§ 64-4-9 — Telecommunications facilities
Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code § 64-4-9
Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/33dd0e8b-a507-4a94-9632-bbac8f57459b
Sec. 64-4-9. - Telecommunications facilities.
A. Findings. 1. The Federal Communications Act of 1934, as amended by the Telecommunications Act of 1996, grants the Federal Communications Commission (FCC) exclusive jurisdiction over: (a) The regulation of the environmental effects of radio frequency emissions from telecommunications facilities; and, (b) The regulation of radio signal interference among users of the radio frequency spectrum. 2. The Telecommunications Act of 1996 preserved, with certain limitations, the city's land use and zoning authority concerning the placement, construction and modification of wireless telecommunications facilities. B. Applicability. 1. This section applies to telecommunications facilities located on private property. 2. This section does not apply to telecommunications facilities located on, or proposed to be located on, public rights-of-way or on city-owned property. Applications to locate telecommunications facilities on public rights-of-way or on city-owned property are submitted to the engineering department. 3. Utility companies that provide gas, electricity, water, or sewer services are not required to obtain a permit under this section for any facility that would otherwise require a class 1, class 2, or class 3 permit if those facilities are used exclusively for internal utility company communications related to the provision of utility services, such as (a) advanced metering infrastructure (also known as "smart metering" systems), (b) monitoring the security of utility sites and network systems, or (c) monitoring network usage, capacity, or performance. However, any such facility that would otherwise require a class 2 permit must comply with the general requirements for small wireless facilities set forth in section 64-4-10.E.8, and any such facility that would otherwise require a class 3 permit must comply with the general requirements set forth in section 64-4-10.F.7. C. Permit required. 1. Except as otherwise allowed, no person shall erect, modify, install or construct any telecommunications facilities without a permit. 2. To obtain a permit for telecommunications facilities located on private property, a person must submit an application to the planning department. 3. Permitted facilities shall comply with all structural and safety standards adopted by the city, including, but not limited to: AASHTO, MUTCD, International Building Code and International Electrical Code, as adopted by the city, city Code chapter 57, and city Code chapter 17, storm water management and flood control ordinance. 4. The following categories of permits are established: (a) Class 1. A class 1 permit is required for an eligible facilities request. (b) Class 2. A class 2 permit is required for any small wireless facility, whether that facility is associated with a new or existing support structure, that does not qualify as an eligible facilities request. (c) Class 3. A class 3 permit is required for any collocation of a wireless or other telecommunications facility other than a facility that is eligible for a class 1 or class 2 permit. (d) Class 4. A class 4 permit is required for any wireless or telecommunications facilities that are not eligible for a class 1, class 2 or class 3 permit. D. Application review process for class 1 permits. 1. The applicant for a class 1 permit must file an application that includes documentation that the proposed modification qualifies as an eligible facilities request. The application must include the following: (a) The name, address, phone number and e-mail address of the person preparing the application; (b) The name, address and phone number of the property owner and the applicant, including the legal name of the applicant. If the owner of the structure is different than the applicant, the name and all necessary contact information shall be provided; (c) An explanation of the reasons why the application qualifies as an eligible facilities request; (d) A description of the existing structure; (e) An explanation, utilizing and addressing the criteria set forth in 47 C.F.R. 1.6100(b)(7), of how the requested modification will not substantially change the physical dimensions of the existing structure, including certified drawings and an engineering statement demonstrating and certifying that the proposed facility qualifies as an eligible facilities request under applicable FCC rules; (f) Written commitment statements affirming that: (1) The applicant's facility shall always without exception be maintained in a safe manner, and in compliance with all conditions of the special use permit, as well as all applicable and permissible local codes, ordinances and regulations and all applicable city, state and federal laws, rules and regulations, unless specifically granted relief by the board of adjustment in writing; (2) The construction of the facility is legally permissible, including, but not limited to the fact that the applicant is licensed to do business in the State of Alabama. (g) A certification that all statements and information provided in the application or any supplement or amendment thereto are true and correct. 2. Timeframe for review. If the city finds that the application qualifies as an eligible facilities request, the city will approve the application within sixty (60) days of the date when the applicant satisfies both of the following criteria: (a) the applicant has submitted a written application that complies with the requirements of subparagraph 1 above, and (b) to the extent the applicant has not done so as part of its application, the applicant submits written documentation showing that a proposed modification is an eligible facilities request. This sixty-day period of time may be adjusted for any tolling as described in subparagraph 3 below. (a) The timeframe for review will begin to run when the application is submitted, but may be tolled (a) by mutual agreement, or (b) in cases where the city determines, consistent with subparagraph 3 below, that the application is incomplete. 3. Tolling period. To toll the timeframe for incompleteness, the city must provide written notice to the applicant within thirty (30) days of receipt of the application, clearly and specifically delineating all missing documents or information. The timeframe for review begins running again when the applicant makes a supplemental submission in response to the city's notice of incompleteness. Following a supplemental submission, the city will have ten (10) days to notify applicant that the supplemental submission did not provide the information identified in the original notice delineating missing information. The timeframe for review is tolled in the case of second or subsequent notices pursuant to the procedures identified in this paragraph. 4. All class 1 eligible facilities request permits, whether affirmatively granted by the city or "deemed granted" by operation of law, shall be subject to the conditions that (a) the facility is built in conformance to the specifications set forth in the application (in particular the specifications that qualify the facility as a class 1 eligible facilities request), (b) the facility complies with all structural and safety standards adopted by the city, and (c) the proposed modification or collocation will not defeat any existing concealment elements of, or existing aesthetic conditions imposed on, the existing structure. 