§ 166.02 — Development Review Process
Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 166.02
Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/16e8b8e0-0e0b-43f1-8d5b-c7fdae04a061
166.02 - Development Review Process
(A) Application Submittal (1) Submittal. All development applications shall be submitted to the Planning Division and will be processed for review in accordance with Planning Division operating procedures. (B) Public Meetings. Development applications are required to be processed through the Technical Plat Review Committee, Subdivision Committee, and Planning Commission as follows: (1) Technical Plat Review Committee. The following development applications are required to be reviewed by the Technical Plat Review Committee: Lot split, small site improvement plans, large site improvement plans, large scale development, planned zoning district with or without concurrent development, preliminary plat, final plat, concurrent plat, and concept plan. After the Technical Plat Review Committee meeting staff may administratively approve lot splits, final plats, small site improvement plans, and large site improvement plans after review for compliance with all applicable codes subject to UDC §166.02(C). No approval is necessary for concept plans. (2) Reserved. (3) Planning Commission. The following development applications are required to be reviewed by the Planning Commission. Large scale development forwarded by the Subdivision Committee, preliminary plat, concurrent plat, and planned zoning district with or without concurrent development. The Planning Commission may approve, deny, table, or approve development applications with conditions. A planned zoning district cannot be approved by the Planning Commission, but may be forwarded to City Council. (C) Approval and Denial Criteria (1) Administrative Approval. The following applications shall be approved administratively by the Planning Division as long as the proposal meets all requirements of the Unified Development Code: Property line adjustment, lot split, final plat, small site improvement plan, and large site improvement plan. Approval by the Planning Commission for these applications is not required unless an appeal is filed in accordance with Chapter 156 of the UDC. Concept plans are not subject to approval or denial. (a) Reasons for Denial. The Planning Division may refuse administrative approval based on the following criteria: (i) Property Line Adjustment; Lot Split. The application does not comply with zoning and development requirements including, but not limited to: Lot width, lot area, setback requirements, buildable area, required parking, impervious surface, dedication of required right-of-way or easements, etc., or the requested action would make an existing non-conforming property or structure more non-conforming. (ii) Final Plat. The conditions of approval of the preliminary plat have not been met, the proposed plat does not meet the zoning and development requirements of the UDC, and/or the required improvements have not been completed or guaranteed in accordance with Fayetteville Unified Development Code Chapter 158. (iii) Small or Large Site Improvement Plans. The Planning Division may refuse to approve a small or large site improvement plan for any of the following reasons: (a) The development plan is not submitted in accordance with the requirements of this chapter. (b) The proposed development would violate a city ordinance, a state statute, or a federal statute. (c) The developer refuses to dedicate the street right-of-way, utility easements or drainage easements required by this chapter. (d) The proposed development would create or compound a dangerous traffic condition. For the purpose of this section, a dangerous traffic condition shall be construed to mean a traffic condition in which the risk of accidents involving motor vehicles is significant due to factor such as, but not limited to, high traffic volume, topography, or the nature of the traffic pattern. (e) City water and sewer is not readily available to the property within the site improvement plat area and the developer has made no provision for extending such service to the development. (f) The developer refused to comply with ordinance requirements or condition of approval for on-site and off-site improvements. (2) Planning Commission Approval. The following applications shall be approved by the Planning Commission, subject to the criteria listed below: Large scale development, preliminary plat and concurrent plat. (a) Reasons For Denial. The Planning Commission may refuse to approve a large scale development, preliminary plat or concurrent plat for any of the following reasons: (i) The plat or development plan is not submitted in accordance with the requirements of this chapter. (ii) The proposed development would violate a city ordinance, a state statute, or a federal statute. (iii) The developer refuses to dedicate the street right-of-way, utility easements or drainage easements required by this chapter. (iv) The proposed development would create or compound a dangerous traffic condition. For the purpose of this section, a dangerous traffic condition shall be construed to mean a traffic condition in which the risk of accidents involving motor vehicles is significant due to factors such as, but not limited to, high traffic volume, topography, or the nature of the traffic pattern. (v) City water and sewer is not readily available to the property within the large scale development, preliminary plat, or concurrent plat and the developer has made no provision for extending such service to the development. (vi) The developer refused to comply with ordinance requirements or conditions of approval for on-site and off-site improvements. (D) Plat Recordation or Construction Plan Approval. After obtaining approval by the appropriate