§ 64-4-8 — Hazardous substance storage tanks

Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code § 64-4-8

Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/d67cb87c-cd5b-4068-9186-0cab46b418b5

Sec. 64-4-8. - Hazardous substance storage tanks.

A. Applicability. 1. Generally. This section applies to the location and construction of new above-ground hazardous substance storage tanks which do not contain oil. This section supplements the requirements that otherwise apply under other provisions of the Mobile City Code to those tanks. 2. Conflict. If there is any conflict or inconsistency between the requirements of this section and the other requirements of the Mobile City Code, the requirements of this section control and shall govern. 3. Limited application of this section. (a) Applicable only to tanks as defined. This section shall apply to new above-ground hazardous substance storage tanks. No tank subject to this section may be converted to use for the storage of any other substance without first obtaining the approvals otherwise required under the Mobile City Code for the storage of those other substances. (b) Inapplicable to existing tanks and sites. (1) Any site with tanks located on it as of the effective date of this chapter, which received planning approval and/or special exception under previous versions of this chapter, is confirmed in its entirety for purposes of this chapter as a conforming permitted site and use as documented by the approved planning approval and/or special exception with respect to all above-ground hazardous substance storage tanks. The above-ground hazardous substance storage tanks existing on those sites as of the effective date of this chapter are confirmed as conforming structures. (2) An above-ground hazardous substance storage tank existing on the effective date of this chapter and located on a site in compliance with a planning approval and/or special exception granted under previous versions of this chapter, may be repaired, replaced or reconstructed on the same site in compliance with that previous approval, without the need for any further conditional use permit. B. Notice procedures. 1. Each application for a conditional use permit with respect to an above-ground hazardous substance storage tank shall be subject to the following notice requirements: (a) The application shall be posted on the city's website at least thirty (30) days prior to the initial hearing on the application. (b) Notice of the filing of the application advising of the time and date of the initial hearing shall be sent by first class U.S. mail, not less than thirty (30) days prior to the date of the initial hearing to all owners of assessed property located within three thousand (3,000) feet of the property line of the proposed site as shown on the current ad valorem tax assessment records of the county. The documented costs of such notice shall be paid by the applicant upon submission of the invoice. (c) Notice of the time and date of the initial hearing on the application shall be published in a newspaper of general circulation in the city once a week for two (2) consecutive weeks prior the scheduled date of the initial hearing. The first such publication shall be at least thirty (30) days prior to the scheduled date of the initial hearing and the second such publication shall be at least eight (8) days prior to the scheduled date of the initial hearing. The notice shall contain both a map depicting the location of the site and directions to the entire application posted on the city's website. The documented costs of such notice shall be paid by the applicant upon submission of the invoice. C. Siting and design requirements. 1. Setback. The minimum setback for a tank is one thousand five hundred (1,500) feet measured from the tank to the property line of the nearest residentially zoned or occupied property, church or school. The setback may increase, as a condition of conditional use permit approval, on a case by case basis should specific circumstances or factors warrant. 2. Plan review. (a) Prior to the issuance of a building permit for any above-ground hazardous substance storage tank, all construction plans for the tank shall be reviewed by an independent professional engineer experienced in the design and construction of above ground hazardous substance storage tanks engaged by the city who must certify in writing to the director that the plans comply with all applicable construction standards and Code requirements. (b) The cost of such review as invoiced to the city shall be paid by the applicant as a condition to the issuance of the building permit. (c) The review must be completed within sixty (60) days of the submission of the permit application and plans. Otherwise the plans will be deemed compliant and the applicant will not be charged for the costs of such review. (d) At the time construction drawings are submitted, the applicant shall also submit its facility response plan (FRP) to the city and fire department. Any portions of the FRP that contain information that the Department of Homeland Security restricts the disclosure of, or which the applicant otherwise considers potentially sensitive, may be redacted. D. Required content of applications for conditional use permit and application fee. 1. Application requirements. Each application for conditional use permit for an above-ground hazardous substance storage tank shall include: (a) A list of all permits and approvals required to complete the installation of the tank(s) and the status of each such permit and approval at the time the application is filed; (b) A description of the type, maximum amount and National Fire Protection Association (NFPA) classification of the substance(s) to be stored; (c) A description of the method by which the substance(s) will be transported to the site and the anticipated frequency of such transportation; (d) A description of all other materials being stored in bulk on the site; and (e) A detailed site plan, drawn to a standard engineering scale, illustrating the location of any and all improvements on the site, including but not limited to: existing and proposed tanks, existing and proposed structures, existing and proposed access drives and circulation drives; existing and proposed piers, docks or other mooring facilities; existing and proposed berms, dams or any other containment devices or method; and dimensions of the site, dimensions and capacity of each tank, dimensions from property line to tank(s), from containment to tank, from tank to tank and dimensions of access and circulation drives. 2. Description of any applicable vapor, emission or odor regulations. If the proposed tank is subject to federal or state regulations or other applicable best management practices with respect to vapor, emissions, and/or odor control, the application for conditional use permit shall include a statement as to the relevant regulatory authority or authorities and a summary of any equipment and technology being implemented to comply with such requirements or practices. 3. Tank approval application fee. The application fee shall be one thousand five hundred dollars ($1,500.00) per tank. E. Change in product classification. Applicant may only store a substance with a different NFPA classification than the NFPA classification listed in the application after providing written notice to the director of the change and engineering verification that the tank complies with the NFPA requirements for the new product classification.

(Ord. No. 64-017-2022, 7-12-22)

Ask a question about Mobile law

Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.