5. To the extent federal law provides a "deemed granted" remedy for class 1 eligible facilities request permit applications not timely acted on by the city, the deemed grant shall not become effective until the applicant notifies the city in writing after the review period has expired (accounting for any tolling) that the application has been deemed granted. Any class 1 permit that is deemed granted by operation of applicable federal law shall be subject to the conditions set forth in subparagraph 4 above. 6. If the city determines that the application does not qualify as an eligible facilities request, the city will notify the applicant in writing of that determination and will process the application as either a class 2 or class 3 permit application. 7. Collocations. Collocations are permitted in any zoning district after administrative review and approval in accordance with the standards set forth in this chapter. 8. Removal of transmission equipment. The removal of transmission equipment shall be authorized upon the issuance of the required building or demolition permit. 9. Replacement of transmission equipment. The replacement of transmission equipment shall be authorized upon the issuance of a building permit. E. Application review process for class 2 permits. 1. Telecommunication facilities requiring a class 2 permit will be permitted by special exception subject to the standards set forth in this section. 2. Timeframe for review. Applications for class 2 permits will be acted on within the following timeframes. These periods of time may be adjusted for any tolling as described in subparagraph 3 below. (a) Applications for a class 2 permit to install a small wireless facility on an existing support structure: sixty (60) days. (b) Applications for a class 2 permit to deploy a small wireless facility on a new support structure: ninety (90) days. (c) The timeframe for review will begin to run when the application is submitted, but may be tolled (a) by written agreement between the applicant and the city, or (b) in cases where the city determines, consistent with subparagraph 3 below, that the application is incomplete. 3. Tolling period. (a) For an initial application to deploy small wireless facilities, if the city provides written notice to the applicant on or before the tenth day after submission of the application that the application is materially incomplete and clearly and specifically identifies the missing documents or information and the specific rule or regulation creating the obligation to submit such documents or information, the timeframe for review shall restart at zero on the date the applicant submits all the documents and information identified by the city to render the application complete. 4. The board of adjustment may approve, approve with conditions, or deny an application for a class 2 permit. The board's decision shall be in writing and supported by substantial evidence contained in a written record. 5. In addition to payment of all application fees, applicants shall also reimburse the city for reasonable costs incurred in reviewing the applications, including, but not limited to, the reasonable costs of engineers and other technical consultants. 6. Batched applications. Applicants or their agents of record may submit applications for multiple facilities or locations with the following conditions: (a) No single batched submittal shall contain more than ten (10) applications; (b) There must be a minimum of ten (10) calendar days between submittals of batched applications by the same applicant; (c) No more than three (3) batched applications per applicant shall be accepted in any thirty (30) consecutive-day period. (d) In the interest of time efficiency, the city reserves the right to negotiate the amount of batched applications that may be submitted by an applicant on large scale installations. The negotiation shall require the parties, the applicant and the city, to agree in writing to the process, time and the costs that will be required for the initial review of the project. 7. Application requirements. Applications for class 2 permits shall include the following. Any items that are deemed not applicable to the application shall be identified in a pre-application meeting prior to submission of the application. (a) The name, address, phone number and e-mail address of the person preparing the application. (b) The name, address and phone number of the property owner and the applicant, including the legal name of the applicant. If the owner of the structure is different than the applicant, the name and all necessary contact information shall be provided. (c) The nearest postal address and tax map parcel number of the property. (d) The zoning district or designation in which the property is situated. (e) To clarify the location of the proposed facility, the applicant shall submit the following: (1) GPS coordinates (latitude and longitude) in decimal degrees for the proposed small wireless facility location. (2) Street map identifying the specific location. (3) Street view photographic images of the location. (f) Certified drawings and an engineering statement demonstrating and certifying that the proposed facility qualifies as a small wireless facility under applicable FCC rules. (g) A general description of the proposed work and the purposes and intent of the proposed modifications or new facilities. The scope and detail of such description shall be appropriate to the nature and character of the work to be performed, with special emphasis on those matters likely to be affected or impacted by the work proposed. The description shall include the type of equipment, number of antennas, height to top of antenna(s), statement of compliance with FCC requirements and description and/or depiction of concealment and camouflage elements. (h) Written commitment statements affirming that: (1) The applicant's facility shall always without exception be maintained in a safe manner, and in compliance with all conditions of the special use permit, as well as all applicable and permissible local codes ordinances and regulations and all applicable city, state and federal laws, rules and regulations, unless specifically granted relief by the board of adjustment in writing; (2) The construction of the facility is legally permissible, including, but not limited to the fact that the applicant is licensed to do business in the State of Alabama; and (3) All statements and information provided in the application or any supplement or amendment thereto are true and correct. (i) Certified detailed construction drawings, including, but not limited to, the following information located within one hundred (100) feet from the new structure: the size of the property footprint on which the structure to be built or attached to is located, stated both in square feet and lot line dimensions, and a certified boundary survey completed by a professional land surveyor showing the location of all lot lines and rights-of-way. (j) Location of the nearest residential structure and habitable structure. (k) The location, size and height of all existing and proposed structures on the property that are more than ten (10) feet in height and are not buildings. (l) A detailed description of the enclosures and cabinets on the property on which the structure is located that are related to the subject of the application. (m) A site plan to-scale, showing the footprint of the support structure and the type, location and dimensions of access drives, landscaping, buffers, fencing, underground utilities of any kind and any easements. (n) Elevation drawings showing the profile or the vertical rendition of the facility and identifying all existing and proposed attachments and all related