10.50.03 - Permit requirements and exclusions.

A. Applicability. Any clearing, grading, excavation, development, or other land altering activity that may result in any of the following impacts shall have been issued one (1) of the city-issued permits described in subsection (d) of this section prior to the start of the activity. 1. Disturbance of the ground surface layer exposing bare soil to the effects of erosion and allowing transport of sediments off-site to enter the storm drain system; 2. Changing the contouring and/or any other slope characteristics of the land; 3. Stopping, constricting, or rerouting the natural flow of water to, through or from any parcel of property. B. Exclusions. The following activities are excluded from the requirements and regulations of this chapter. 1. Timber harvesting on land not planned for development; 2. Permitted landfill operations; 3. Street/drainage construction being performed by or for the City of Conway; 4. Work by or for the Arkansas Department of Transportation (ARDOT); 5. Emergency street, storm drainage or utility repairs; 6. The otherwise legally permitted burial of human and animal remains; 7. Farming, livestock operations and gardening activities. C. Responsibility. The owner on which the construction activity is being performed, or their designated representative shall be responsible for assuring compliance with this chapter, including: 1. Obtaining the appropriate city-issued permit described below; 2. Establishing erosion/sediment control measures specified in this chapter; 3. Maintaining control measures throughout all phases of construction. The property owner shall be liable for any penalties or fines imposed. In addition, individuals and contractors may be cited, penalized, and fined for specific violations of this chapter. D. City-Issued Permits. The specific city-issued permit applicable to the type of land altering activity and/or project site location are as follows. 1. Grading Permit—Required for any site over one (1) acre in size where land altering activities occur unless one of the other city-issued permits below applies. 2. Site Development Permit—Required for any subdivision that requires preliminary plat approval or any development subject to the Development Review Process of the Conway Zoning Code. (Issued in lieu of the Grading Permit). 3. Residential Building Permit—Required for construction of a single-family or two-family dwelling. (Issued in lieu of a Grading Permit). 4. Floodplain Development Permit—Required for land altering activity on sites located within a designated floodplain. The permit and review processes are governed by City of Conway Ordinance O-09-15. (Issued in lieu of the Grading Permit, sites may additionally be subject to separate permitting requirements such as Development Review or Building Permits). E. ADEQ Permits. In addition to city-issued permits above, ADEQ requires that all construction activities on sites one (1) acre or larger have the following General Storm Water Permit documentation. 1. Storm Water Pollution Prevention Plan (SWPPP), all sites one (1) acre or larger; 2. Notice of Coverage (NOC), sites from one (1) acre to five (5) acres (small site); 3. Notice of Intent (NOI), sites larger than five (5) acres (large site) NOTE 1: For small construction sites (one (1) to five (5) acres), ADEQ does not require submittal of individual permit documents and there is no fee; however, the SWPPP and the automatic Notice of Coverage (NOC) shall be posted at the site prior to commencing construction. NOTE 2: For large construction sites (five (5) acres or more), SWPPP documentation and a Notice of Intent (NOI) must be submitted to ADEQ, along with a fee, for review and approval. The SWPPP and Notice of Coverage (NOC) shall be posted at the site prior to commencing construction.

(Ord. No. O-20-78, § 3, 12-8-2020)