For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 64-4-7 — Above-ground oil storage tanks

Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code § 64-4-7

Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/f5f757dc-9dd0-48ff-a0c1-ec31882b3b64

Sec. 64-4-7. - Above-ground oil storage tanks.

A. Applicability. 1. Generally. This section applies to the location and construction of new above-ground oil storage tanks on and after March 29, 2016. This section supplements the requirements that otherwise apply under other provisions of the Mobile City Code to those tanks. 2. Site. For the purposes of this section, the term "site" shall mean the following: Land under common ownership or control located in an I-2 district being utilized in whole or in part after March 29, 2016, for the purpose of the operation of one or more above-ground oil storage tanks. 3. Conflict. If there is any conflict or inconsistency between the requirements of this section and the other requirements of the Mobile City Code, the requirements of this section control and shall govern. 4. Limited application of this section. (a) Applicable only to tanks as defined. This section shall apply only to above-ground oil storage tanks used for the storage of oil. Above-ground tanks for the storage of other substances are regulated by the otherwise applicable provisions of the Mobile City Code and state and federal law. No tank subject to this section may be converted to use for the storage of a substance other than oil without first obtaining the approvals otherwise required under the Mobile City Code for the storage of those other substances. (b) Inapplicable to existing tanks and sites. (1) Any site with tanks located on it as of March 29, 2016, is confirmed in its entirety for purposes of the zoning ordinance as a conforming permitted site and conforming permitted use with respect to all existing above-ground oil storage tanks on such sites. The above-ground oil storage tanks existing on those sites on March 29, 2016, are confirmed for purposes of the zoning ordinance as conforming structures. (2) An above-ground oil storage tank existing on a site on March 29, 2016 may be repaired, replaced or reconstructed on the same site without compliance with this section and without the need for any further conditional use permit approval, or compliance with the requirements of article 10. (3) The replacement for a tank existing March 29, 2016 need not have the identical footprint or configuration as the tank it replaces if the capacity of the replacement is not greater than the tank it replaces. (4) New tanks that are additional tanks and do not replace existing tanks: a. May be constructed on sites that: 1. Already have conditional use permit (or planning approval under previous versions of this chapter), or 2. Did not require conditional use permit or planning approval at the time constructed. b. New additional tanks subject to subsection a. above may be constructed only if: 1. A building permit is received, and 2. The tank complies with all then-existing regulatory requirements, and 3. The director is provided the information required by subsection D.1(b), (c), (d) and (e) below. B. Notice procedures. 1. Each application for a conditional use permit with respect to a tank shall be subject to the following notice requirements: (a) Each application for a conditional use permit for a tank, including all attachments to the application, shall be posted on the city's website at least thirty (30) days prior to the initial hearing on the application scheduled by the planning commission. (b) Notice of the filing of an application for a conditional use permit of a tank advising of the time and date of the initial hearing on the application scheduled by the planning commission shall be deposited by the director in the U.S. mail, first class postage prepaid, not less than thirty (30) days prior to the date of the initial hearing, addressed to all owners of assessed property located within three thousand (3,000) feet of the property line of the proposed site as shown on the current ad valorem tax assessment records of the county. The documented costs of such notice shall be paid by the applicant upon submission of the invoice of the director. (c) Notice of the filing of an application for a conditional use permit of a tank advising of the time and date of the initial hearing on the application scheduled by the planning commission shall be published by the director in a newspaper of general circulation in the city once a week for two (2) consecutive weeks prior the scheduled date of the initial hearing. The first such publication shall be at least thirty (30) days prior to the scheduled date of the initial hearing and the second such publication shall be at least eight (8) days prior to the scheduled date of the initial hearing. The notice shall contain both a diagram of the proposed tank site location and directions to the entire application posted on the city's website. The documented costs of such notice shall be paid by the applicant upon submission of the invoice of the director. C. Siting and design requirements. 1. Setback in ESA. The minimum setback for a tank to be constructed in the enhanced scrutiny area (ESA) is one thousand five hundred (1,500) feet measured from the tank to the property line of the nearest residentially zoned or occupied property, church or school. The setback may increase, as a condition of conditional use permit approval, on a case by case basis should specific circumstances or factors warrant. 2. Plan review. (a) Prior to the issuance of a building permit for any tank, all construction plans for the tank shall be reviewed by an independent professional engineer experienced in the design and construction of above ground storage tanks engaged by the city who must certify in writing to the director that the plans comply with all applicable construction standards and Code requirements. (b) The cost of such review as invoiced to the city shall be paid by the applicant as a condition to the issuance of the building permit. (c) The review must be completed within sixty (60) days of the submission of the permit application and plans. Otherwise the plans will be deemed compliant and the applicant will not be charged for the costs of such review. (d) As a further condition to the issuance of a tank building permit, at the time construction drawings are submitted, the applicant shall also submit its facility response plan (FRP) to the city and fire department prior to the issuance of the building permit. Any portions of the FRP that contain information that the Department of Homeland Security restricts the disclosure of, or which the applicant otherwise considers potentially sensitive, shall be redacted. D. Required content of applications for conditional use permit and application fee. 1. Application for tanks to be located in ESA. Each application for conditional use permit for an above-ground oil storage tank to be located in the ESA shall include: (a) A list of all permits and approvals required to complete the installation of the above-ground oil storage tank and the status of each such permit and approval at the time the application is filed; (b) A description of the type, maximum amount and National Fire Protection Association (NFPA) classification of the oil to be stored; (c) A description of the method or methods by which the oil will be transported to the tank site and the anticipated frequency of such transportation; (d) A description of all other materials being stored in bulk on the same site as the proposed tank; and (e) A detailed site plan, drawn to a standard engineering scale, illustrating the location of any and all improvements on the site, including but not limited to: existing and proposed tanks, existing and proposed structures, existing and proposed access drives and circulation drives; existing and proposed piers, docks or other mooring facilities; existing and proposed berms, dams or any other containment devices or method; and dimensions of the site, dimensions and capacity of each tank, dimensions from property line to tank(s), from containment to tank, from tank to tank and dimensions of access and circulation drives. 2. Description of any applicable vapor, emission or odor regulations. If the proposed tank is subject to federal or state best management practices regulations with respect to vapor, emissions, and/or odor control, the application for conditional use permit shall include a statement as to the relevant regulatory authority or authorities and a summary of any equipment and technology being implemented to comply with such regulatory requirements. 3. Tank approval application fee. The application fee for approval of a tank shall be one thousand five hundred dollars ($1,500.00) per tank. E. Change in oil product classification. Applicant may only store an oil product with a different NFPA 30 classification than the NFPA classification listed in the application for conditional use permit for the tank after providing written notice to the director of the change and engineering verification that the tank complies with the NFPA 30 requirements for the new product classification.

(Ord. No. 64-017-2022, 7-12-22)

Ask a question about Mobile law

Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.