fixtures, structures, appurtenances and apparatus, including the height above the existing grade, materials, colors and lighting. Photo simulations may be required to be submitted with pictures of the proposed facility from key points surrounding the site. (o) Proposed electrical and grounding plans for the facility. (p) Cut sheets or specifications for all equipment to be installed and/or mounted on the structure. (q) Transmission and maximum effective radiated power of the antenna(s). (r) The azimuth, size, top of antenna height and location of all proposed and existing antennas on the support structure, including the height of the top of any equipment affixed to the top of the support structure. (s) A detailed description of the support structure and a structural analysis and report, including the calculations, certified by a professional engineer licensed in the state and proving the structure's capability to safely accommodate the facilities of the applicant. (t) A copy of the FCC licenses applicable for all the frequency bands licensed to the carrier to provide service in the city. (u) For any small wireless facility using a new structure: Provide a written certification that applicant was unable to co-locate on an existing structure and the reason(s), such as lack of an existing structure, lack of an existing structure meeting the technical needs of the carrier; or not being able to secure an attachment agreement with the owner. (v) A copy of the applicant's certificate of liability insurance. (w) For substantial modifications of existing structures whereby the height, profile or size of the facility is increased, or construction is needed outside the permitted compound or site, a detailed narrative explaining what changes are needed and why they are needed. 8. General requirements for small wireless facilities. (a) Small wireless facilities shall be located such that they do not interfere with public health, public usage or safety facilities, such as, but not limited to streets, sidewalks, alleys, parkways, public ways, fire hydrants, fire escapes, water valves, underground vaults or valve housing structures. (b) No equipment or work associated with a small wireless facility shall interfere with, endanger, hamper, impede or disturb access to any utility or any other facility located in the right-of-way. (c) No small wireless facility or accessory equipment shall be installed directly over any existing water or sewer main, service line or other utility, and shall comply with the city's regulations for clearances between utilities. (d) No small wireless facility, nor any work associated with such, shall interfere with, endanger, hamper or impede the usual and customary use of the right-of-way or any vehicular or pedestrian way. (e) No small wireless facility or accessory equipment shall materially interfere with the safe operation of traffic control equipment. (f) No small wireless facility or accessory equipment shall materially interfere with sight lines or clear zones for transportation, pedestrians or public safety purposes. (g) No small wireless facility or accessory equipment shall materially interfere with compliance with the Americans with Disabilities Act or similar federal or state standards regarding pedestrian access or movement. (h) No small wireless facility or accessory equipment shall be closer than eighteen (18) inches from the street curb or edge of pavement if no curb is present, unless otherwise approved by the city engineer. (i) No small wireless facility or accessory equipment shall be placed on any arms or any horizontal structure used to support or mount traffic control signals or devices. (j) No small wireless facility may be hung from energized lines or on poles to be removed in conjunction with the city's existing and approved plans to utilize undergrounding of electrical utilities in a particular area. (k) No small wireless facility or accessory equipment shall be located in a manner that interferes with plans for future roadway growth and expansion projects in the city. (l) No permit shall be issued for any small wireless facility or accessory equipment where the structure being attached to is in need of safety-related remediation to comply with the requirements of this chapter and/or other adopted standards of the city, unless and until all remediation work that is deemed needed has been completed or a schedule for the remediation work has been approved by the city. (m) For attachments to existing utility poles and light structures: (1) Unless it is technically infeasible, all antennas and accessory equipment mounted to existing utility poles and light structures shall be camouflaged, screened and/or obscured. Any attachment to an existing structure shall be in keeping with the nature and character of the surrounding area, neighborhood and/or the structure being attached to. (2) Unless it is found to be impracticable, all antennas shall be mounted on the top of a utility pole or light structure and appear as a vertical extension of the support structure. Unless it is technically infeasible, antennas shall be designed or placed in an enclosure. (3) The cabling and wiring for a small wireless facility, that is proposed on a wood support structure shall be placed in conduit. (4) The cabling and wiring for a small wireless facility that is proposed on a metal or non-conductive hollow pole shall be placed inside the pole. (n) For attachments to an existing building or other support structure: (1) All antennas and accessory equipment mounted to an existing building or other support structure shall be designed as a concealed facility. (2) Facade-mounted antennas shall not extend above the face of any wall or exterior surface of the building. (3) Roof-mounted antennas and accessory equipment may be permitted on buildings and shall comply with the height requirements set forth in subsection (q) below. (4) For antennas greater than two (2) feet in height, roof-mounted antennas and accessory equipment shall be set back from the edge of roof, one (1) foot for every foot of height of the equipment above roof. (o) For new support structures: (1) New monopoles, utility poles, or light structures that are installed for the purpose of small wireless facilities shall be designed as a decorative structure or concealed. (2) All new support structures shall be hollow metal or made of a non-conductive, non-corrodible material. (3) Unless it is technically infeasible, all antennas and related mounted equipment shall be camouflaged, screened and/or obscured. (4) Unless mounting a particular antenna at the top of an existing support structure is found to be technically infeasible or the antenna is designed as a stealth facility, all antennas shall be mounted on the top of the support structure and appear as a vertical extension of the support structure. Unless it is technically infeasible, antennas shall be designed or placed in an enclosure designed to improve the appearance of the site and protect the antennas. (5) The cabling and wiring for a small wireless facility that is proposed on a metal or non-conductive hollow pole shall be placed inside the pole. (6) Accessory equipment shall be mounted on the support structure, on the ground or underground. Accessory equipment shall be placed in an enclosure. (7) Any new small wireless facility support structure shall be no closer than three hundred (300) feet away, laterally, from another pre-existing small wireless facility support structure. This horizontal spacing requirement may be modified or waived for a particular new small wireless facility support structure if the applicant demonstrates that it would be effectively prohibited