governing body, the applicant shall follow the procedures set forth below in order to record the plat or obtain construction plan approval. (1) Property Line Adjustment, Lot Split, Building Permit, Final Plat, Concurrent Plat. The applicant shall submit copies of the approved plats containing all required signatures to the Planning Division for final approval. The plats shall be recorded by the applicant and copies of the recorded plats provided to the Planning Division as required. (2) Preliminary Plat, Large Scale Development and Small or Large Site Improvement Plan. Receipt of the approval authorizes the applicant to proceed with: (a) The preparation of plans, reports and specifications in accordance with City Engineering requirements including but not limited to: (i) Street plans, profiles and specification accompanied by soil analyses and design calculations; (ii) Storm drainage plans, profiles and specifications accompanied by soil analyses and design calculations; and (iii) Water and sewer plans, profiles and specifications, accompanied by design calculations, to be reviewed and approved by City Engineering. (iv) Final site plans, landscape plans, and other plans, reports and specifications required by the city to obtain approval. (b) Once all approvals that are required have been obtained, the applicant may proceed with site preparation and construction in accordance with the permitted plans. (E) Building Permits. (1) Before a building permit is issued the developer shall: (a) Dedication of Right-of-Way. Dedicate right-of-way in compliance with the city's Master Street Plan, and in compliance with the requirements for on- or off-site improvements. (b) Dedicate all easements necessary to serve the development as required by the utility providers and the city. This may be completed by easement plat or separate easement document(s), with approval of the Planning Division. (c) Comply with all applicable zoning and development codes. (d) In addition, for small site improvement plans, large site improvement plans and large scale developments, the developer shall: (i) Obtain approval from the appropriate governing body. (ii) On and Off-Site Improvements. Construct or guarantee required on- and off-site improvements in accordance with UDC Chapter 158. (iii) Complete applicable conditions of approval. (2) In addition to §166.02(E), before a building permit is issued for site that develops and/or redevelops between 1,201 and 10,000 square feet of impervious area, where a corresponding subdivision of land is not proposed, the developer shall complete, and receive approval of, appropriate grading and drainage documentation demonstrating compliance with UDC Chapters 169 and 170 as well as the current City Drainage Criteria Manual per the table below. Impervious areas will be considered as existing only if they are in place on March 3, 2021 which corresponds with the City of Fayetteville 2021 imagery. Required Mitigation Measures and Documentation by Development Threshold Development Threshold | City-wide Standard | Grading and Drainage/ Stormwater Documentation | Water Quality, Flood, and Tree Mitigation Measures Level 1 | < or = 1,200 sf of IA | Exempt from Grading and Drainage provisions except for those still associated with the Building Permit process such as HHOD | Exempt Level 2 | 1,201—6,000 sf of IA | • Completed Green Stormwater Practice (GSP) Worksheet, demonstrating Runoff Reduction via Better Site Design. • GSP Operation & Maintenance (O & M) Agreement to ensure the long-term functionality of these practices. | • 2 or more measures from Step 1 of Table 2 that Reduce Runoff via Better Site Design • 1 or more Green Stormwater Practices (GSPs) measures from Step 2 of Table 2 as required to treat 100% of the proposed additional impervious and gravel areas. • Abbreviated Tree Preservation Plan Level 3 | 6,001—10,000 sf of IA | Same as Level 2. | • Same as Level 2. • As needed GSP measures from Step 3 to further reduce runoff referred to as extended detention • Abbreviated Tree Preservation Plan (F) Completion of Development/Certificate of Occupancy. No certificate of occupancy for a large-scale development, large site improvement plan, or small site improvement plan shall be issued, and no final plat or concurrent plat shall be signed for recordation until the following have been completed: (1) The requirements for on and off-site improvements have been completed, and maintenance bonds/guarantees deposited to city specifications. (2) An "as built" plot plan has been approved by the City Engineer (where applicable) showing: (a) The location of all buildings and the setback distance for said buildings from street right-of-way and adjoining property lines; (b) The location of any freestanding signs and the setback distance of said signs from street right-of-way and adjoining property lines; (c) The location, number, dimensions, and surfacing of all parking spaces and of all screens or fences; (d) The location and size of all water, sewer, gas, electric, telephone, and television cable lines; (e) The location and size of all stormwater features with associated drainage easements demarcated, where applicable; and (f) The location and quantity of existing and new impervious area on the property. (3) The development has been inspected and approved by all applicable city divisions. (4) All applicable conditions of approval have been completed.
(Code 1965, App. C., Art. II, §§F—H; Ord. No. 2581, 12-4-79; Code 1991, §§159.16—159.18; Ord. No. 4100, §2 (Ex. A), 6-16-98; Ord. No. 5296, 12-15-09; Ord. No. 5653, 01-21-14; Ord. No. 6061, §2, 4-17-18; Ord. No. 6446, §8(Exh. C), 6-15-21; Ord. No. 6539, §5(Exh. A), 3-1-22; Ord. No. 6785, §§ 4—6, 8-20-24; Ord. No. 6786, § 1, 8-20-24; Ord. No. 6833, §5, 1-21-25)
Ask a question about Fayetteville law
Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.