into parts of less than four thousand (4,000) square feet for the purpose of avoiding the requirements of subsection (9). (m) No plan shall contain a design that allows stormwater to flow across public rights-of-way unless authorized by the city engineer. (n) All construction plans will be required to comply with FEMA floodplain regulations as specified in division 2 of this chapter. (o) As-built certification. A State of Alabama licensed professional engineer must certify to the city engineer that all site construction, street construction, drainage facilities, erosion and sedimentation control measures, and their improvements are complete and functioning as required by the appropriate regulations and approved permits and plans.
(Ord. No. 17-013-2020, 5-19-20)