from providing either personal wireless service or telecommunications service as a result of the three hundred-foot separation requirement. (p) Aesthetics/appearance: (1) Small wireless facilities shall be designed to blend into the surrounding environment and complement existing streetscape elements or structures through the use of color, camouflaging, architectural treatment and/or concealment techniques. Any equipment mounted to the support structures shall also match the support structure in color and general design unless a different color is needed for public safety or service reliability reasons. A small wireless facility shall not be easily recognizable as a wireless facility by a layperson. (2) All antennas shall be mounted on the top of the support structure, unless doing so is technically infeasible or not permissible under applicable safety standards and regulations. (3) The space between the top of the structure and the attachment point of the antenna shall be concealed with a weather-proof material the same color as the structure or the antenna. (4) There shall be no signage placed by the owner of any support structure or by any service provider on or in the vicinity of any support structure, other than a four-inch by six-inch (maximum) plate with the owner's name, location identifying information and emergency telephone number permanently affixed to the shroud or as may be required by state or federal law or rule or safety code. All signs shall be of the minimum size allowed by law, rule or regulation. (5) Except where the support structure is a light pole, a traffic light stanchion, or where lighting is required by applicable law, the facility or associated equipment shall not be illuminated. (q) Height: (1) Proposed attachments to an existing structure shall not extend the height of the existing structure to a height of more than fifty (50) feet, or by more than ten (10) percent of the pre-existing height of the structure, whichever is greater. (2) The structure on which a new small wireless facility is located shall not be more than ten (10) percent higher than existing adjacent structures located within five hundred (500) feet of the proposed structure, including any attachment of any kind associated with the wireless facility, and shall never be more than thirty-five (35) feet in height on residentially zoned property or more than fifty (50) feet in height on property in zoning districts B-1, B-2, LB-2 or B-3, including any attachments of any kind associated with the wireless facility. (3) No antenna or other part of the facility shall extend more than six (6) feet above the structure. (r) Size: (1) Each antenna shall not exceed three (3) cubic feet in volume. (2) All accessory equipment associated with the facility shall cumulatively not exceed twenty-eight (28) cubic feet in volume. F. Application review process for class 3 permits. 1. Telecommunication facilities requiring a class 3 permit will be permitted by special exception subject to the standards set forth in this section. 2. Timeframe for review. Applications for class 3 permits will be acted on within the following timeframes. These periods of time may be adjusted for any tolling as described in subparagraph 3 below. (a) Applications for a class 3 permit to collocate a facility other than a small wireless facility using an existing structure: ninety (90) days. (b) The timeframe for review will begin to run when the application is submitted, but may be tolled (a) by written agreement between the applicant and the city, or (b) in cases where the city determines, consistent with subparagraph 3 below, that the application is incomplete. 3. Tolling period. (a) If the city provides written notice to the applicant within thirty (30) days of the date when the application was submitted that the application is materially incomplete and clearly and specifically identifies the missing documents or information that the applicant must submit to render the application complete and the specific rule or regulation creating the obligation to submit such documents or information, the timeframe for review shall be tolled from the day after the date that the city provides the written notice until the date when the applicant submits all the documents and information identified by the city to render the application complete. The timeframe for review begins running again when the applicant makes the supplemental submission in response to the city's notice of incompleteness. Following a supplemental submission, the city has ten (10) days to notify the applicant that the supplemental submission did not provide the documents and information identified in the original notice. 4. The board of adjustment may approve, approve with conditions or deny an application for a class 3 permit. The board's decision shall be in writing and supported by substantial evidence contained in a written record. 5. In addition to payment of application fees, applicants shall also reimburse the city for reasonable costs incurred in reviewing the applications, including, but not limited to, the reasonable costs of engineers and other technical consultants. 6. Application requirements. Applications for class 3 permits, shall include the following. Any items that are deemed not applicable to the application shall be identified in a pre-application meeting prior to the submission of the application. (a) The name, address, phone number and e-mail address of the person preparing the application. (b) The name, address and phone number of the property owner and the applicant, including the legal name of the applicant. if the owner of the structure is different than the applicant, the name and all necessary contact information shall be provided. (c) The nearest postal address and tax map parcel number of the property. (d) The zoning district or designation in which the property is situated. (e) To clarify the location of the proposed facility, the applicant shall submit the following: (1) GPS coordinates (latitude and longitude) in decimal degrees for the proposed small wireless facility location. (2) Street map identifying the specific location. (3) Street view photographic images of the location. (f) A general description of the proposed work and the purposes and intent of the proposed modifications or new facilities. The scope and detail of such description shall be appropriate to the nature and character of the work to be performed, with special emphasis on those matters likely to be affected or impacted by the work proposed. The description shall include the type of equipment, number of antennas, height to top of antenna(s), statement of compliance with FCC requirements and description and/or depiction of concealment and camouflage elements. (g) Written commitment statements affirming that: (1) The applicant's facility shall always without exception be maintained in a safe manner, and in compliance with all conditions of the special use permit, as well as all applicable and permissible local codes, ordinances and regulations and all applicable city, state and federal laws, rules and regulations, unless specifically granted relief by the board of adjustment in writing; (2) The construction of the facility is legally permissible, including, but not limited to the fact that the applicant is licensed to do business in the State of Alabama. (3) All statements and information in the application and any supplements or amendments thereto are true and correct. (h) Certified detailed construction drawings, including, but not limited to, the following information located within one hundred (100) feet from the new structure: the size of the property footprint on