For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.50.04 — Permit application process

Code of Ordinances of the City of Conway, Arkansas (Codified through Ordinance No. O-25-35, enacted April 22, 2025. (Supp. No. 10)) · Conway Code of Ordinances § 10.50.04

Corpus is an independent public-information project, not the official City of Conway website. Stable reference: corpuslaw.us/code/f1cb0610-d4a5-4029-bd29-1bac7d4a9fe9

10.50.04 - Permit application process.

All city-issued permits shall be submitted for review via electronic means or at City Hall on city issued forms. A. Grading Permit. Application for a Grading Permit shall be accompanied by the following, as applicable: 1. Site Plan containing applicable drainage and erosion control information, and slope excavation/fill design information if applicable, as specified below: General Information: • Owner/applicant name(s) and address(es) • Applicant's Consulting firm (if retained) and principal contact Existing Site Information: • Vicinity map clearly identifying site location • Ground contours and type of ground cover (twenty (20) feet beyond boundary) • Composite runoff curve number(s) • Precise location where storm water enters and exits the site • Drainage area contributing to drainageway entering the site and water shed area of drainage leaving the site • Surface drainage features (e.g., ponds, creeks, ditches, swales) • Storm drainage structures (e.g., drain inlets, drainage pipe, culverts) Proposed Site information: • New ground contours and type of ground cover • Composite runoff curve number(s) • Slope Excavation/Fill Design where applicable (See subsection D.(4) below) • New surface drainage features (e.g., earthen/concrete swales, berms, etc) • Downstream drainage structures to receive site runoff • Slope Excavation/Fill Design where applicable (See subsection (d)(4) below) 2. ADEQ Storm Water Pollution Prevention Plan (SWPPP) and the General Storm Water Permit Notice of Intent (NOI) for sites five (5) acres or larger, or a Notice of Coverage (NOC) for sites between one (1) and five (5) acres. B. Site Development Permit. Applications for a Site Development Permit will include submittal of design information for appropriate storm drainage infrastructure and storm water pollution prevention documentation as specified below: 1. All items required for a Grading Permit including Site Plan and ADEQ SWPPP. 2. Site Drainage Plan and Report prepared in accordance with the City of Conway Drainage Criteria Manual. 3. Projects subject to development review shall include all other information as required by the Conway Zoning Ordinance, O-17-91. 4. Subdivision development subject to preliminary plat approval shall include all other information as required for the subdivision application as listed in the Subdivision Ordinance, O-00-03. C. Residential Building Permit. Application for a Residential Building Permit shall be accompanied by an Erosion Control Compliance Certification and a signed Stormwater Pollution Prevention Agreement requiring compliance with storm water pollution prevention provisions of this chapter. NOTE: See Section 10.50.05 below for general Construction Site Erosion and Sediment Control Requirements. Guidance for implementation of storm water best management practices (BMP's) for compliance with these requirements on small residential construction sites is provided in the publication Storm Water Pollution Prevention for Small Residential Construction Sites as published by the United States Environmental Protection Agency (EPA 830-F-15-001) dated December 2015, as well as the City of Conway Standard Details for Roadway & Drainage Construction. D. Slope Excavation/Fill Design. For permitted activities with proposed excavation and/or fill on slopes steeper than three (3) feet horizontal to one (1) foot vertical (3:1), the following requirements must be met. 1. The excavation and/or fill be supported by an engineered soil retention system (i.e., retaining wall) with designs over five (5) feet tall stamped and signed by a registered professional engineer licensed in the State of Arkansas. 2. Any engineered soil retention system or series of systems over eighty-seven (87) inches tall must be constructed of architectural stone or other suitable aesthetic material approved by the city engineer. 3. Individual soil retention systems may not exceed fifteen (15) feet in height. Excavations or fills requiring additional height must use a series of systems with terraces, preserving portions of natural vegetation and/or providing areas for planting. 4. Terracing width shall be at a ratio of at least one (1) foot of horizontal terrace for every one (1) foot of vertical height up to a maximum of ten (10) feet. Terraces shall be landscaped with dense evergreen plantings sufficient to screen the wall. The terrace must be sloped to drain up to one (1) foot in ten (10) feet of width. 5. The terrace plantings shall include understory trees a maximum of fifteen (15) feet apart on centers. Two (2) shrubs shall be required for each tree planting. Trees and shrubs may be selected from a list maintained by the planning director. 6. Terrace landscaping shall be in addition to any landscaping as otherwise required by City Ordinances. 7. Exposed earth shall be planted with grass or covered in a suitable ground cover approved by the city engineer. Shrubs and groundcover shall be required at the discretion of the planning director. E. Permit Application Review. 1. For all Grading Permits and Floodplain Development Permits, the city engineer or his/her designee will review the respective application and accompanying documentation for compliance with this chapter. Within thirty (30) days of receipt of a complete application, city engineer shall act to approve, conditionally approve, or deny the permit. If the application is denied, a written statement as to the reasons for disapproval shall be returned to the applicant. 2. For all Site Development Permits, the city engineer or his/her designee will review the respective application and accompanying documentation for compliance with this chapter. Review shall occur as part of the applicable review process triggering the need for a Site Development Permit. (Development Review Process or Preliminary Plat Application) 3. For all Residential Building Permits, the building official or his/her designee shall verify all necessary documentation is included in the permit application prior to permit issuance. The building official at any time prior to or after issuance of a Residential Building Permit may seek a determination from the city engineer or his/her designee on whether a separate Grading Permit is warranted due to lack of compliance with this chapter or the presence of significant land altering activities on-site consistent with those items listed in section 10.50.03(a)(2), (3). If the city engineer or his/her designee determines a Grading Permit is warranted, the building contractor or property owner shall be required to obtain a Grading Permit prior to initiation or continuance of any work on-site.

(Ord. No. O-20-78, § 4, 12-8-2020)

Ask a question about Conway law

Corpus searches the Conway sections it holds and shows the ones that match, with their citations. Free, no sign-in.