10.50.05 - Construction site erosion and sediment control requirements.

A. Project Site Responsibility. Site responsibility shall be handled in accordance with section 10.50.03(c). In addition, the construction contractor shall be responsible for ensuring erosion and sediment control measures are implemented and maintained until the site is stabilized and a Certificate of Occupancy (CO) is issued. This responsibility includes preventing adverse impacts from storm water flowing onto adjacent property by ensuring the construction site is sloped at a minimum grade of two (2%) percent to direct storm water to either the curb & gutter or other drainage infrastructure located within either street right of way or a drainage easement as shown on the development's Final Plat. Upon completion of the permitted construction activity, the property owner shall be responsible for continued compliance with the requirements of this chapter on the site. B. Erosion and Sediment Control Best Management Practices (BMP). All construction sites within the City of Conway that require a permit as listed in section 10.50.03 above, including single-family two-family structure construction, shall have measures in-place to address the following, as applicable. Design criteria is established in the City of Conway Standard Details for Roadway & Drainage Construction for compliance with the provisions of this chapter. These measures shall be shown explicitly in the site SWPPP for sites larger than one (1) acre. • Perimeter Erosion and Sediment Control • Curb and Inlet Protection • Construction Entrance/Exits • Concrete Truck Wash Areas • Dirt and Topsoil Storage • Dust Control • Good Housekeeping 1. Stream crossings shall be designed and installed in a manner to minimize soil disturbance and potential erosion. For sites where regular traversing of streams must be made, the crossing location will require stabilization before, during, and after construction. 2. Good housekeeping practices shall be implemented on the project site to eliminate trash and debris from entering storm drainage system. All water pumped out of sumps, depressions, or sediment control areas should be clear water free of sediments. In addition, any chemicals or compounds (including paint, fertilizer, solvents, petroleum products or other contaminants) shall be stored and handled in a manner that will prevent ant potential for the materials being carried into the city storm drainage system. Techniques shall be employed to prevent the blowing of dust or sediment from the site. 3. Stabilization measures shall be initiated within fourteen (14) days in portions of the site where construction activities have ceased, including uncovered stockpiles of soil. Stockpiles shall be located a minimum of twenty-five (25) feet from a roadway or drainage way. Techniques shall be employed for the diversion of upland runoff, seeding of the site perimeter, or other measures to protect exposed soils. 4. Clearing, except as necessary to establish sediment control devices, shall not begin until all sediment control devices have been installed and stabilized. Clearing and grading of natural resources, such as forests and wetlands, shall not be permitted except when in compliance with all other state and federal regulations. 5. All disturbed surfaces shall be permanently stabilized with seeding, paving or other measures to prevent soil from being exposed to storm water runoff. Neither a Certificate of Occupancy (CO), nor Certificate of Compliance (CoC) shall be issued until after permanent stabilization. NOTE: Control measures shall generally conform to the guidance provided in the publication Developing Your Stormwater Pollution Prevention Plan—A Guide for Construction Sites as published by the United States Environmental Protection Agency (EPA 833-R-06-004) dated May 2007. C. Monitoring/Inspection/Maintenance. The Storm Water Pollution Prevention Plan or site "Erosion Control Compliance Certification" shall designate an agent representing the owner who will be responsible for inspecting and monitoring the Storm Water Pollution Prevention Measures throughout construction and until final, permanent stabilization. The designated agent shall evaluate and ensure the overall effectiveness of the storm water pollution prevention measures and the need for additional or revised measures. Observation of any "muddy water" leaving a construction site will be considered a violation of this chapter. Inspections shall be made at least weekly and immediately following rainfall events and, in addition, at the following construction milestones. • Start of construction • Installation of sediment and erosion measures • Completion of site clearing • Completion of rough grading • Completion of final grading • Close of the construction season • Completion of final landscaping • Every two weeks following stabilization until a Certificate of Occupancy (CO) or Certificate of Completion (CoC) is issued. For sites requiring a SWPPP, the inspections shall be documented and shall clearly state deficiencies in the implementation of the plan and provide a detailed description of the items of work needed to bring the plan into compliance. The work description shall include a method of confirming that deficiency reports are presented to the party responsible for correcting the problem. A copy of the SWPPP and inspection reports shall be maintained on site in a waterproof enclosure that can be readily accessed by city personnel. NOTE: City personnel may enter the property of the applicant as deemed necessary to make regular inspections to ensure compliance with this chapter. Failure to maintain proper erosion and sediment controls may result in enforcement action being taken (see section 10.50.07 below). Failure to provide for adequate and appropriate site drainage may result in withholding of the Certificate of Occupancy (CO) or Certificate of Completion (CoC).

(Ord. No. O-20-78, § 5, 12-8-2020)