which the structure to be built or attached to is located, stated both in square feet and lot line dimensions, and a certified boundary survey completed by a professional land surveyor showing the location of all lot lines and rights-of-way. (i) Location of the nearest residential structure and habitable structure. (j) The location, size and height of all existing and proposed structures on the property that are more than ten (10) feet in height and are not buildings. (k) A detailed description of the enclosures and cabinets on the property on which the structure is located that are related to the subject of the application. (l) A site plan to-scale, showing the footprint of the support structure and the type, location and dimensions of access drives, landscaping, buffers, fencing, underground utilities of any kind and any easements. (m) Elevation drawings showing the profile or the vertical rendition of the facility and identifying all existing and proposed attachments and all related fixtures, structures, appurtenances and apparatus, including the height above the existing grade, materials, colors and lighting. Photo simulations may be required to be submitted with pictures of the proposed facility from key points surrounding the site. (n) Proposed electrical and grounding plans for the facility. (o) Cut sheets or specifications for all equipment to be installed and/or mounted on the structure. (p) Transmission and maximum effective radiated power of the antenna(s). (q) The azimuth, size, top of antenna height and location of all proposed and existing antennas on the support structure, including the height of the top of any equipment affixed to the top of the support structure. (r) A detailed description of the support structure and a structural analysis and report, including the calculations, certified by a professional engineer licensed in the state and proving the structure's capability to safely accommodate the facilities of the applicant. (s) A copy of the FCC licenses applicable for all the frequency bands licensed to the carrier to provide service in the city. (t) A copy of the applicant's certificate of liability insurance. (u) For substantial modifications of existing structures whereby the height, profile or size of the facility is increased, or construction is needed outside the permitted compound or site, a detailed narrative explaining what changes are needed and why they are needed. 7. General requirements. (a) For attachments to existing utility poles and light structures: (1) Unless it is technically infeasible, all antennas and accessory equipment mounted to existing utility poles and light structures shall be camouflaged, screened and/or obscured. Any attachment to an existing structure shall be in keeping with the nature and character of the surrounding area, neighborhood and/or the structure being attached to. (2) Unless it is found to be impracticable, all antennas shall be mounted on the top of a utility pole or light structure and appear as a vertical extension of the support structure. Unless it is technically infeasible, antennas shall be designed or placed in an enclosure. (3) Cabling and wiring that is proposed on a wood support structure shall be placed in conduit. (4) Cabling and wiring that is proposed on a metal or non-conductive hollow pole shall be placed inside the pole. (b) For attachments to an existing building or other support structure: (1) All antennas and accessory equipment mounted to an existing building or other support structure shall be designed as a concealed facility. (2) Facade-mounted antennas shall not extend above the face of any wall or exterior surface of the building. (3) Roof-mounted antennas and accessory equipment may be permitted on buildings and shall comply with height requirements set forth in subsection (e) below. (4) For antennas greater than two (2) feet in height, roof-mounted antennas and accessory equipment shall be set back from the edge of roof, one (1) foot for every foot of height of the equipment above roof. (c) For support structures, antennas and accessory equipment: (1) All new support structures shall be hollow metal or made of a non-conductive, non-corrodible material. (2) All antennas shall be mounted on the top of the support structure, unless doing so is technically infeasible or not permissible under applicable safety standards and regulations. (3) Unless it is technically infeasible, all antennas and related mounted equipment shall be camouflaged, screened and/or obscured. (4) Unless mounting a particular antenna at the top of the support structure is found to be technically infeasible or the antenna is designed as a stealth facility, all antennas shall be mounted on the top of the support structure and appear as a vertical extension of the support structure. Unless it is technically infeasible, antennas shall be designed or placed in an enclosure designed to improve the appearance of the site and protect the antennas. (5) Accessory equipment shall be mounted on the support structure, on the ground or underground. Accessory equipment shall be placed in an enclosure. (d) For aesthetics and appearance: (1) Facilities shall be designed to blend into the surrounding environment and complement existing streetscape elements or structures through the use of color, camouflaging, architectural treatment and/or concealment techniques. Any equipment mounted to the support structures shall also match the support structure in color and general design unless a different color is needed for public safety or service reliability reasons. (2) The space between the top of the structure and the attachment point of the antenna shall be concealed with a weather-proof material the same color as the structure or the antenna. (3) There shall be no signage placed by the owner of any support structure or by any service provider on or in the vicinity of any support structure, other than a four-inch by six-inch (maximum) plate with the owner's name, location identifying information and emergency telephone number permanently affixed to the shroud or as may be required by state or federal law or rule or safety code. All signs shall be of the minimum size allowed by law, rule or regulation. (4) Except where the support structure is a light pole, a traffic light stanchion, or where lighting is required by applicable law, the facility or associated equipment shall not be illuminated. (e) Height: (1) Proposed attachments to an existing structure shall not extend the height of the existing structure to a height of more than fifty (50) feet, or by more than ten (10) percent of the pre-existing height of the structure, whichever is greater. (2) The structure on which the facility is located shall not be more than ten (10) percent higher than existing adjacent structures located within five hundred (500) feet of the proposed structure, including any attachment of any kind associated with the wireless facility and shall never be more than thirty-five (35) feet in height on residentially zoned property or more than fifty (50) feet in height on property in zoning districts B-1, B-2, LB-2 or B-3, including any attachments of any kind associated with the facility. (3) No antenna or other part of the facility shall extend more than six (6) feet above the structure. (f) Size: (1) Each antenna shall not exceed three (3) cubic feet in volume. (2) All accessory equipment associated with the facility shall cumulatively not exceed twenty-eight (28) cubic feet in volume. G. Application review process for class 4 permits. 1. Telecommunications facilities requiring a class 4 permit are allowed by right in zoning districts ML, MH, I-1, and I-2, and will be permitted by special exception in zoning districts B-1, LB-2, B-2, B-3, B-4, B-5, CW, and MM. 2. Timeframe for review. Applications for class 4 permits will be acted on within 150 days, adjusted for any tolling as described in paragraph (3) below. (a) The timeframe for review will begin to run when the application is submitted, but may be tolled (a) by written agreement between the applicant and the city, or (b) in cases where the city determines, consistent with subparagraph 3 below, that the application is incomplete. 3. Tolling period. If the city provides written notice to the applicant within thirty (30) days of the date when the application was submitted that the application is materially incomplete and clearly and specifically identifies the missing documents or information that the applicant must submit to render the application complete and the specific rule or regulation creating the obligation to submit such documents or information, the timeframe for review shall be tolled from the day after the date that the city provides the written notice until the date when the applicant submits all the documents and information identified by the city to render the application complete. The timeframe for review begins running again when the applicant makes the supplemental submission in response to the city's notice of incompleteness. Following a supplemental submission, the city has ten (10) days to notify the applicant that the supplemental submission did not provide the documents and information identified in the original notice. Applications may also be tolled by mutual agreement of the city and the applicant. 4. The board of adjustment may approve, approve with conditions or deny an application for a class 4 permit. The board's decision shall be in writing and supported by substantial evidence contained in a written record. 5. In addition to payment of application fees, applicants shall also reimburse the city for reasonable costs incurred in reviewing the applications, including, but not limited to, the reasonable costs of engineers and other technical consultants. 6. Application requirements. Applications for class 4 permits, including applications to develop a tower shall include the following. Any items that are deemed not applicable to the application shall be identified in a pre-application meeting prior to the submission of the application. (a) The name, address, telephone number and email address of (i) the applicant, (ii) the person preparing the application (if not the applicant) and (iii) the owner and lessee of the parcel of land upon which the tower is situated (if not the applicant). If the applicant is not the owner of the parcel of land upon which the tower is situated, the written consent of the owner shall be evidenced in the application. (b) The legal description, parcel identification number, key number and address of the parcel of land upon which the tower is situated. (c) The names, addresses and telephone numbers of all owners of other towers, existing structures, or other usable antenna support structures within a one-half mile radius of the proposed new tower site, including city-owned property. (d) Written documentation that the applicant: (1) made diligent, but unsuccessful efforts prior to the submission of the application to install or collocate the applicant's telecommunications facilities on towers, existing structures or other usable antenna support structures owned by the city and other persons located within a one-half mile radius of the proposed tower site; or (2) written, technical certification from a professional engineer that the proposed tower or telecommunications facilities cannot be installed or collocated on an existing structure, tower or usable antenna support structure located at the proposed site or within a one-half mile radius of the proposed site in order to meet the coverage requirements of the applicant's wireless communications system. (e) Written, technical evidence from a professional engineer that the proposed structure meets the structural requirements of this section. (f) Proposed electrical and grounding plans for the facility. (g) Written, technical evidence from an engineer that the proposed site of the tower or telecommunications facilities does not pose a risk of explosion, fire or other danger due to its proximity to volatile, flammable, explosive or hazardous materials such as LP gas, propane, gasoline, natural gas or corrosive or other dangerous chemicals within the site. (h) A detailed description of the support structure and a structural analysis and report, including the calculations, certified by a professional engineer licensed in the state and proving the structure's capability to safely accommodate the facilities of the applicant. (i) A copy of the FCC licenses applicable for all the frequency bands licensed to the carrier to provide service in the city. (j) A copy of the applicant's certificate of liability insurance. (k) Written commitment statements affirming that: (1) The applicant's facility shall always without exception be maintained in a safe manner, and in compliance with all conditions of the special use permit, as well as all applicable and permissible local codes, ordinances and regulations and all applicable city, state and federal laws, rules and regulations, unless specifically granted relief by the board of adjustment in writing; (2) The construction of the facility is legally permissible, including, but not limited to the fact that the applicant is licensed to do business in the State of Alabama. (3) All statements and information in the application and any supplements or amendments thereto are true and correct. (l) Certified detailed construction drawings, including, but not limited to, the following information located within one hundred (100) feet from the new structure: the size of the property footprint on which the structure to be built or attached to is located, stated both in square feet and lot line dimensions, and a certified boundary survey completed by a professional land surveyor showing the location of all lot lines and rights-of-way. (m) Location of the nearest residential structure and habitable structure. (n) The location, size and height of all existing and proposed structures on the property that are more than ten (10) feet in height and are not buildings. (o) A detailed description of the enclosures and cabinets on the property on which the structure is located that are related to the subject of the application. (p) A site plan to-scale, showing the footprint of the support structure and the type, location and dimensions of access drives, landscaping, buffers, fencing, underground utilities of any kind and any easements. (q) Elevation drawings showing the profile or the vertical rendition of the facility and identifying all existing and proposed attachments and all related fixtures, structures, appurtenances and apparatus, including the height above the existing grade, materials, colors and lighting. Photo simulations may be required to be submitted with pictures of the proposed facility from key points surrounding the site. (r) Cut sheets or specifications for all equipment to be installed and/or mounted on the structure. (s) A map of the city and the first half-mile of all bordering communities showing the location of the proposed tower and surrounding antenna sites operated by the applicant. (t) A certificate from a professional engineer documenting collocation capability of the applicant's telecommunications tower. (u) An accurate photo simulation depicting how the tower would appear as proposed. (v) If the applicant alleges that failure to approve the application will result in unreasonable discrimination among providers of functionally equivalent services pursuant to 47 U.S.C. 332(c)(7)(B)(i)(I) and/or that failure to approve the application will prohibit or have the effect of prohibiting personal wireless services pursuant to 47 U.S.C. 332(c)(7)(B)(i)(II), the applicant must so state on the application and provide documentation in support of this claim. 7. Development of towers. (a) Towers are allowed as follows: (1) A tower shall be a permitted use "by right" in zoning districts I-1, I-2, ML and MH, subject to compliance with all the requirements of this chapter and the granting of a special exception by the board of adjustment. (2) A tower shall be permitted by special exception in zoning districts B-1, B-2, LB-2, B-3, B-4, B-5, CW and MM. (3) Unless the applicant can demonstrate that denial of an application for a tower at the particular proposed location will effectively prohibit the provision of telecommunications service or personal wireless service, a tower shall be a prohibited use in zoning districts R-A, R-1, R-2, R-3, R-B, T-B and H-B, and in historic districts. (b) No person shall build, erect or construct a tower upon any plot of land within any zoning district unless all required permits and approvals have been obtained. (c) Towers shall be permitted to a height not to exceed one hundred eighty (180) feet in I-1 and I-2 zoning districts. Towers may be permitted in excess of the maximum height allowed for the zoning district in which it is located if granted a variance by the board of adjustment in accordance with paragraph 21 below. (d) The city may authorize the use of city property for towers or other telecommunications facilities in appropriately zoned districts in accordance with applicable law; however, the city shall have no obligation whatsoever to permit the use of city property for such purposes. (e) No new tower shall be built, constructed or erected in the city unless such tower is capable of supporting another person's operating telecommunications facilities comparable in weight, size and surface area to applicant's final design. For the purposes of this paragraph, applicant's final design shall mean the telecommunications facilities on the applicant's tower within six (6) months of the completion of tower construction. (f) Setback requirements for towers shall be measured from the base of the tower to the line of the lease parcel on which it is located. All towers shall be set back as follows: (1) For I-1, I-2, ML and MH districts, the setback shall be on all sides a distance equal to the underlying setback requirement for the particular zoning district. (2) For B-1, B-2, LB-2, B-3, B-4, B-5, CW and MM districts, the setback on all sides shall be a distance equal to the height of the tower. 8. Structural requirements. (a) All towers must be designed and certified by a professional engineer to be structurally sound and, at minimum, in conformance with the current building code as adopted by the city, as may be amended from time to time, and any other standards outlined in this section. (b) Towers must be located and equipped with step bolts and ladders so as to provide ready access for inspection purposes. (c) Guy wires or other tower accessories must not cross or encroach upon any street or other public place or over any electric power lines or encroach upon any other privately owned property without written consent of the owner. (d) All towers must be constructed of approved corrosion resistant non-combustible material. The minimum type of construction for isolated radio towers, not more than one hundred (100) feet in height, must be of type 4. (e) Towers must be designed to resist wind loads in accordance with EIA/TIA-222-F series. Consideration must be given to conditions involving wind loads on ice-covered sections and localities subject to sustained freezing temperatures; and (f) All towers must be permanently and effectively grounded. 9. Separation or buffer requirements. (a) Towers shall be separated from all buildings and dwelling structures on residentially zoned lands, including R-B and H-B, by a minimum of two hundred (200) feet or one hundred fifty (150) percent of the height of the proposed tower, whichever is greater. (b) Tower separation distances for the purposes of compliance with this subsection shall be measured from the base of a tower to the closest point of residentially zoned land. 10. Method of determining tower height. Except as otherwise provided for eligible facilities requests, measurement of tower height for the purpose of determining compliance with all requirements of this subsection shall include the tower structure itself, the base pad and any other telecommunications facilities attached thereto. Tower height shall be measured from grade. 11. Illumination. Towers shall not be artificially lighted except as required by FAA. Upon commencement of construction of a tower, in cases where there are residential uses located within a distance which is three hundred (300) percent of the height of the tower from the tower, and when required by federal law, dual mode lighting shall be requested from the FAA. 12. Fencing. Any fences constructed around or upon parcels containing towers, antenna support structures, or telecommunications facilities shall be constructed in accordance with the fencing requirements as defined by the zoning district and the chart of permitted uses where the tower, structure or facility is located, unless more stringent fencing requirements are required by FCC regulations. 13. Landscaping. All landscaping on parcels containing towers, antenna support structures or telecommunications facilities shall be in accordance with the applicable landscaping requirements in the zoning district where the tower, structure or facility is located. 14. Noise. No equipment shall be operated at towers and telecommunication facilities so as to produce noise in excess of the applicable noise standards under WAC 173-60, except during emergencies, or periodic routine maintenance which requires the use of a backup generator, where the noise standards may be exceeded temporarily. 15. Electromagnetic radiofrequency emissions. (a) The FCC has sole jurisdiction to regulate radiofrequency (RF) emissions, and telecommunications towers which meet the FCC standards shall not be conditioned or denied on the basis of RF impacts. (b) In order to provide information to its citizens, copies of ongoing FCC information concerning telecommunication towers and facilities and radiofrequency emission standards shall be made available. Applicants for tower sites shall be required to provide information on the projected power density of the facility and how this meets the FCC standards. 16. Access. All parcels upon which towers are located must provide paved access to at least one (1) paved vehicular parking space on site, except I-2 districts. 17. Maintenance. (a) Facility owners shall at all times employ ordinary and reasonable care and shall install and maintain in use nothing less than commonly accepted methods and devices for preventing failures and accidents which are likely to cause damage, injuries or nuisances to the public. (b) Facility owners shall install and maintain towers, telecommunications facilities, wires, cables, fixtures and other equipment in substantial compliance with the requirements of the National Electric Safety Code and all FCC, state and local regulations, and in such manner that will not interfere with the use of other property. (c) All towers, telecommunications facilities and antenna support structures shall at all times be kept and maintained in good condition, order, and repair so that the same shall not menace or endanger the life or property of any person. (d) In the event the use of a tower or other telecommunications facility is discontinued, or if the owner ceases to operate the tower or facility, the owner shall provide written notice to the city of its intent to discontinue use or cease operations, and the date when the use shall be or was discontinued. 18. Camouflage and aesthetics. Unless it is technically infeasible, wireless facilities, support structures, antennas and related facilities shall meet the following requirements: (a) They shall be designed and placed in such a manner so as to be screened to minimize their distraction from surrounding properties and public rights-of-way. This shall include the color of the tower, antenna or related facility, the materials and textures of such tower, antenna or related facilities, and the materials or devices used to screen, conceal or blend the tower, antenna or related facility into or with the surrounding properties and development. (b) Along the right-of-way, the design of the related facilities shall, to the extent possible, use materials, colors, textures, screening and landscaping that will blend them into the natural setting and surrounding buildings. (c) If an antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment must make the antenna and related equipment as visually unobtrusive as possible. (d) Wireless facilities and support structures shall be designed and constructed to be stealth/camouflaged. The terms stealth or camouflage shall mean the following: (1) The nature of design and construction do not draw undue attention to the structure; (2) Design and construction cannot clearly be distinguished from the general character of the area in which they are located; and (3) Design and construction do not cause a conflict with the appearance, character and aesthetics of the site upon which the facility is located, the surrounding properties or the general neighborhood in which they are located. (e) Methods of achieving stealth/camouflage may include: (1) Ensuring that physical design and construction are concealed within an architecturally designed feature/structure newly constructed on site, which matches or compliments the existing main structures on-site and in the surrounding area. (2) Locating the facility/tower and associated antenna/supporting equipment on or within an existing structure or building already on a site with no obviously distinguishable changes to that structure. (f) Wireless facilities and support structures in historic districts shall be consistent with the design standards for historic districts, see city Code, chapter 44, article IV. 19. Telecommunications facilities on antenna support structures. (a) Any telecommunications facilities which are not attached to a tower may be permitted as an accessory use to any antenna support structure at least forty-five (45) feet tall, regardless of the zoning restrictions applicable to the zoning district where the structure is located. Except for an eligible facilities request for a modification of an existing structure that does not substantially change the physical dimensions of the structure, telecommunications facilities are prohibited on all other structures. The owner of the structure on which the proposed telecommunications facilities would be installed shall, by written certification, establish the following at the time plans are submitted for a building permit that: (1) The telecommunications facilities shall not extend more than twenty (20) feet above the maximum height of the antenna support structure; (2) The antenna support structure and telecommunications facilities comply with the current building code as adopted by the city, as may be amended from time to time; and (3) Any telecommunications facilities and their appurtenances located upon the roof of an antenna support structure, are set back at least one (1) foot from the edge of the roof of the antenna support structure. However, this setback requirement shall not apply to: a. Telecommunications facilities and their appurtenances located above the roof of an antenna support structure if such facilities are appropriately screened from view through the use of panels, walls, fences or other screening techniques approved by the city. b. Camouflage antennas which are mounted to the exterior of antenna support structures below the roof, but which do not protrude more than twenty-four (24) inches from the side of such an antenna support structure. (b) Telecommunications facilities shall not be prohibited as described in subparagraph 19(a)(1)—(3) where the application is for a class 1 eligible facilities request, or where the applicant can demonstrate that denial of the application would violate 47 U.S.C. 332(c)(7)(B)(i)(I) or (II). 20. Existing towers. (a) An existing tower may be modified, or demolished and rebuilt to accommodate collocation of additional telecommunications facilities as follows: (1) No person shall build, erect, or construct a tower upon any plot of land unless required building permits and approvals have been obtained from the city. (2) The total height of the modified tower and telecommunications facilities attached thereto shall not exceed the current height of the tower or the maximum height allowed under this section. Certification by a structural engineer shall be required to meet collocation standards. (3) A tower which is being rebuilt to accommodate the collocation of additional telecommunications facilities may be relocated on the same parcel subject to the setback requirements of this section. However, if it is impossible for the tower to be rebuilt in compliance with the setback requirements of this section, such setback requirement may be waived or modified as part of a site plan development variance by the board of adjustment to allow the tower to be rebuilt in its exact previous location, or within a twenty-five-foot radius of the previous location. 21. Criteria for site plan development modifications. (a) Upon application as provided in this chapter, the board of adjustment may grant approval of a site plan development variance if the applicant demonstrates with written evidence that: (1) The location, shape, appearance or nature of use of the proposed tower will not substantially detract from the aesthetics of the area nor change the character of the neighborhood in which the tower is proposed to be located; and (2) The site plan development modification will not create any threat to the public health, safety or welfare. (b) In addition to the requirements of subparagraph 21(a) of this subsection, in the following cases, the applicant must also demonstrate with written evidence, the following: (1) In the case of a requested modification to the setback requirement, that the area of the parcel of land upon which the tower is proposed to be located makes compliance with the setback requirements impossible, and the only alternative for the person is to locate the tower at another site which poses a greater threat to the public health, safety or welfare or is closer in proximity to a residentially zoned land; and (2) In the case of a requested modification of the height limit, that the modification is necessary to (i) facilitate collocation of telecommunications facilities in order to avoid construction of a new tower; or (ii) meet the coverage requirements of the applicant's wireless communications system, which requirements must be documented with written, technical evidence from an electrical engineer(s).
(Ord. No. 64-017-2022, 7-12-22)
Ask a question about Mobile law
Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.
